Project overview

Pawan Atharva Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700031072. Pawan Atharva Phase I is located at Survey No 34 Hissa No 1 Plot 1 And 2. This is a New being developed by Pawan Real Estate.

Pawan Atharva Phase I has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 133 to 104 Sq.ft. Carpet. The Project has total 95 of which 68 are currently available for sale.

Pawan Atharva Phase I is being developed on a total land area of 21248 Sq.ft. Pawan Atharva Phase I has 2 Wings / Towers Riddhi,Siddhi

ProjectDeveloperLocationPossession
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Dashmesh ParkSatyam ConstructionsCts No 2340931-03-2023 00:00:00
Shankeshwar DarshanKalpvriksh Homes LlpOld Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt31-12-2024 00:00:00
Eknath Heights - 1Omkar EnterprisesSurvey No 123 Hissa No 331-12-2022 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
SambhaviShree Vakratunda DevelopersSurvey No 531-10-2024 00:00:00
Shree Mangal Narayan ResidencyN V ConstructionCts 9721 To973431-12-2023 00:00:00
Vakratunda HomesNarayan Sunil RanePlot No 4,S .No 108, Hissa No 131-12-2023 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Shiv Aangan ResidencyDhananjay DevelopersSurvey No 40 Hissa No 5/2 And 5/630-03-2025 00:00:00
Nana Patil ResidencyQuality Builders & DevelopersPardi No 3, Hissa No 1, Hissa No 231-01-2021 00:00:00
Satyam OrchidGirija InfrastructurePlot No 1030-12-2021 00:00:00
Kapleshwara ResidencyKapleshwara Homes Llp119/6C (Old), 84/6C (New)31-12-2029 00:00:00
Sara TowerHope Builders And Developers233 And 23431-12-2026 00:00:00
Vedang Lake CityVedang ConstructionS. No. 4 H. No. 2/1 And S. No. 12 H. No 1/331-12-2025 00:00:00
Sai Lake AtulyamMatoshree ConstructionOld 129/1/A Paiki-3 Plot No. 5, New 129/1/Sh/Plot No. 530-12-2025 00:00:00
Iris Mira Road EJeetendra Alias Ravi Amarnath Kapoor21/1, 24/230-12-2022 00:00:00
Sai EnclaveVighnaharta DevelopersSurvey No 57 Hissa No 1 And 2 Part30-12-2023 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Rajoba SolitaireM/S. Gangadhar Associates58B/1A, Sector Ii, Tikka No. 2 Village Thane30-06-2026 00:00:00
Shree Gajanan Enterprises Rukhmini ChsShree Gajanan Enterprises Rukhmini ChsPlot No. 331-07-2026 00:00:00
Dosti West County - Phase 5 - Dosti Olive - Wing ADosti EnterprisesSurvey No 16/10/A/1(Pt), 16/9/A(Pt), 16/8/A(Pt)30-09-2028 00:00:00
Ganesh Villa ChslBhavani EnterprisesSurvey No 7A/4/A/330-06-2026 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Shreyas SapphireVinod Premjibhai TrapasiaPlot No- 1D-2 Sector-3A Karanjade Panvel Navi Mumbai31-03-2025 00:00:00
Upper Thane-Mlcp C ShopsMacrotech Developers Limited60/2 Part,60/1 Part31-12-2024 00:00:00
Innovative Infocom And It ParksInnovative Infocom & It Parks Private LimitedPlot No. Gen 71/1 And Gen 71/1/126-11-2027 00:00:00
Prem Ratna PlazaAditi Home MakerSurvey No 84 Hissa No 331-12-2027 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Arnav Wing DPrashant Raghunath PatilGut No 55 Hissa No 131-12-2027 00:00:00
Smit VistaSmit Megastructures(Old) Survey No. 242/17, 18,, ( New) Survey No. 33/17, 1831-12-2029 00:00:00
Ram Smruti Chs LtdSai Prakash Builders And DevelopersPlot No 139 Cts No 392531-12-2026 00:00:00
Kamdhenu CrownKamdhenu GreenPlot No-6+7, Sector-19, Sanpada31-12-2029 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Project Details
  • Project:
    Pawan Atharva Phase I
  • Location:
  • Survey No 34 Hissa No 1 Plot 1 And 2
  • Const. Stage:
    New
  • Possession:
    31 Aug 2026
Developer Details

  • Developer:
    Pawan Real Estate
  • Phone:
  • Address:
  • Hissa No 01
Project RERA Details
MAHA REARA No: P51700031072
Project Type Others
RERA Project Status New
Architect Ar Anil Nirgude
Funding Bank THE KALYAN JANATA SAHAKARI BANK LTD.
Proposed Possession 31 Aug 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 05 Oct 2021
Last Retrived 26 Jul 2025
Pawan Atharva Phase I QR Code
Pawan Atharva Phase I
MahaRERA - P51700031072
Apartment Details & Configuration
TypeArea
1 BHK35.37 Sq.mts. ( 381 Sq.ft. )
1 BHK37.17 Sq.mts. ( 400 Sq.ft. )
1 BHK39.29 Sq.mts. ( 423 Sq.ft. )
2 BHK51.9 Sq.mts. ( 559 Sq.ft. )
2 BHK52.46 Sq.mts. ( 565 Sq.ft. )
2 BHK52.82 Sq.mts. ( 569 Sq.ft. )
2 BHK53.29 Sq.mts. ( 574 Sq.ft. )
2 BHK53.95 Sq.mts. ( 581 Sq.ft. )
2 BHK58.01 Sq.mts. ( 624 Sq.ft. )
Shop10.7 Sq.mts. ( 115 Sq.ft. )
Shop10.75 Sq.mts. ( 116 Sq.ft. )
Shop10.87 Sq.mts. ( 117 Sq.ft. )
Shop11.78 Sq.mts. ( 127 Sq.ft. )
Shop12.53 Sq.mts. ( 135 Sq.ft. )
Shop12.72 Sq.mts. ( 137 Sq.ft. )
Shop13.48 Sq.mts. ( 145 Sq.ft. )
Shop13.6 Sq.mts. ( 146 Sq.ft. )
Shop16.08 Sq.mts. ( 173 Sq.ft. )
1 BHK35.86 Sq.mts. ( 386 Sq.ft. )
1 BHK35.9 Sq.mts. ( 386 Sq.ft. )
1 BHK37.6 Sq.mts. ( 405 Sq.ft. )
2 BHK43.99 Sq.mts. ( 474 Sq.ft. )
Shop8.4 Sq.mts. ( 90 Sq.ft. )
Shop9.62 Sq.mts. ( 104 Sq.ft. )
Shop12.39 Sq.mts. ( 133 Sq.ft. )
Shop12.87 Sq.mts. ( 139 Sq.ft. )
Shop14.36 Sq.mts. ( 155 Sq.ft. )
Shop20.24 Sq.mts. ( 218 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pawan Atharva Phase Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Yet Started
Energy management
Solar Water Heater
Fire Protection And Fire Safety Requirements
Work Not Yet Started
Landscaping & Tree Planting
Work Not Yet Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
No Stp
Solid Waste Management And Disposal
Work Not Yet Started
Storm Water Drains
Work Not Yet Started
Street Lighting
Work Not Yet Started
Treatment And Disposal Of Sewage And Sullage Water
Work Not Yet Started
Water Conservation, Rain water Harvesting
Work Not Yet Started
Water Supply
Prior To Oc
Buildings / Wings in Pawan Atharva Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pawan Atharva Phase I by Pawan Real Estatelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

21248 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

95 apartments in total
Total
95
Booked
27
Available
68

Saleable Area Statistics (Sq. ft.)

37518 Total
Total
37518
Booked
8381
Available
29137
Total 95 apartments in project. 27 apartments booked. 28% apartments booked.
Total 37518 Sq.ft. saleable area. 8381 saleable area booked.
22% area booked.

Riddhi

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
RiddhiAug 202613100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.37 Sq.mts. ( 381 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK37.17 Sq.mts. ( 400 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK39.29 Sq.mts. ( 423 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK51.9 Sq.mts. ( 559 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK52.46 Sq.mts. ( 565 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK52.82 Sq.mts. ( 569 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK53.29 Sq.mts. ( 574 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK53.95 Sq.mts. ( 581 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK58.01 Sq.mts. ( 624 Sq.ft. )8
None Booked0% Booked
0% Booked
Shop10.7 Sq.mts. ( 115 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.75 Sq.mts. ( 116 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.87 Sq.mts. ( 117 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.78 Sq.mts. ( 127 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.53 Sq.mts. ( 135 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.72 Sq.mts. ( 137 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.48 Sq.mts. ( 145 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.6 Sq.mts. ( 146 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.08 Sq.mts. ( 173 Sq.ft. )3
None Booked0% Booked
0% Booked
55 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building RiddhiCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Siddhi

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
SiddhiAug 20268100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.86 Sq.mts. ( 386 Sq.ft. )7
4 Booked57% Booked
57% Booked
1 BHK35.9 Sq.mts. ( 386 Sq.ft. )7
4 Booked57% Booked
57% Booked
1 BHK37.6 Sq.mts. ( 405 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK43.99 Sq.mts. ( 474 Sq.ft. )7
5 Booked71% Booked
71% Booked
Shop8.4 Sq.mts. ( 90 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop9.62 Sq.mts. ( 104 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop12.39 Sq.mts. ( 133 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop12.87 Sq.mts. ( 139 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop14.36 Sq.mts. ( 155 Sq.ft. )3
3 Booked100% Booked
100% Booked
Shop20.24 Sq.mts. ( 218 Sq.ft. )1
None Booked0% Booked
0% Booked
40 total apartments / 27 apartments booked. 67% apartments booked.
Work Description in Building SiddhiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pawan Real Estate
for Project
Pawan Atharva Phase I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation