Project overview

Patels Elysium - 3 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700010280. Patels Elysium - 3 is located at Survey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C. This is a Ongoing being developed by Apace Realty.

Patels Elysium - 3 has 1 BHK WING B Apartments with carpet areas ranging from 324 to 328 Sq.ft. Carpet. The Project has total 65 of which 0 are currently available for sale.

Patels Elysium - 3 is being developed on a total land area of 3007 Sq.ft. Patels Elysium - 3 has 1 Wings / Towers Patels Elysium - 3 - B Wing - G To 11Th Floors

ProjectDeveloperLocationPossession
Patels Elysium - 6Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C30-12-2023 00:00:00
Patels Elysium - 1Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No - 6B, Plot-C31-10-2019 00:00:00
Vishnu HeightsJaideep ConstructionS No 119 Cts No 926930-09-2018 00:00:00
Shree Siddhivinayak ResidencySunil Bhagchand TalrejaSurvey No 49 Hissa No 5 A And D31-05-2018 00:00:00
Jp Regency Phase 1Jp DevelopersS No 54 H No 4A, S No 57 H No 1Pt S No 57 H No 2Pt, S No 54 H No 3B30-06-2021 00:00:00
Landscape GardenLandscape VenturesSurvey No 65 Hissa No 1P Survey No 65 Hissa No 2 Plot B30-11-2018 00:00:00
Patels Elysium - 7Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C30-12-2023 00:00:00
Jp GalaxyJp Corp Llp Sr No 68 Hissa 1/1 Hissa 1/230-12-2025 00:00:00
Landscape Heritage Building No 1Landscape InfrastructureB C/1 S No 49/2P31-03-2020 00:00:00
Aashray Pearl Wing DAashraygroupSurvey No 55 Hissa No 1 And Survey No 54 Hissa No 3 E, Plot No 130-12-2021 00:00:00
Gajanan SmrutiJaideep ConstructionSurvey No 43/5/325-12-2019 00:00:00
Vasant ViharJaideep ConstructionS No 43 H No 4/10 C T S No 6653/2825-12-2019 00:00:00
Patels Signature Type BSerene Infratech CoSurvey No - 49 Hissa No - 2C, Survey No 57 Hissa No 2, Survey No 58 Hissa No 4130-03-2023 00:00:00
Meera AvalonSaraswati CorpSurvey No. 124/5A30-04-2021 00:00:00
Patels SignatureSerene Infratech CoSurvey No -49/2C , 57/2 And 58/4/1 30-03-2022 00:00:00
Om Sai RegencyD A ConstructionSurvey No 49, Hissa No.1, Survey No.5428-02-2019 00:00:00
Sadguru Kripa ApartmentSadguru DeveloperS No. 132, H No. 2-12B, 1-11A131-12-2018 00:00:00
Patels Elysium - 3Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C30-10-2023 00:00:00
Patels Elysium - 5Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C30-12-2022 00:00:00
Project Details
  • Project:
    Patels Elysium - 3
  • Location:
  • Survey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C
  • Const. Stage:
    Ongoing
  • Possession:
    30 Oct 2023
Developer Details

  • Developer:
    Apace Realty
  • Phone:
  • Address:
  • Jeevandeep Apartment
Project RERA Details
MAHA REARA No: P51700010280
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Jitendra S Patel Samarthya Engineers
Funding Bank IDBI BANK
Proposed Possession 30 Oct 2023
Revised Possession 30 Oct 2023
Extended Possession
Litigations No Litigations
Last Modified 24 Aug 2017
Last Retrived 26 Jul 2025
Patels Elysium - 3 QR Code
Patels Elysium - 3
MahaRERA - P51700010280
Apartment Details & Configuration
TypeArea
1 BHK WING B30.08 Sq.mts. ( 324 Sq.ft. )
1 BHK WING B30.18 Sq.mts. ( 325 Sq.ft. )
1 BHK WING B30.43 Sq.mts. ( 328 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Patels Elysium - 3last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
Being Done As Per Norms
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Being Done As Per Applicable Norms
Energy management
Na
Fire Protection And Fire Safety Requirements70% completed
70% Complete
Being Done As Per Norms
Landscaping & Tree Planting50% completed
50% Complete
Being Done As Per Norms
Open Parking50% completed
50% Complete
Being Done As Per Norms
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed As Per Applicable Norms
Solid Waste Management And Disposal
Na
Storm Water Drains75% completed
75% Complete
Being Done As Per Norms
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting50% completed
50% Complete
Being Done As Per Applicable Norms
Water Supply
Will Be Done As Per Applicable Norms
Buildings / Wings in Patels Elysium - 3
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Patels Elysium - 3 by Apace Realtylast updated on 26 Jul 2025 as per information obtained from MARA RERA.

3007 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

65 apartments in total
Total
65
Booked
65
Available
0

Saleable Area Statistics (Sq. ft.)

21165 Total
Total
21165
Booked
21165
Available
0
Total 65 apartments in project. 65 apartments booked. 100% apartments booked.
Total 21165 Sq.ft. saleable area. 21165 saleable area booked.
100% area booked.

Patels Elysium - 3 - B Wing - G To 11Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Patels Elysium - 3 - B Wing - G To 11Th FloorsOct 2022121010251
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK WING B30.08 Sq.mts. ( 324 Sq.ft. )9
9 Booked100% Booked
100% Booked
1 BHK WING B30.18 Sq.mts. ( 325 Sq.ft. )34
34 Booked100% Booked
100% Booked
1 BHK WING B30.43 Sq.mts. ( 328 Sq.ft. )22
22 Booked100% Booked
100% Booked
65 total apartments / 65 apartments booked. 100% apartments booked.
Work Description in Building Patels Elysium - 3 - B Wing - G To 11Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress86% done
86% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Apace Realty
for Project
Patels Elysium - 3
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation