Project overview

Pink City Trident Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700001716. Pink City Trident Phase 2 is located at Thane, 421501. This is a On-Going Project being developed by Ami Infra.

Pink City Trident Phase 2 has 1 BHK, 2 BHK, SHOP & SHOPS Apartments with carpet areas ranging from 125 to 445 Sq.ft. Carpet. The Project has total 116 of which 44 are currently available for sale.

Pink City Trident Phase 2 is being developed on a total land area of 41172 Sq.ft. out of which 4117 Sq.ft. i.e 10% is reserved for recreational purposes. Pink City Trident Phase 2 has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Shree Sai LeelaShree Sai Builders & DevelopersPlot No.6, S.No. 86/330-06-2018 00:00:00
NiloyShree Sai Builders & DevelopersCts No 437831-12-2019 00:00:00
Shree Sai PanacheGyandev Builders & DevelopersCts No 142 Hissa No 530-12-2020 00:00:00
Britto HouseShree Sai Builders & DevelopersPlot No 5 Cts No 2269 To 2274 S No 166 Hisa No 1231-12-2018 00:00:00
Panvelkar CrownRahul Vijay PanvelkarCts No 932131-12-2018 00:00:00
Pramukh SadanSahajanand DevelopersSurvey No - 39A Hissa No-1A, 1B31-03-2019 00:00:00
Patel Residency NxNavnirman DevelopersSurvey No 2 Hissa No 4B30-07-2018 00:00:00
Patels ResidencyParam Builders And DevelopersSurvey No 5 Hissa No 19 Plot B31-03-2018 00:00:00
Patels PridePride InfrastructureSurveyno 25 Hissa No 23 Plot A And B31-12-2018 00:00:00
Manas ResidencyManas EnterprisesSurvey No 57 Hissa No 231-12-2018 00:00:00
Shiv Parvati ResidencyShrikrishna DevelopersPardi No 193B Cts 6016 To 6026 6057 To 6073 6133 To 6134 9662 Mouje Kohoj Khutavali31-03-2019 00:00:00
Ashapura Builders And DevelopersAshapura Builders And DevelopersGut No. 54 Part, Plot No. 831-12-2017 00:00:00
Neels ResidencyS.A. Singh Builders And DevelopersSurvey No 85 Hissa No 2 B21-11-2018 00:00:00
Vedant VatikaVedant VentureSurvey No 63, Hissa No 4A8, Plot No 1331-12-2019 00:00:00
Neelkrishna Amalgamated Project Of Neelam Chs Ltd And Krishna Milan Chs LtdOm Sai InfraPlot No 619 Cts No. 6822 To 6828 And 682931-03-2027 00:00:00
Ishwar Om TulsiIshwar RealityPlot No 6, S No 43/4/11, Cts No 8863/A31-12-2023 00:00:00
Ishwar New AmitIshwar DevelopersPlot No 8, Survey No 54/17/6, Cts No 665331-05-2025 00:00:00
Vishwajeet EliteVishwajeet MeadowsGut No 32/2 Plot No 5,6,7 And 8 Cts 9572 Village Morivali Tal Ambernath31-12-2018 00:00:00
Pink City Trident Phase 2Ami InfraThane, 42150130-04-2020 00:00:00
Patels SapphirePramukh DevelopersS.No.50, Hissa No.7, Cts No.7721B31-08-2024 00:00:00
Panvelkar GalaxyGeetai InfrastructurePlot No 399, C.T.S No 4709, Suryoday Co-Op Housing Society At Village Kansai Ambernath East29-02-2024 00:00:00
Patels FalconPramukh DevelopersPlot No. 583, Cts No. 7577 To 758330-06-2024 00:00:00
Swami DhamShree Ayyappa Constructions4347 434830-06-2018 00:00:00
WoodlandShaurya Infra Builders And DevelopersPlot No.H-3, S.No.39P And 41P26-12-2018 00:00:00
Aashray Pearl Wing CAashraygroupSy No 55/130-05-2023 00:00:00
Dalal KalashAdvance BuildconPlot No 1 And 2, Village Morivali, Survey No. City Survey No. 916831-12-2027 00:00:00
Ishwar GajananIshwar RealityPlot No 9 Survey No 33 H No 6 Cts 9001 Vadavali Ambernath 42150131-12-2027 00:00:00
Manav Sangeet ChsConcept DevelopersPlot No17/18 Cts No 9005/B/17 And Cts No 9005/B/1831-12-2027 00:00:00
Saburi ChsMarathe EnterprisesPlot No 507, Cts No. 7277 To 727931-12-2027 00:00:00
Ishwar EnclaveIshwar EnterprisesS No 540 Cts 1968P30-06-2018 00:00:00
Anita Cooperative Housing Society Ltd.Gyandev Builders & DevelopersPlot No. 7, Cts No. 9000, S. No. 33 6 Pt30-11-2020 00:00:00
HrishaYadav Bro''s ConstructionsS No 7A H No 1/2 Plot No 430-01-2022 00:00:00
Jainam ResidencyKbp CorporationSno 49 Hno 2C- Plot-A2 , Sno 65 Hno 1B - Plot A30-01-2021 00:00:00
Yogi NiwasElite InfrastructureSurvey No 39A Hissa No 1A30-06-2018 00:00:00
Yashodhara Co-Op Housing SocietySuresh Keshavrao Yashvantrao20131-01-2021 00:00:00
Patels EmeraldPramukh InfrastructuresSurvey No 38A Plot No 22930-06-2024 00:00:00
Ram AmbarPramukh InfraconSurvey No 60 Hissa No 12 Cts No 899630-06-2025 00:00:00
Ishwar ShubhlaxmiIshwar RealityPlot No 22 Cts No6653p31-12-2021 00:00:00
Namaskar Co-Op Hsg SocietyV. R. BuildersPlot No 4 Gut No 5330-03-2023 00:00:00
Omkar TowerOmkar ConstructionPlot No 8, 931-12-2017 00:00:00
Sai ResidencyKalpavruksha DevelopersSurvey No 19 Hisssa No 231-12-2017 00:00:00
Hill Park Co-Operative Housing Society LimitedUnigrow On Infrastructure Housing LlpCts No 8971/22 And Cts No 8971/2331-08-2028 00:00:00
Kamini A Wing Co-Operative Housing Society LtdShreeyansh Builders And Developers896031-12-2027 00:00:00
Patels AstrumNexa Construction LlpS No.38/A Plot No.23730-04-2027 00:00:00
Kher EnclaveAmi PropertiesPlot No 557, Cts No 7596 And 759731-12-2026 00:00:00
Omkar ApartmentOmkar Infra880/A31-12-2017 00:00:00
Sophia ApartmentAaria Enterprises421501, Thane15-04-2020 00:00:00
Mount ViewBalkrishna Kashinath BhoirSurvey No 67 H No 3A And Survey No 68 H No 9B31-12-2017 00:00:00
Mahavir Paradise , Phase - 1Mahavir EnterprisesS No 122/1 122/2 123/1 P30-12-2022 00:00:00
Radha Vasant Vihar Wing - R1Shiv Sagar Developers & BuildersSurvey No. 64 Hissa No. 5 Village Pale Taluka Ambernath Dist Thane30-03-2022 00:00:00
Sanjeevani Co-Op Housing Society LtdSiddhartha ConstructionsPlot No 18 Cts No 8851 Survey No 43A( New S No 43/1/34) Hissa No A/12 & 1/1 (Pt)31-12-2026 00:00:00
Patels AspirePramukh DevelopersSurvey No.50 Hissa No.6 Cts No.7749 To 7754 (Part) Survey No.50 Hissa No.13 Cts No.7746 To 7748 And 7754 (Part)31-12-2026 00:00:00
Tulsi VatikaShri Kalki EnterprisesSurvey No. 13/1 , Hissa No.17/1231-03-2030 00:00:00
Dreamland Co-Op Hsg Society Ltd.Vishwanath Panvelkar421501, Thane31-03-2022 00:00:00
Galaxy Trisha ApartmentShree Ganesh DevelopersCts No 68/1 S.No 27/214-08-2018 00:00:00
DhavlgiriPerfect Builders877630-04-2018 00:00:00
Parijat Co Operative Housing Society Limited Phase IiRohra ConstructionsSurvey No 74 Hissa No 2 And 331-12-2018 00:00:00
Vastu Siddhi , Phase IiSiddhivinayak GroupS.No.1115/1A30-03-2023 00:00:00
Shree Galaxy HeightsV3 RealitySurvey No 133 Hissa No 1 B30-12-2022 00:00:00
Golden HeightsJainam RealtyPlot No. 500, Cts No. 7307, Survey No. 15/231-12-2027 00:00:00
Ashok SmrutiAsha ConstructionPlot No- 2, Cts No- 8987, Survey No- 33/6/1730-09-2026 00:00:00
Soman Shrishti VillaSoman Sons Nirmaan LlpCts No 7462, S. No. 38 Ch31-12-2029 00:00:00
Soman Shrishti ASoman Sons Nirmaan LlpCts No 7462, S. No. 38 Ch31-12-2029 00:00:00
Vardhaman HomesJay Ambe DevelopersGut No.22-Cts No.9317, Gut No 24-Cts No.932031-12-2018 00:00:00
Motiram Darshan NxMotiram Darshan NxGut No 27 Plot No 730-06-2019 00:00:00
Shanti GardenKamya EnterprisesSurvey No 6/1/5330-12-2021 00:00:00
Aashray AanandAashray Infra140/2A And 141/1B30-05-2023 00:00:00
MansarovarRk Construction161/231-12-2018 00:00:00
Victoria House Phase ILifespace Realty935430-06-2018 00:00:00
Project Details
  • Project:
    Pink City Trident Phase 2
  • Location:
  • Thane, 421501
  • Const. Stage:
    On-Going Project
  • Possession:
    30 Apr 2020
Developer Details

  • Developer:
    Ami Infra
  • Phone:
  • Address:
  • Gut No 48, Pink City, Near Royal Park, Navare Nagar, Navare Nagar, 421501
Project RERA Details
MAHA REARA No: P51700001716
Project Type Others
RERA Project Status On-Going Project
Funding Bank BANK OF MAHARASHTRA
Proposed Possession 30 Apr 2020
Revised Possession 30 Oct 2020
Extended Possession 30 Apr 2022
Litigations No Litigations
Last Modified 15 Jul 2021
Last Retrived 28 Jul 2025
Pink City Trident Phase 2 QR Code
Pink City Trident Phase 2
MahaRERA - P51700001716
Apartment Details & Configuration
TypeArea
1 BHK31.29 Sq.mts. ( 337 Sq.ft. )
1 BHK32.93 Sq.mts. ( 354 Sq.ft. )
2 BHK42.95 Sq.mts. ( 462 Sq.ft. )
SHOP15.4 Sq.mts. ( 166 Sq.ft. )
SHOP16.27 Sq.mts. ( 175 Sq.ft. )
SHOP20.62 Sq.mts. ( 222 Sq.ft. )
SHOP21.31 Sq.mts. ( 229 Sq.ft. )
1 BHK35.18 Sq.mts. ( 379 Sq.ft. )
2 BHK41.32 Sq.mts. ( 445 Sq.ft. )
SHOP11.61 Sq.mts. ( 125 Sq.ft. )
SHOP12.29 Sq.mts. ( 132 Sq.ft. )
SHOP20.47 Sq.mts. ( 220 Sq.ft. )
SHOPS16.2 Sq.mts. ( 174 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pink City Trident Phase 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
385.202 Sq. Mt
Community Buildings
Society Office And Fitness Centre
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Room Proposed
Energy management
Na
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
Tree Planting Proposed No Landscaping
Open Parking
337.500 Sq. Mt
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
Na
Storm Water Drains
-
Street Lighting
-
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Proposed
Water Supply
Will Be Provided By Concerned Dep
Buildings / Wings in Pink City Trident Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pink City Trident Phase 2 by Ami Infralast updated on 28 Jul 2025 as per information obtained from MARA RERA.

41172 Sq. ft.

Project Area

4117 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

116 apartments in total
Total
116
Booked
72
Available
44

Saleable Area Statistics (Sq. ft.)

45296 Total
Total
45296
Booked
29833
Available
15463
Total 116 apartments in project. 72 apartments booked. 62% apartments booked.
Total 45296 Sq.ft. saleable area. 29833 saleable area booked.
66% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AApr 20208101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.29 Sq.mts. ( 337 Sq.ft. )14
13 Booked92% Booked
92% Booked
1 BHK32.93 Sq.mts. ( 354 Sq.ft. )14
8 Booked57% Booked
57% Booked
28 total apartments / 21 apartments booked. 75% apartments booked.
Work Description in Building Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BApr 202013101004
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK42.95 Sq.mts. ( 462 Sq.ft. )47
34 Booked72% Booked
72% Booked
SHOP15.4 Sq.mts. ( 166 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP16.27 Sq.mts. ( 175 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP20.62 Sq.mts. ( 222 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP21.31 Sq.mts. ( 229 Sq.ft. )2
None Booked0% Booked
0% Booked
55 total apartments / 34 apartments booked. 61% apartments booked.
Work Description in Building Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CApr 20208101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.18 Sq.mts. ( 379 Sq.ft. )14
10 Booked71% Booked
71% Booked
2 BHK41.32 Sq.mts. ( 445 Sq.ft. )14
7 Booked50% Booked
50% Booked
SHOP11.61 Sq.mts. ( 125 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP12.29 Sq.mts. ( 132 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.47 Sq.mts. ( 220 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOPS16.2 Sq.mts. ( 174 Sq.ft. )1
None Booked0% Booked
0% Booked
33 total apartments / 17 apartments booked. 51% apartments booked.
Work Description in Building Wing CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ami Infra
for Project
Pink City Trident Phase 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation