Project overview
Patels Venus is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700031663. Patels Venus is located at Plot No.1, S.No. 2/1A. This is a New being developed by Bechar Raghavji Patel.
Patels Venus has 1 BHK Apartments with carpet areas ranging from 323 to 323 Sq.ft. Carpet. The Project has total 297 of which 161 are currently available for sale.
Patels Venus is being developed on a total land area of 60744 Sq.ft. out of which 4415 Sq.ft. i.e 7% is reserved for recreational purposes. Patels Venus has 4 Wings / Towers Wing A,Wing B,Wing C,Wing D
| Project | Developer | Location | Possession |
-
Project:
Patels Venus
-
Location:
-
Plot No.1, S.No. 2/1A
-
Const. Stage:
New
-
Possession:
30 Jun 2028
-
Developer:
Bechar Raghavji Patel
-
Phone:
-
Address:
-
Survey No 2/1A, 5/2
| MAHA REARA No: |
P51700031663 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
Pramod Kamble |
| Funding Bank |
IDBI BANK |
| Proposed Possession |
30 Jun 2028 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
03 Nov 2021 |
| Last Retrived |
26 Jul 2025 |
Patels Venus QR Code
Patels Venus
MahaRERA - P51700031663
| Type | Area |
| 1 BHK | 35.4 Sq.mts. ( 381 Sq.ft. ) |
| 1 BHK | 36.01 Sq.mts. ( 388 Sq.ft. ) |
| 1 BHK | 37.37 Sq.mts. ( 402 Sq.ft. ) |
| 1RK | 22.55 Sq.mts. ( 243 Sq.ft. ) |
| 2 BHK | 53.59 Sq.mts. ( 577 Sq.ft. ) |
| 2 BHK | 54.82 Sq.mts. ( 590 Sq.ft. ) |
| 1 BHK | 35.09 Sq.mts. ( 378 Sq.ft. ) |
| 1 BHK | 35.41 Sq.mts. ( 381 Sq.ft. ) |
| 1 BHK | 36.06 Sq.mts. ( 388 Sq.ft. ) |
| 2 BHK | 48.43 Sq.mts. ( 521 Sq.ft. ) |
| 2 BHK | 49.24 Sq.mts. ( 530 Sq.ft. ) |
| 1 BHK | 30 Sq.mts. ( 323 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Patels Venuslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Transformer Proposed |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Electrical Meter Room |
|
|
|
Solar Light Proposed |
Fire Protection And Fire Safety
Requirements
|
|
At The Time Of Completion |
Landscaping & Tree Planting
|
|
- |
|
|
|
- |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Water Connection Will Be Provided By Concerned Dep |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Chamber Line Proposed |
|
|
|
Tree Planting Proposed |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Rain Water Harvesting Proposed |
|
|
|
- |
Buildings / Wings in Patels Venus
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Patels Venus by Bechar Raghavji Patellast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
297
apartments in total
Saleable Area Statistics (Sq. ft.)
113050
Total
Total 297 apartments in project. 136 apartments booked. 45% apartments booked.
Total 113050 Sq.ft. saleable area. 59826 saleable area booked.
53% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing A | Jun 2028 | 10 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 35.4 Sq.mts. ( 381 Sq.ft. ) | 27 | |
| 1 BHK | 36.01 Sq.mts. ( 388 Sq.ft. ) | 17 | |
| 1 BHK | 37.37 Sq.mts. ( 402 Sq.ft. ) | 9 | |
| 1RK | 22.55 Sq.mts. ( 243 Sq.ft. ) | 1 | |
| 2 BHK | 53.59 Sq.mts. ( 577 Sq.ft. ) | 9 | |
| 2 BHK | 54.82 Sq.mts. ( 590 Sq.ft. ) | 18 | |
81 total apartments / 72 apartments booked. 88% apartments booked. |
| Work Description in Building Wing A | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing B | Jun 2028 | 10 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 35.09 Sq.mts. ( 378 Sq.ft. ) | 9 | |
| 1 BHK | 35.41 Sq.mts. ( 381 Sq.ft. ) | 27 | |
| 1 BHK | 36.01 Sq.mts. ( 388 Sq.ft. ) | 18 | |
| 1 BHK | 36.06 Sq.mts. ( 388 Sq.ft. ) | 1 | |
| 2 BHK | 48.43 Sq.mts. ( 521 Sq.ft. ) | 8 | |
| 2 BHK | 49.24 Sq.mts. ( 530 Sq.ft. ) | 9 | |
72 total apartments / 64 apartments booked. 88% apartments booked. |
| Work Description in Building Wing B | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing C | Jun 2028 | 10 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 30 Sq.mts. ( 323 Sq.ft. ) | 72 | |
72 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Wing C | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing D | Jun 2028 | 10 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 30 Sq.mts. ( 323 Sq.ft. ) | 72 | |
72 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Wing D | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Bechar Raghavji Patel
for Project
Patels Venus
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |