Project overview

Pathak Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700012027. Pathak Residency is located at S No 82 1 A 1B. This is a Ongoing being developed by Shree Mahalaxmi Constructions.

Pathak Residency has 1 BHK Apartments with carpet areas ranging from 310 to 471 Sq.ft. Carpet. The Project has total 48 of which 0 are currently available for sale.

Pathak Residency is being developed on a total land area of 20624 Sq.ft. out of which 2067 Sq.ft. i.e 10% is reserved for recreational purposes. Pathak Residency has 2 Wings / Towers Priyam B Wing,Priyam C Wing

ProjectDeveloperLocationPossession
Jeevan LifestylesJeevan EnterprisesS N 148 / 13/1531-03-2019 00:00:00
Marathon Nagari Nx Vigo DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.30-06-2019 00:00:00
Marathon Nagari Nx Vitoria DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.31-12-2019 00:00:00
Project Details
  • Project:
    Pathak Residency
  • Location:
  • S No 82 1 A 1B
  • Const. Stage:
    Ongoing
  • Possession:
    31 Mar 2019
Developer Details

  • Developer:
    Shree Mahalaxmi Constructions
  • Phone:
  • Address:
  • Building No.2 A Wing
Project RERA Details
MAHA REARA No: P51700012027
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Urban Vastu Designer
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 31 Mar 2019
Revised Possession 31 Mar 2019
Extended Possession
Litigations No Litigations
Last Modified 01 Sep 2017
Last Retrived 26 Jul 2025
Pathak Residency QR Code
Pathak Residency
MahaRERA - P51700012027
Apartment Details & Configuration
TypeArea
1 BHK20.8 Sq.mts. ( 224 Sq.ft. )
1 BHK29.04 Sq.mts. ( 313 Sq.ft. )
1 BHK30.49 Sq.mts. ( 328 Sq.ft. )
1 BHK30.6 Sq.mts. ( 329 Sq.ft. )
1 BHK45.48 Sq.mts. ( 490 Sq.ft. )
1 BHK46.56 Sq.mts. ( 501 Sq.ft. )
1 BHK28.83 Sq.mts. ( 310 Sq.ft. )
1 BHK29.08 Sq.mts. ( 313 Sq.ft. )
1 BHK29.22 Sq.mts. ( 315 Sq.ft. )
1 BHK29.49 Sq.mts. ( 317 Sq.ft. )
1 BHK43.77 Sq.mts. ( 471 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pathak Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking100% completed
95% Complete
Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Pathak Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pathak Residency by Shree Mahalaxmi Constructionslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

20624 Sq. ft.

Project Area

2067 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

48 apartments in total
Total
48
Booked
48
Available
0

Saleable Area Statistics (Sq. ft.)

16755 Total
Total
16755
Booked
16755
Available
0
Total 48 apartments in project. 48 apartments booked. 100% apartments booked.
Total 16755 Sq.ft. saleable area. 16755 saleable area booked.
100% area booked.

Priyam B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Priyam B WingMar 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK20.8 Sq.mts. ( 224 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK29.04 Sq.mts. ( 313 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK30.49 Sq.mts. ( 328 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK30.6 Sq.mts. ( 329 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK45.48 Sq.mts. ( 490 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK46.56 Sq.mts. ( 501 Sq.ft. )4
4 Booked100% Booked
100% Booked
19 total apartments / 19 apartments booked. 100% apartments booked.
Work Description in Building Priyam B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Priyam C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Priyam C WingMar 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.83 Sq.mts. ( 310 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK29.08 Sq.mts. ( 313 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK29.22 Sq.mts. ( 315 Sq.ft. )9
9 Booked100% Booked
100% Booked
1 BHK29.49 Sq.mts. ( 317 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK43.77 Sq.mts. ( 471 Sq.ft. )5
5 Booked100% Booked
100% Booked
29 total apartments / 29 apartments booked. 100% apartments booked.
Work Description in Building Priyam C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Mahalaxmi Constructions
for Project
Pathak Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation