Project overview

Platinum Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800006845. Platinum Heights is located at Cts No 189-190, Hissa No 01, Survey No 118. This is a Ongoing being developed by Trident Ozone Llp.

Platinum Heights has 1 BHK, 1 BHKREHAB & 1RK Apartments with carpet areas ranging from 263 to 332 Sq.ft. Carpet. The Project has total 441 of which 319 are currently available for sale.

Platinum Heights is being developed on a total land area of 46906 Sq.ft. out of which 7238 Sq.ft. i.e 15% is reserved for recreational purposes. Platinum Heights has 4 Wings / Towers Shubham Sra Chs Wing C,Wing A,Wing B,Wing D

ProjectDeveloperLocationPossession
Vaikunth Dham Chs LtdShivshankar Singh & Others164 1 To 730-12-2022 00:00:00
Sanghvi AtlantaAtlanta Properties400078, Mumbai Suburban30-12-2022 00:00:00
Beauty HeightsBeauty Sankalp Builders Llp186/1, 188/20, 18631-03-2018 00:00:00
Neptune Flying Kites B Wing- Left WingNeptune Ventures And Developers Private Limited372 372/1 To 6531-12-2018 00:00:00
Samriddhi Garden Wing C Gulmohar Wing D DeodharSivana Realty Private Limited403 C30-09-2020 00:00:00
Neptune Eleve Wing BNeptune Ventures And Developers Private Limited372, 372/1 To 6530-12-2026 00:00:00
Platinum HeightsTrident Ozone LlpCts No 189-190, Hissa No 01, Survey No 11830-12-2025 00:00:00
Skicity Phase 1Skicon Infrastructure Co210/38B, 210/39 To 88 Of Village Bhandup, Part Of Cts Nos 210/38A30-12-2023 00:00:00
Neptune Flying Kites A Wing - Right WingNeptune Ventures And Developers Private Limited372 372/1 To 6531-12-2018 00:00:00
Joys Adinath Tower Ii Wing AJoy Homecreation Limited406B30-06-2021 00:00:00
Sai Sastha CrystalMs Sai Sastha Enterprises161/1To37, 162/1To8, 16230-12-2021 00:00:00
Neptune Eleve Wing CNeptune Ventures And Developers Private Limited372 / 1 To 65, 37230-12-2026 00:00:00
Jeevan AnandSuyog Developers31 A, 33 Part, 31 B Part30-06-2021 00:00:00
Beauty LandmarkBeauty Ganraj Construction Llp149/1, 14931-07-2018 00:00:00
Leo Group Housing ComplexSir George JosephMumbai Suburban, 40007831-12-2018 00:00:00
Om Siddhivinayak Chs LtdShree Shiv Samarth Reality5Pt 5/3 5/4 5/5 5/6Pt 5/7Pt 6Pt 6/1 To 9 Of Village Kanjur 11Pt And 12Pt Of Village Bhandup31-12-2028 00:00:00
Puro HeightsPuro Constructions539 Pt 539 1 To 43 1334 1334 1 1335 1335 1 To 23 133631-12-2031 00:00:00
Navneet Sadan Chs LtdShree Swami Samarth Builders & Developers21Pt, 22Pt30-12-2022 00:00:00
Neptune Eleve Wing DNeptune Ventures And Developers Private Limited372, 372 /1 To 6530-12-2026 00:00:00
Shraddha Orchid AvenueShraddha Landmark Private Limited35 Pt And 35A31-12-2017 00:00:00
Sudhanshu ImperiaSudhanshu Infrastructures Pvt Ltd51, Cst No.44, 4501-02-2020 00:00:00
Airica Tower 1Jai Hind Oil Mills Company611, 611/1 To 1031-12-2029 00:00:00
Airica Tower 4Jai Hind Oil Mills Company611, 611/1 To 1031-12-2029 00:00:00
Sharda HeightsShivshankar Singh & OthersCts No. 100/8(Part), 100/13A (Part) & 100/14A31-12-2028 00:00:00
Project Details
  • Project:
    Platinum Heights
  • Location:
  • Cts No 189-190, Hissa No 01, Survey No 118
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Trident Ozone Llp
  • Phone:
  • Address:
  • Sachdev Complex
Project RERA Details
MAHA REARA No: P51800006845
Project Type Others
RERA Project Status Ongoing
Architect Dhaneshwar Pakhare And Associates
Funding Bank AU SMALL FINANCE BANK LIMITED
Proposed Possession 30 Dec 2025
Revised Possession 30 Dec 2025
Extended Possession
Litigations No Litigations
Last Modified 16 Aug 2017
Last Retrived 26 Jul 2025
Platinum Heights QR Code
Platinum Heights
MahaRERA - P51800006845
Apartment Details & Configuration
TypeArea
1 BHKREHAB26.64 Sq.mts. ( 287 Sq.ft. )
BALWADIS21.61 Sq.mts. ( 233 Sq.ft. )
SHOPS11.55 Sq.mts. ( 124 Sq.ft. )
SHOPS12.99 Sq.mts. ( 140 Sq.ft. )
SHOPS16.66 Sq.mts. ( 179 Sq.ft. )
SHOPS18.58 Sq.mts. ( 200 Sq.ft. )
SHOPS19.25 Sq.mts. ( 207 Sq.ft. )
SHOPS SALEABLE9.3 Sq.mts. ( 100 Sq.ft. )
SHOPS SALEABLE9.44 Sq.mts. ( 102 Sq.ft. )
SOCIETY OFFICE20.44 Sq.mts. ( 220 Sq.ft. )
1 BHK30.94 Sq.mts. ( 333 Sq.ft. )
1 BHK30.96 Sq.mts. ( 333 Sq.ft. )
1 BHK32.9 Sq.mts. ( 354 Sq.ft. )
1 BHK34.64 Sq.mts. ( 373 Sq.ft. )
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )
1 BHK30.91 Sq.mts. ( 333 Sq.ft. )
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )
1 BHK35.45 Sq.mts. ( 382 Sq.ft. )
1RK24.08 Sq.mts. ( 259 Sq.ft. )
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )
1 BHK30.89 Sq.mts. ( 332 Sq.ft. )
1RK24.43 Sq.mts. ( 263 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Platinum Heightslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station75% completed
75% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements75% completed
75% Complete
Na
Landscaping & Tree Planting100% completed
95% Complete
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)75% completed
75% Complete
Municipal Sewer
Solid Waste Management And Disposal100% completed
95% Complete
Na
Storm Water Drains75% completed
75% Complete
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Stp
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply
Na
Buildings / Wings in Platinum Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Platinum Heights by Trident Ozone Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

46906 Sq. ft.

Project Area

7238 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

441 apartments in total
Total
441
Booked
122
Available
319

Saleable Area Statistics (Sq. ft.)

141214 Total
Total
141214
Booked
43603
Available
97611
Total 441 apartments in project. 122 apartments booked. 27% apartments booked.
Total 141214 Sq.ft. saleable area. 43603 saleable area booked.
31% area booked.

Shubham Sra Chs Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shubham Sra Chs Wing CJan 190023111102
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKREHAB26.64 Sq.mts. ( 287 Sq.ft. )164
None Booked0% Booked
0% Booked
BALWADIS21.61 Sq.mts. ( 233 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOPS11.55 Sq.mts. ( 124 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOPS12.99 Sq.mts. ( 140 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOPS16.66 Sq.mts. ( 179 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOPS18.58 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOPS19.25 Sq.mts. ( 207 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOPS SALEABLE9.3 Sq.mts. ( 100 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOPS SALEABLE9.44 Sq.mts. ( 102 Sq.ft. )3
None Booked0% Booked
0% Booked
SOCIETY OFFICE20.44 Sq.mts. ( 220 Sq.ft. )1
None Booked0% Booked
0% Booked
WELFARE CENTRE21.61 Sq.mts. ( 233 Sq.ft. )2
None Booked0% Booked
0% Booked
178 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Shubham Sra Chs Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 202423111102
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.94 Sq.mts. ( 333 Sq.ft. )22
19 Booked86% Booked
86% Booked
1 BHK30.96 Sq.mts. ( 333 Sq.ft. )21
20 Booked95% Booked
95% Booked
1 BHK32.9 Sq.mts. ( 354 Sq.ft. )19
19 Booked100% Booked
100% Booked
1 BHK34.64 Sq.mts. ( 373 Sq.ft. )20
18 Booked90% Booked
90% Booked
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )22
15 Booked68% Booked
68% Booked
104 total apartments / 91 apartments booked. 87% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 202423101102
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.91 Sq.mts. ( 333 Sq.ft. )22
None Booked0% Booked
0% Booked
1 BHK30.96 Sq.mts. ( 333 Sq.ft. )19
None Booked0% Booked
0% Booked
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )22
None Booked0% Booked
0% Booked
1 BHK32.9 Sq.mts. ( 354 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK35.45 Sq.mts. ( 382 Sq.ft. )22
1RK24.08 Sq.mts. ( 259 Sq.ft. )21
None Booked0% Booked
0% Booked
127 total apartments / 2 apartments booked. 1% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress57% done
57% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DDec 202412101102
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK30.89 Sq.mts. ( 332 Sq.ft. )10
9 Booked90% Booked
90% Booked
1 BHKREHAB30.89 Sq.mts. ( 332 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHKREHAB30.52 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK24.43 Sq.mts. ( 263 Sq.ft. )10
10 Booked100% Booked
100% Booked
32 total apartments / 29 apartments booked. 90% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Trident Ozone Llp
for Project
Platinum Heights
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation