Project overview

Pearl Bay View is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900047085. Pearl Bay View is located at 366. This is a New being developed by Pearl Concept Constructions.

Pearl Bay View has 2 BHK & 3 BHK Apartments with carpet areas ranging from 625 to 1071 Sq.ft. Carpet. The Project has total 18 of which 13 are currently available for sale.

Pearl Bay View is being developed on a total land area of 4675 Sq.ft. Pearl Bay View has 1 Wings / Towers Pearl Bay View-Pushpanjali

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Pearl Bay View
  • Location:
  • 366
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Pearl Concept Constructions
  • Phone:
  • Address:
  • Saidham
Project RERA Details
MAHA REARA No: P51900047085
Project Type Others
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Oct 2022
Last Retrived 26 Jul 2025
Pearl Bay View QR Code
Pearl Bay View
MahaRERA - P51900047085
Apartment Details & Configuration
TypeArea
2 BHK58.02 Sq.mts. ( 625 Sq.ft. )
2 BHK68.03 Sq.mts. ( 732 Sq.ft. )
2 BHK75.41 Sq.mts. ( 812 Sq.ft. )
3 BHK99.48 Sq.mts. ( 1071 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pearl Bay Viewlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Before Possession
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Approvals
Fitness Center
Before Possession
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approvals
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Approvals
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Approvals
Water Supply
Municipal Supply
Buildings / Wings in Pearl Bay View
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pearl Bay View by Pearl Concept Constructionslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4675 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

18 apartments in total
Total
18
Booked
5
Available
13

Saleable Area Statistics (Sq. ft.)

13860 Total
Total
13860
Booked
3943
Available
9917
Total 18 apartments in project. 5 apartments booked. 27% apartments booked.
Total 13860 Sq.ft. saleable area. 3943 saleable area booked.
28% area booked.

Pearl Bay View-Pushpanjali

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pearl Bay View-PushpanjaliDec 2026191000032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.02 Sq.mts. ( 625 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK68.03 Sq.mts. ( 732 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK75.41 Sq.mts. ( 812 Sq.ft. )7
2 Booked28% Booked
28% Booked
3 BHK99.48 Sq.mts. ( 1071 Sq.ft. )1
1 Booked100% Booked
100% Booked
18 total apartments / 5 apartments booked. 27% apartments booked.
Work Description in Building Pearl Bay View-PushpanjaliCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress52% done
52% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress78% done
78% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress24% done
24% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress27% done
27% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress22% done
22% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress26% done
26% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pearl Concept Constructions
for Project
Pearl Bay View
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation