Project overview
Patels Glory is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700030230. Patels Glory is located at 58/4/3. This is a New being developed by Serene Infratech Co.
Patels Glory has 1 BHK & 2 BHK Apartments with carpet areas ranging from 375 to 480 Sq.ft. Carpet. The Project has total 256 of which 66 are currently available for sale.
Patels Glory is being developed on a total land area of 50591 Sq.ft. out of which 5059 Sq.ft. i.e 10% is reserved for recreational purposes. Patels Glory has 8 Wings / Towers Type A,Type B,Type C,Type D,Type E,Type F,Type G,Type H
| Project | Developer | Location | Possession |
| Patels Elysium - 6 | Apace Realty | Survey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C | 30-12-2023 00:00:00 |
| Patels Elysium - 1 | Apace Realty | Survey No 58 Hissa No 4/2, Survey No 58 Hissa No - 6B, Plot-C | 31-10-2019 00:00:00 |
| Vishnu Heights | Jaideep Construction | S No 119 Cts No 9269 | 30-09-2018 00:00:00 |
| Shree Siddhivinayak Residency | Sunil Bhagchand Talreja | Survey No 49 Hissa No 5 A And D | 31-05-2018 00:00:00 |
| Jp Regency Phase 1 | Jp Developers | S No 54 H No 4A, S No 57 H No 1Pt S No 57 H No 2Pt, S No 54 H No 3B | 30-06-2021 00:00:00 |
| Landscape Garden | Landscape Ventures | Survey No 65 Hissa No 1P Survey No 65 Hissa No 2 Plot B | 30-11-2018 00:00:00 |
| Patels Elysium - 7 | Apace Realty | Survey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C | 30-12-2023 00:00:00 |
| Patels Glory | Serene Infratech Co | 58/4/3 | 30-06-2026 00:00:00 |
| Raj Urbania | Raj Buildcon & Infrastructure | Plot No 3 And 4 S No 39 2B And 40 3A | 31-03-2025 00:00:00 |
| S. A. Patil Nagar Garden View Chs | Shree Khodiyar Builders And Developers | Survey No 114 Plot No H No 1 | 30-09-2023 00:00:00 |
| Jp Synergy | Aashvi Developers | Survey No 131 Hissa No 1B Cts No - 9466 | 30-12-2021 00:00:00 |
| Jp Galaxy | Jp Corp Llp | Sr No 68 Hissa 1/1 Hissa 1/2 | 30-12-2025 00:00:00 |
| Landscape Heritage Building No 1 | Landscape Infrastructure | B C/1 S No 49/2P | 31-03-2020 00:00:00 |
| Meera Avalon | Saraswati Corp | Survey No. 124/5A | 30-04-2021 00:00:00 |
| Patels Signature | Serene Infratech Co | Survey No -49/2C , 57/2 And 58/4/1 | 30-03-2022 00:00:00 |
| Jp Symphony | Risali Developers | S.No. 138 | 01-03-2022 00:00:00 |
| Sadguru Kripa Apartment | Sadguru Developer | S No. 132, H No. 2-12B, 1-11A1 | 31-12-2018 00:00:00 |
| Patels Elysium - 3 | Apace Realty | Survey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C | 30-10-2023 00:00:00 |
| Patels Elysium - 5 | Apace Realty | Survey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C | 30-12-2022 00:00:00 |
| Aashray Pearl Wing D | Aashraygroup | Survey No 55 Hissa No 1 And Survey No 54 Hissa No 3 E, Plot No 1 | 30-12-2021 00:00:00 |
| Trinity - Rudra | Rattanraj Lifespaces | Plot No 1 Survey No 64 H No 1P | 31-03-2020 00:00:00 |
| Aadi Aarambh Ii | Nirman Construction | 129-1A And 129-1B | 30-06-2022 00:00:00 |
| Jp Synergy Phase 1 Building No-2 | Aashvi Developers | Survey No -131 Hissa No-1Bcts No-9466 | 31-12-2019 00:00:00 |
| Om Sai Regency | D A Construction | Survey No 49, Hissa No.1, Survey No.54 | 28-02-2019 00:00:00 |
-
Project:
Patels Glory
-
Location:
-
58/4/3
-
Const. Stage:
New
-
Possession:
30 Jun 2026
-
Developer:
Serene Infratech Co
-
Phone:
-
Address:
-
Jeevandeep Apartment
| MAHA REARA No: |
P51700030230 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
Thorat & Mathews |
| Funding Bank |
KALLAPPANNA AWADE ICHALKARANJI JANATA SAHAKARI BANK LIMITED |
| Proposed Possession |
30 Jun 2026 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
26 Mar 2024 |
| Last Retrived |
26 Jul 2025 |
Patels Glory QR Code
Patels Glory
MahaRERA - P51700030230
| Type | Area |
| 1 BHK | 34.84 Sq.mts. ( 375 Sq.ft. ) |
| 2 BHK | 44.59 Sq.mts. ( 480 Sq.ft. ) |
| 1 BHK | 34.28 Sq.mts. ( 369 Sq.ft. ) |
| 2 BHK | 44.69 Sq.mts. ( 481 Sq.ft. ) |
| 2 BHK | 45.24 Sq.mts. ( 487 Sq.ft. ) |
| 1 BHK | 34.1 Sq.mts. ( 367 Sq.ft. ) |
| 2 BHK | 42.27 Sq.mts. ( 455 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Patels Glorylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Will Be Provided As Per Approval |
|
|
|
Club House Proposed |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Electrical Meter Room Sub Station Proposed |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Tree Plantation Proposed |
|
|
|
- |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Chamber Line Proposed |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Na |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Rain Water Harvesting Proposed |
|
|
|
Water Connection Will Be Provided By Concerned Dep |
Buildings / Wings in Patels Glory
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Patels Glory by Serene Infratech Colast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
256
apartments in total
Saleable Area Statistics (Sq. ft.)
104816
Total
Total 256 apartments in project. 190 apartments booked. 74% apartments booked.
Total 104816 Sq.ft. saleable area. 77068 saleable area booked.
74% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Type A | Jun 2026 | 9 | 1 | 1 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.84 Sq.mts. ( 375 Sq.ft. ) | 16 | |
| 2 BHK | 44.59 Sq.mts. ( 480 Sq.ft. ) | 16 | |
32 total apartments / 32 apartments booked. 100% apartments booked. |
| Work Description in Building Type A | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Type B | Jun 2026 | 9 | 1 | 1 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.28 Sq.mts. ( 369 Sq.ft. ) | 16 | |
| 1 BHK | 34.84 Sq.mts. ( 375 Sq.ft. ) | 16 | |
32 total apartments / 32 apartments booked. 100% apartments booked. |
| Work Description in Building Type B | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Type C | Jun 2026 | 9 | 1 | 1 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.84 Sq.mts. ( 375 Sq.ft. ) | 16 | |
| 2 BHK | 44.59 Sq.mts. ( 480 Sq.ft. ) | 16 | |
32 total apartments / 32 apartments booked. 100% apartments booked. |
| Work Description in Building Type C | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Type D | Jun 2026 | 9 | 1 | 1 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 44.69 Sq.mts. ( 481 Sq.ft. ) | 16 | |
| 2 BHK | 45.24 Sq.mts. ( 487 Sq.ft. ) | 16 | |
32 total apartments / 3 apartments booked. 9% apartments booked. |
| Work Description in Building Type D | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Type E | Jun 2026 | 9 | 1 | 1 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.1 Sq.mts. ( 367 Sq.ft. ) | 8 | |
| 1 BHK | 34.84 Sq.mts. ( 375 Sq.ft. ) | 16 | |
| 2 BHK | 44.59 Sq.mts. ( 480 Sq.ft. ) | 8 | |
32 total apartments / 26 apartments booked. 81% apartments booked. |
| Work Description in Building Type E | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Type F | Jun 2026 | 9 | 1 | 1 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.28 Sq.mts. ( 369 Sq.ft. ) | 16 | |
| 1 BHK | 34.84 Sq.mts. ( 375 Sq.ft. ) | 16 | |
32 total apartments / 16 apartments booked. 50% apartments booked. |
| Work Description in Building Type F | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Type G | Jun 2026 | 9 | 1 | 1 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.28 Sq.mts. ( 369 Sq.ft. ) | 16 | |
| 1 BHK | 34.84 Sq.mts. ( 375 Sq.ft. ) | 16 | |
32 total apartments / 20 apartments booked. 62% apartments booked. |
| Work Description in Building Type G | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Type H | Jun 2026 | 9 | 1 | 1 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.84 Sq.mts. ( 375 Sq.ft. ) | 16 | |
| 2 BHK | 42.27 Sq.mts. ( 455 Sq.ft. ) | 8 | |
| 2 BHK | 44.59 Sq.mts. ( 480 Sq.ft. ) | 8 | |
32 total apartments / 29 apartments booked. 90% apartments booked. |
| Work Description in Building Type H | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Serene Infratech Co
for Project
Patels Glory
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |