Project overview

Pearl Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900008616. Pearl Residency is located at 181 And 509. This is a Ongoing being developed by Pushpa Construction Co.

Pearl Residency has 1 BHK, 2 BHK, 3 BHK & COMMERCIAL SHOPS Apartments with carpet areas ranging from 1412 to 106543 Sq.ft. Carpet. The Project has total 244 of which 196 are currently available for sale.

Pearl Residency is being developed on a total land area of 123981 Sq.ft. out of which 7194 Sq.ft. i.e 6% is reserved for recreational purposes. Pearl Residency has 2 Wings / Towers Bajrangbali Transit Bldg No 3,Pearl Residency Bldg No 1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Pearl Residency
  • Location:
  • 181 And 509
  • Const. Stage:
    Ongoing
  • Possession:
    30 Oct 2020
Developer Details

  • Developer:
    Pushpa Construction Co
  • Phone:
  • Address:
  • Shanti Sadan Chs Ltd
Project RERA Details
MAHA REARA No: P51900008616
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect M R Shendye And Associates
Funding Bank HDFC BANK
Proposed Possession 30 Oct 2020
Revised Possession 30 Oct 2020
Extended Possession 30 Apr 2023
Litigations No Litigations
Last Modified 29 Sep 2022
Last Retrived 26 Jul 2025
Pearl Residency QR Code
Pearl Residency
MahaRERA - P51900008616
Apartment Details & Configuration
TypeArea
COMMERCIAL SHOPS221.89 Sq.mts. ( 2388 Sq.ft. )
1 BHK1411.2 Sq.mts. ( 15190 Sq.ft. )
2 BHK9898.08 Sq.mts. ( 106543 Sq.ft. )
3 BHK4607.98 Sq.mts. ( 49600 Sq.ft. )
COMMERCIAL SHOPS131.15 Sq.mts. ( 1412 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pearl Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Commenced
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station15% completed
15% Complete
Installation Of Substation To Be Commenced
Energy management
Na
Fire Protection And Fire Safety Requirements
To Be Commenced
Landscaping & Tree Planting
Work Not Commenced
Open Parking
Work Not Commenced
Sewerage (Chamber, Lines, Septic Tank , STP)
Work To Be Commenced
Solid Waste Management And Disposal80% completed
80% Complete
To Be Executed
Storm Water Drains
Work Not Commenced
Street Lighting
Work Not Commenced
Treatment And Disposal Of Sewage And Sullage Water
Work Will Be Complied After Completion Of Rcc
Water Conservation, Rain water Harvesting
To Be Executed
Water Supply
Work To Be Commenced
Buildings / Wings in Pearl Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pearl Residency by Pushpa Construction Colast updated on 26 Jul 2025 as per information obtained from MARA RERA.

123981 Sq. ft.

Project Area

7194 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

244 apartments in total
Total
244
Booked
48
Available
196

Saleable Area Statistics (Sq. ft.)

19073377 Total
Total
19073377
Booked
2992401
Available
16080976
Total 244 apartments in project. 48 apartments booked. 19% apartments booked.
Total 19073377 Sq.ft. saleable area. 2992401 saleable area booked.
16% area booked.

Bajrangbali Transit Bldg No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bajrangbali Transit Bldg No 3Jan 19008100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL SHOPS221.89 Sq.mts. ( 2388 Sq.ft. )9
6 Booked66% Booked
66% Booked
9 total apartments / 6 apartments booked. 66% apartments booked.
Work Description in Building Bajrangbali Transit Bldg No 3Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress55% done
55% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Pearl Residency Bldg No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pearl Residency Bldg No 1Jan 190018140090
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1411.2 Sq.mts. ( 15190 Sq.ft. )31
9 Booked29% Booked
29% Booked
2 BHK9898.08 Sq.mts. ( 106543 Sq.ft. )152
3 BHK4607.98 Sq.mts. ( 49600 Sq.ft. )48
10 Booked20% Booked
20% Booked
COMMERCIAL SHOPS131.15 Sq.mts. ( 1412 Sq.ft. )4
1 Booked25% Booked
25% Booked
235 total apartments / 42 apartments booked. 17% apartments booked.
Work Description in Building Pearl Residency Bldg No 1Completion
Basement (if any)
work-in-progress75% done
75% Booked
Excavation
work-in-progress90% done
90% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress75% done
75% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress75% done
75% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Pushpa Construction Co
for Project
Pearl Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA.