Project overview

Patels Venus is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700031663. Patels Venus is located at Plot No.1, S.No. 2/1A. This is a New being developed by Bechar Raghavji Patel.

Patels Venus has 1 BHK Apartments with carpet areas ranging from 323 to 323 Sq.ft. Carpet. The Project has total 297 of which 161 are currently available for sale.

Patels Venus is being developed on a total land area of 60744 Sq.ft. out of which 4415 Sq.ft. i.e 7% is reserved for recreational purposes. Patels Venus has 4 Wings / Towers Wing A,Wing B,Wing C,Wing D

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Patels Venus
  • Location:
  • Plot No.1, S.No. 2/1A
  • Const. Stage:
    New
  • Possession:
    30 Jun 2028
Developer Details

  • Developer:
    Bechar Raghavji Patel
  • Phone:
  • Address:
  • Survey No 2/1A, 5/2
Project RERA Details
MAHA REARA No: P51700031663
Project Type Residential / Group Housing
RERA Project Status New
Architect Pramod Kamble
Funding Bank IDBI BANK
Proposed Possession 30 Jun 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Nov 2021
Last Retrived 26 Jul 2025
Patels Venus QR Code
Patels Venus
MahaRERA - P51700031663
Apartment Details & Configuration
TypeArea
1 BHK35.4 Sq.mts. ( 381 Sq.ft. )
1 BHK36.01 Sq.mts. ( 388 Sq.ft. )
1 BHK37.37 Sq.mts. ( 402 Sq.ft. )
1RK22.55 Sq.mts. ( 243 Sq.ft. )
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )
2 BHK54.82 Sq.mts. ( 590 Sq.ft. )
1 BHK35.09 Sq.mts. ( 378 Sq.ft. )
1 BHK35.41 Sq.mts. ( 381 Sq.ft. )
1 BHK36.06 Sq.mts. ( 388 Sq.ft. )
2 BHK48.43 Sq.mts. ( 521 Sq.ft. )
2 BHK49.24 Sq.mts. ( 530 Sq.ft. )
1 BHK30 Sq.mts. ( 323 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Patels Venuslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Transformer Proposed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room
Energy management
Solar Light Proposed
Fire Protection And Fire Safety Requirements
At The Time Of Completion
Landscaping & Tree Planting
-
Open Parking
-
Sewerage (Chamber, Lines, Septic Tank , STP)
Water Connection Will Be Provided By Concerned Dep
Solid Waste Management And Disposal
Na
Storm Water Drains
Chamber Line Proposed
Street Lighting
Tree Planting Proposed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Proposed
Water Supply
-
Buildings / Wings in Patels Venus
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Patels Venus by Bechar Raghavji Patellast updated on 26 Jul 2025 as per information obtained from MARA RERA.

60744 Sq. ft.

Project Area

4415 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

297 apartments in total
Total
297
Booked
136
Available
161

Saleable Area Statistics (Sq. ft.)

113050 Total
Total
113050
Booked
59826
Available
53224
Total 297 apartments in project. 136 apartments booked. 45% apartments booked.
Total 113050 Sq.ft. saleable area. 59826 saleable area booked.
53% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 202810101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.4 Sq.mts. ( 381 Sq.ft. )27
23 Booked85% Booked
85% Booked
1 BHK36.01 Sq.mts. ( 388 Sq.ft. )17
13 Booked76% Booked
76% Booked
1 BHK37.37 Sq.mts. ( 402 Sq.ft. )9
9 Booked100% Booked
100% Booked
1RK22.55 Sq.mts. ( 243 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )9
8 Booked88% Booked
88% Booked
2 BHK54.82 Sq.mts. ( 590 Sq.ft. )18
18 Booked100% Booked
100% Booked
81 total apartments / 72 apartments booked. 88% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 202810101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.09 Sq.mts. ( 378 Sq.ft. )9
8 Booked88% Booked
88% Booked
1 BHK35.41 Sq.mts. ( 381 Sq.ft. )27
24 Booked88% Booked
88% Booked
1 BHK36.01 Sq.mts. ( 388 Sq.ft. )18
15 Booked83% Booked
83% Booked
1 BHK36.06 Sq.mts. ( 388 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK48.43 Sq.mts. ( 521 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK49.24 Sq.mts. ( 530 Sq.ft. )9
9 Booked100% Booked
100% Booked
72 total apartments / 64 apartments booked. 88% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 202810101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30 Sq.mts. ( 323 Sq.ft. )72
None Booked0% Booked
0% Booked
72 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DJun 202810101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30 Sq.mts. ( 323 Sq.ft. )72
None Booked0% Booked
0% Booked
72 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Bechar Raghavji Patel
for Project
Patels Venus
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation