Project overview

Pearl Gardens is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000047167. Pearl Gardens is located at 66/3. This is a New being developed by Mansarovar Lifespaces Llp.

Pearl Gardens has 1 BHK & 2 BHK Apartments with carpet areas ranging from 404 to 531 Sq.ft. Carpet. The Project has total 670 of which 451 are currently available for sale.

Pearl Gardens is being developed on a total land area of 135519 Sq.ft. out of which 12494 Sq.ft. i.e 9% is reserved for recreational purposes. Pearl Gardens has 5 Wings / Towers Building -1 Commercial,Building No -03 A Wing,Building No -2,Building No 3 Cwing,Building No-3 B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Pearl Gardens
  • Location:
  • 66/3
  • Const. Stage:
    New
  • Possession:
    01 May 2029
Developer Details

  • Developer:
    Mansarovar Lifespaces Llp
  • Phone:
  • Address:
  • Varun Building
Project RERA Details
MAHA REARA No: P99000047167
Project Type Others
RERA Project Status New
Architect En Con
Funding Bank HDFC BANK
Proposed Possession 01 May 2029
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 27 Dec 2023
Last Retrived 28 Jul 2025
Pearl Gardens QR Code
Pearl Gardens
MahaRERA - P99000047167
Apartment Details & Configuration
TypeArea
Office space161.22 Sq.mts. ( 1735 Sq.ft. )
Office space163.07 Sq.mts. ( 1755 Sq.ft. )
Shop38.8 Sq.mts. ( 418 Sq.ft. )
Shop41.75 Sq.mts. ( 449 Sq.ft. )
Shop41.85 Sq.mts. ( 450 Sq.ft. )
1 BHK37.64 Sq.mts. ( 405 Sq.ft. )
1 BHK37.86 Sq.mts. ( 408 Sq.ft. )
1 BHK39.48 Sq.mts. ( 425 Sq.ft. )
2 BHK42.18 Sq.mts. ( 454 Sq.ft. )
2 BHK42.38 Sq.mts. ( 456 Sq.ft. )
2 BHK46.47 Sq.mts. ( 500 Sq.ft. )
2 BHK46.54 Sq.mts. ( 501 Sq.ft. )
2 BHK49.37 Sq.mts. ( 531 Sq.ft. )
2 BHK49.44 Sq.mts. ( 532 Sq.ft. )
2 BHK58.07 Sq.mts. ( 625 Sq.ft. )
2 BHK59.19 Sq.mts. ( 637 Sq.ft. )
2 BHK60.03 Sq.mts. ( 646 Sq.ft. )
2 BHK63 Sq.mts. ( 678 Sq.ft. )
3 BHK75.96 Sq.mts. ( 818 Sq.ft. )
1 BHK39.92 Sq.mts. ( 430 Sq.ft. )
1 BHK46.45 Sq.mts. ( 500 Sq.ft. )
2 BHK56.18 Sq.mts. ( 605 Sq.ft. )
1 BHK37.56 Sq.mts. ( 404 Sq.ft. )
2 BHK42.82 Sq.mts. ( 461 Sq.ft. )
2 BHK49.35 Sq.mts. ( 531 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pearl Gardenslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station11% completed
11% Complete
As Per Vvmc
Energy management
As Per Vvmc
Fire Protection And Fire Safety Requirements4% completed
4% Complete
As Per Vvmc
Landscaping & Tree Planting
As Per Vvmc
Open Parking
As Per Vvmc
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp
Solid Waste Management And Disposal
As Per Vvmc
Storm Water Drains32% completed
32% Complete
As Per Vvmc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
As Per Vvmc
Water Conservation, Rain water Harvesting22% completed
22% Complete
As Per Vvmc
Water Supply36% completed
36% Complete
As Per Vvmc
Buildings / Wings in Pearl Gardens
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pearl Gardens by Mansarovar Lifespaces Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

135519 Sq. ft.

Project Area

12494 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

670 apartments in total
Total
670
Booked
219
Available
451

Saleable Area Statistics (Sq. ft.)

353503 Total
Total
353503
Booked
103396
Available
250107
Total 670 apartments in project. 219 apartments booked. 32% apartments booked.
Total 353503 Sq.ft. saleable area. 103396 saleable area booked.
29% area booked.

Building -1 Commercial

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building -1 CommercialJan 2029410005815
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Office space161.22 Sq.mts. ( 1735 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space163.07 Sq.mts. ( 1755 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop38.8 Sq.mts. ( 418 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop41.75 Sq.mts. ( 449 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop41.85 Sq.mts. ( 450 Sq.ft. )1
None Booked0% Booked
0% Booked
14 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building -1 CommercialCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress30% done
30% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No -03 A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No -03 A WingJan 202922101016970
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.64 Sq.mts. ( 405 Sq.ft. )21
20 Booked95% Booked
95% Booked
1 BHK37.86 Sq.mts. ( 408 Sq.ft. )46
41 Booked89% Booked
89% Booked
1 BHK39.48 Sq.mts. ( 425 Sq.ft. )19
None Booked0% Booked
0% Booked
2 BHK42.18 Sq.mts. ( 454 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK42.38 Sq.mts. ( 456 Sq.ft. )27
27 Booked100% Booked
100% Booked
2 BHK46.47 Sq.mts. ( 500 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK46.54 Sq.mts. ( 501 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK49.37 Sq.mts. ( 531 Sq.ft. )46
46 Booked100% Booked
100% Booked
2 BHK49.44 Sq.mts. ( 532 Sq.ft. )24
24 Booked100% Booked
100% Booked
189 total apartments / 162 apartments booked. 85% apartments booked.
Work Description in Building Building No -03 A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress39% done
39% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress95% done
95% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress30% done
30% Booked

Building No -2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No -2Jan 2029110102301
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.07 Sq.mts. ( 625 Sq.ft. )21
None Booked0% Booked
0% Booked
2 BHK59.19 Sq.mts. ( 637 Sq.ft. )21
None Booked0% Booked
0% Booked
2 BHK60.03 Sq.mts. ( 646 Sq.ft. )37
None Booked0% Booked
0% Booked
2 BHK63 Sq.mts. ( 678 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK75.96 Sq.mts. ( 818 Sq.ft. )40
None Booked0% Booked
0% Booked
121 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No -2Completion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 3 Cwing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3 CwingJan 20291510102221
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.64 Sq.mts. ( 405 Sq.ft. )19
None Booked0% Booked
0% Booked
1 BHK37.86 Sq.mts. ( 408 Sq.ft. )22
None Booked0% Booked
0% Booked
1 BHK39.92 Sq.mts. ( 430 Sq.ft. )44
None Booked0% Booked
0% Booked
1 BHK46.45 Sq.mts. ( 500 Sq.ft. )44
None Booked0% Booked
0% Booked
2 BHK56.18 Sq.mts. ( 605 Sq.ft. )44
None Booked0% Booked
0% Booked
173 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 3 CwingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress95% done
95% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No-3 B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No-3 B WingJan 202922101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.56 Sq.mts. ( 404 Sq.ft. )18
1 BHK37.86 Sq.mts. ( 408 Sq.ft. )22
9 Booked40% Booked
40% Booked
1 BHK42.38 Sq.mts. ( 456 Sq.ft. )21
7 Booked33% Booked
33% Booked
2 BHK42.82 Sq.mts. ( 461 Sq.ft. )43
12 Booked27% Booked
27% Booked
2 BHK49.35 Sq.mts. ( 531 Sq.ft. )47
23 Booked48% Booked
48% Booked
2 BHK42.18 Sq.mts. ( 454 Sq.ft. )22
173 total apartments / 57 apartments booked. 32% apartments booked.
Work Description in Building Building No-3 B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress95% done
95% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress80% done
80% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Mansarovar Lifespaces Llp
for Project
Pearl Gardens
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation