Project overview

Patels Glory is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700030230. Patels Glory is located at 58/4/3. This is a New being developed by Serene Infratech Co.

Patels Glory has 1 BHK & 2 BHK Apartments with carpet areas ranging from 375 to 480 Sq.ft. Carpet. The Project has total 256 of which 66 are currently available for sale.

Patels Glory is being developed on a total land area of 50591 Sq.ft. out of which 5059 Sq.ft. i.e 10% is reserved for recreational purposes. Patels Glory has 8 Wings / Towers Type A,Type B,Type C,Type D,Type E,Type F,Type G,Type H

ProjectDeveloperLocationPossession
Patels Elysium - 6Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C30-12-2023 00:00:00
Patels Elysium - 1Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No - 6B, Plot-C31-10-2019 00:00:00
Vishnu HeightsJaideep ConstructionS No 119 Cts No 926930-09-2018 00:00:00
Shree Siddhivinayak ResidencySunil Bhagchand TalrejaSurvey No 49 Hissa No 5 A And D31-05-2018 00:00:00
Jp Regency Phase 1Jp DevelopersS No 54 H No 4A, S No 57 H No 1Pt S No 57 H No 2Pt, S No 54 H No 3B30-06-2021 00:00:00
Landscape GardenLandscape VenturesSurvey No 65 Hissa No 1P Survey No 65 Hissa No 2 Plot B30-11-2018 00:00:00
Patels Elysium - 7Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C30-12-2023 00:00:00
Patels GlorySerene Infratech Co58/4/330-06-2026 00:00:00
Raj UrbaniaRaj Buildcon & InfrastructurePlot No 3 And 4 S No 39 2B And 40 3A31-03-2025 00:00:00
S. A. Patil Nagar Garden View ChsShree Khodiyar Builders And DevelopersSurvey No 114 Plot No H No 130-09-2023 00:00:00
Jp SynergyAashvi DevelopersSurvey No 131 Hissa No 1B Cts No - 946630-12-2021 00:00:00
Jp GalaxyJp Corp Llp Sr No 68 Hissa 1/1 Hissa 1/230-12-2025 00:00:00
Landscape Heritage Building No 1Landscape InfrastructureB C/1 S No 49/2P31-03-2020 00:00:00
Meera AvalonSaraswati CorpSurvey No. 124/5A30-04-2021 00:00:00
Patels SignatureSerene Infratech CoSurvey No -49/2C , 57/2 And 58/4/1 30-03-2022 00:00:00
Jp SymphonyRisali DevelopersS.No. 13801-03-2022 00:00:00
Sadguru Kripa ApartmentSadguru DeveloperS No. 132, H No. 2-12B, 1-11A131-12-2018 00:00:00
Patels Elysium - 3Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C30-10-2023 00:00:00
Patels Elysium - 5Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C30-12-2022 00:00:00
Aashray Pearl Wing DAashraygroupSurvey No 55 Hissa No 1 And Survey No 54 Hissa No 3 E, Plot No 130-12-2021 00:00:00
Trinity - RudraRattanraj LifespacesPlot No 1 Survey No 64 H No 1P31-03-2020 00:00:00
Aadi Aarambh IiNirman Construction129-1A And 129-1B30-06-2022 00:00:00
Jp Synergy Phase 1 Building No-2Aashvi DevelopersSurvey No -131 Hissa No-1Bcts No-946631-12-2019 00:00:00
Om Sai RegencyD A ConstructionSurvey No 49, Hissa No.1, Survey No.5428-02-2019 00:00:00
Project Details
  • Project:
    Patels Glory
  • Location:
  • 58/4/3
  • Const. Stage:
    New
  • Possession:
    30 Jun 2026
Developer Details

  • Developer:
    Serene Infratech Co
  • Phone:
  • Address:
  • Jeevandeep Apartment
Project RERA Details
MAHA REARA No: P51700030230
Project Type Residential / Group Housing
RERA Project Status New
Architect Thorat & Mathews
Funding Bank KALLAPPANNA AWADE ICHALKARANJI JANATA SAHAKARI BANK LIMITED
Proposed Possession 30 Jun 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 26 Mar 2024
Last Retrived 26 Jul 2025
Patels Glory QR Code
Patels Glory
MahaRERA - P51700030230
Apartment Details & Configuration
TypeArea
1 BHK34.84 Sq.mts. ( 375 Sq.ft. )
2 BHK44.59 Sq.mts. ( 480 Sq.ft. )
1 BHK34.28 Sq.mts. ( 369 Sq.ft. )
2 BHK44.69 Sq.mts. ( 481 Sq.ft. )
2 BHK45.24 Sq.mts. ( 487 Sq.ft. )
1 BHK34.1 Sq.mts. ( 367 Sq.ft. )
2 BHK42.27 Sq.mts. ( 455 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Patels Glorylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Provided As Per Approval
Community Buildings
Club House Proposed
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room Sub Station Proposed
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Tree Plantation Proposed
Open Parking
-
Sewerage (Chamber, Lines, Septic Tank , STP)
Chamber Line Proposed
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Proposed
Water Supply
Water Connection Will Be Provided By Concerned Dep
Buildings / Wings in Patels Glory
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Patels Glory by Serene Infratech Colast updated on 26 Jul 2025 as per information obtained from MARA RERA.

50591 Sq. ft.

Project Area

5059 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

256 apartments in total
Total
256
Booked
190
Available
66

Saleable Area Statistics (Sq. ft.)

104816 Total
Total
104816
Booked
77068
Available
27748
Total 256 apartments in project. 190 apartments booked. 74% apartments booked.
Total 104816 Sq.ft. saleable area. 77068 saleable area booked.
74% area booked.

Type A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type AJun 20269110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.84 Sq.mts. ( 375 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK44.59 Sq.mts. ( 480 Sq.ft. )16
16 Booked100% Booked
100% Booked
32 total apartments / 32 apartments booked. 100% apartments booked.
Work Description in Building Type ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Type B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type BJun 20269110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.28 Sq.mts. ( 369 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK34.84 Sq.mts. ( 375 Sq.ft. )16
16 Booked100% Booked
100% Booked
32 total apartments / 32 apartments booked. 100% apartments booked.
Work Description in Building Type BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Type C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type CJun 20269110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.84 Sq.mts. ( 375 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK44.59 Sq.mts. ( 480 Sq.ft. )16
16 Booked100% Booked
100% Booked
32 total apartments / 32 apartments booked. 100% apartments booked.
Work Description in Building Type CCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Type D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type DJun 20269110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.69 Sq.mts. ( 481 Sq.ft. )16
2 BHK45.24 Sq.mts. ( 487 Sq.ft. )16
32 total apartments / 3 apartments booked. 9% apartments booked.
Work Description in Building Type DCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Type E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type EJun 20269110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.1 Sq.mts. ( 367 Sq.ft. )8
3 Booked37% Booked
37% Booked
1 BHK34.84 Sq.mts. ( 375 Sq.ft. )16
15 Booked93% Booked
93% Booked
2 BHK44.59 Sq.mts. ( 480 Sq.ft. )8
8 Booked100% Booked
100% Booked
32 total apartments / 26 apartments booked. 81% apartments booked.
Work Description in Building Type ECompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Type F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type FJun 20269110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.28 Sq.mts. ( 369 Sq.ft. )16
4 Booked25% Booked
25% Booked
1 BHK34.84 Sq.mts. ( 375 Sq.ft. )16
12 Booked75% Booked
75% Booked
32 total apartments / 16 apartments booked. 50% apartments booked.
Work Description in Building Type FCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Type G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type GJun 20269110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.28 Sq.mts. ( 369 Sq.ft. )16
8 Booked50% Booked
50% Booked
1 BHK34.84 Sq.mts. ( 375 Sq.ft. )16
12 Booked75% Booked
75% Booked
32 total apartments / 20 apartments booked. 62% apartments booked.
Work Description in Building Type GCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Type H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type HJun 20269110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.84 Sq.mts. ( 375 Sq.ft. )16
13 Booked81% Booked
81% Booked
2 BHK42.27 Sq.mts. ( 455 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK44.59 Sq.mts. ( 480 Sq.ft. )8
8 Booked100% Booked
100% Booked
32 total apartments / 29 apartments booked. 90% apartments booked.
Work Description in Building Type HCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Serene Infratech Co
for Project
Patels Glory
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation