PINNACLE ADARSH is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700050363. PINNACLE ADARSH is located at Survey No 5 Hiss No 4 Plot No 9. This is a New being developed by PINNACLE ENTERPRISES.

PINNACLE ADARSH has 1 BHK, 1RK & Shop Apartments with carpet areas ranging from 116 to 102 Sq.ft. Carpet. The Project has total 25 of which 7 are currently available for sale.

PINNACLE ADARSH is being developed on a total land area of 3143 Sq.ft. PINNACLE ADARSH has 1 Wings / Towers Pinnacle Adarsh

ProjectDeveloperLocationPossession
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
SHASHWAT PARKMODERN CONSTRUCTIONGat No. 65 Hissa No. 2V31-12-2018 00:00:00
SADGURU HARMONY PH-1 WING ASADGURU ASSOCIATEGut No 219/1/2 21831-12-2019 00:00:00
Project Details
  • Project:
    PINNACLE ADARSH
  • Location:
  • Survey No 5 Hiss No 4 Plot No 9
  • Const. Stage:
    New
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    PINNACLE ENTERPRISES
  • Phone:
  • Address:
  • Buildcing Type C Trident Tower
Project RERA Details
MAHA REARA No: P51700050363
Project Type Residential / Group Housing
RERA Project Status New
Architect Pramod Patil And Associates
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Jun 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 05 Apr 2023
Last Retrived 13 Feb 2026
PINNACLE ADARSH QR Code
PINNACLE ADARSH
MahaRERA - P51700050363
Apartment Details & Configuration
TypeArea
1 BHK29.88 Sq.mts. ( 322 Sq.ft. )
1RK17.97 Sq.mts. ( 193 Sq.ft. )
1RK21.56 Sq.mts. ( 232 Sq.ft. )
Shop9.48 Sq.mts. ( 102 Sq.ft. )
Shop10.78 Sq.mts. ( 116 Sq.ft. )
Shop11.65 Sq.mts. ( 125 Sq.ft. )
Shop14.67 Sq.mts. ( 158 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of PINNACLE ADARSHlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking100% completed
95% Complete
At The Time Of Possession
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Sewer Line And Chamber
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
After Competion
Buildings / Wings in PINNACLE ADARSH
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of PINNACLE ADARSH by PINNACLE ENTERPRISESlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

3143 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

25 apartments in total
Total
25
Booked
18
Available
7

Saleable Area Statistics (Sq. ft.)

5663 Total
Total
5663
Booked
4251
Available
1412
Total 25 apartments in project. 18 apartments booked. 72% apartments booked.
Total 5663 Sq.ft. saleable area. 4251 saleable area booked.
75% area booked.

Pinnacle Adarsh

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pinnacle AdarshJun 202571010250
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.88 Sq.mts. ( 322 Sq.ft. )7
5 Booked71% Booked
71% Booked
1RK17.97 Sq.mts. ( 193 Sq.ft. )6
5 Booked83% Booked
83% Booked
1RK21.56 Sq.mts. ( 232 Sq.ft. )7
6 Booked85% Booked
85% Booked
Shop9.48 Sq.mts. ( 102 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.78 Sq.mts. ( 116 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.65 Sq.mts. ( 125 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop14.67 Sq.mts. ( 158 Sq.ft. )1
1 Booked100% Booked
100% Booked
25 total apartments / 18 apartments booked. 72% apartments booked.
Work Description in Building Pinnacle AdarshCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
PINNACLE ENTERPRISES
for Project
PINNACLE ADARSH
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation