Project overview

Pearl Hans Residency - G Wing is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800022670. Pearl Hans Residency - G Wing is located at Lbs Marg. This is a New Project being developed by Hari Om Construction.

Pearl Hans Residency - G Wing has RESIDENTIAL Apartments with carpet areas ranging from 445 to 672 Sq.ft. Carpet. The Project has total 66 of which 66 are currently available for sale.

Pearl Hans Residency - G Wing is being developed on a total land area of 43999 Sq.ft. Pearl Hans Residency - G Wing has 1 Wings / Towers Pearl Hans Residency - G Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Pearl Hans Residency - G Wing
  • Location:
  • Lbs Marg
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Hari Om Construction
  • Phone:
  • Address:
  • 108, 7Th Floor, Pattathu Business Plaza, Cst Road, Cst Road, Kalina, Santacruz East, 400098
Project RERA Details
MAHA REARA No: P51800022670
Project Type Residential
RERA Project Status New Project
Funding Bank PUNJAB NATIONAL BANK
Proposed Possession 30 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 05 Oct 2019
Last Retrived 28 Jul 2025
Pearl Hans Residency - G Wing QR Code
Pearl Hans Residency - G Wing
MahaRERA - P51800022670
Apartment Details & Configuration
TypeArea
RESIDENTIAL41.31 Sq.mts. ( 445 Sq.ft. )
RESIDENTIAL41.66 Sq.mts. ( 448 Sq.ft. )
RESIDENTIAL51.48 Sq.mts. ( 554 Sq.ft. )
RESIDENTIAL58.02 Sq.mts. ( 625 Sq.ft. )
RESIDENTIAL60.91 Sq.mts. ( 656 Sq.ft. )
RESIDENTIAL62.42 Sq.mts. ( 672 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pearl Hans Residency - G Winglast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work In Progress
Energy management
Work In Progress
Fire Protection And Fire Safety Requirements
Work In Progress
Landscaping & Tree Planting
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work In Progress
Solid Waste Management And Disposal
Work In Progress
Storm Water Drains
Work In Progress
Street Lighting
Work In Progress
Treatment And Disposal Of Sewage And Sullage Water
Work In Progress
Water Conservation, Rain water Harvesting
Work In Progress
Water Supply
Work In Progress
Buildings / Wings in Pearl Hans Residency - G Wing
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pearl Hans Residency - G Wing by Hari Om Constructionlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

43999 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

66 apartments in total
Total
66
Booked
0
Available
66

Saleable Area Statistics (Sq. ft.)

37392 Total
Total
37392
Booked
0
Available
37392
Total 66 apartments in project. 0 apartments booked. 0% apartments booked.
Total 37392 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Pearl Hans Residency - G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pearl Hans Residency - G WingDec 202413101101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL41.31 Sq.mts. ( 445 Sq.ft. )11
None Booked0% Booked
0% Booked
RESIDENTIAL41.66 Sq.mts. ( 448 Sq.ft. )11
None Booked0% Booked
0% Booked
RESIDENTIAL51.48 Sq.mts. ( 554 Sq.ft. )11
None Booked0% Booked
0% Booked
RESIDENTIAL58.02 Sq.mts. ( 625 Sq.ft. )11
None Booked0% Booked
0% Booked
RESIDENTIAL60.91 Sq.mts. ( 656 Sq.ft. )11
None Booked0% Booked
0% Booked
RESIDENTIAL62.42 Sq.mts. ( 672 Sq.ft. )11
None Booked0% Booked
0% Booked
66 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pearl Hans Residency - G WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress35% done
35% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
work-in-progress40% done
40% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Hari Om Construction
for Project
Pearl Hans Residency - G Wing
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation