Project overview

Parmar Jewel Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000011450. Parmar Jewel Residency is located at 20 H No 4,21 Hno 1/2A, 1/2B, 1/2C 1/2D. This is a Ongoing being developed by Parmarbuildtech.

Parmar Jewel Residency has GALA Apartments with carpet areas ranging from 510 to 700 Sq.ft. Carpet. The Project has total 159 of which 24 are currently available for sale.

Parmar Jewel Residency is being developed on a total land area of 83959 Sq.ft. Parmar Jewel Residency has 2 Wings / Towers A Wing , B Wing,Parmar Building No 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Parmar Jewel Residency
  • Location:
  • 20 H No 4,21 Hno 1/2A, 1/2B, 1/2C 1/2D
  • Const. Stage:
    Ongoing
  • Possession:
    31 Jul 2020
Developer Details

  • Developer:
    Parmarbuildtech
  • Phone:
  • Address:
  • Shree Hari (Parmar) Ind
Project RERA Details
MAHA REARA No: P99000011450
Project Type Others
RERA Project Status Ongoing
Architect Encon
Funding Bank IDBI BANK
Proposed Possession 31 Jul 2020
Revised Possession 31 Jul 2020
Extended Possession 30 Jul 2024
Litigations No Litigations
Last Modified 12 Aug 2022
Last Retrived 28 Jul 2025
Parmar Jewel Residency QR Code
Parmar Jewel Residency
MahaRERA - P99000011450
Apartment Details & Configuration
TypeArea
1 BHK34.75 Sq.mts. ( 374 Sq.ft. )
1 BHK37.16 Sq.mts. ( 400 Sq.ft. )
1 BHK38.46 Sq.mts. ( 414 Sq.ft. )
1 BHK38.55 Sq.mts. ( 415 Sq.ft. )
1 BHK40.23 Sq.mts. ( 433 Sq.ft. )
2 BHK51.93 Sq.mts. ( 559 Sq.ft. )
2 BHK53.51 Sq.mts. ( 576 Sq.ft. )
2 BHK60.57 Sq.mts. ( 652 Sq.ft. )
2 BHK60.76 Sq.mts. ( 654 Sq.ft. )
3 BHK78.97 Sq.mts. ( 850 Sq.ft. )
4 BHK107.53 Sq.mts. ( 1157 Sq.ft. )
SHOP 159.08 Sq.mts. ( 636 Sq.ft. )
SHOP 2 AND 310.82 Sq.mts. ( 116 Sq.ft. )
SHOP 4 AND 512.16 Sq.mts. ( 131 Sq.ft. )
SHOP 68.73 Sq.mts. ( 94 Sq.ft. )
SHOP 733.66 Sq.mts. ( 362 Sq.ft. )
GALA47.38 Sq.mts. ( 510 Sq.ft. )
GALA65.03 Sq.mts. ( 700 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Parmar Jewel Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
Work In Progress
Community Buildings100% completed
95% Complete
Done
Electrical Meter Room, Sub-Station, Receiving Station
Work Will Start
Energy management
Work Will Start
Fire Protection And Fire Safety Requirements10% completed
10% Complete
Work In Progress
Landscaping & Tree Planting50% completed
50% Complete
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Work In Progress
Solid Waste Management And Disposal
Work Will Start
Storm Water Drains80% completed
80% Complete
Work In Progess
Street Lighting60% completed
60% Complete
Work In Progress
Treatment And Disposal Of Sewage And Sullage Water70% completed
70% Complete
Work In Progress
Water Conservation, Rain water Harvesting60% completed
60% Complete
Work In Progress
Water Supply
Work Will Start
Buildings / Wings in Parmar Jewel Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Parmar Jewel Residency by Parmarbuildtechlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

83959 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

159 apartments in total
Total
159
Booked
135
Available
24

Saleable Area Statistics (Sq. ft.)

85953 Total
Total
85953
Booked
70855
Available
15098
Total 159 apartments in project. 135 apartments booked. 84% apartments booked.
Total 85953 Sq.ft. saleable area. 70855 saleable area booked.
82% area booked.

A Wing , B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A Wing , B WingJul 202213101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.75 Sq.mts. ( 374 Sq.ft. )12
11 Booked91% Booked
91% Booked
1 BHK37.16 Sq.mts. ( 400 Sq.ft. )12
10 Booked83% Booked
83% Booked
1 BHK38.46 Sq.mts. ( 414 Sq.ft. )12
9 Booked75% Booked
75% Booked
1 BHK38.55 Sq.mts. ( 415 Sq.ft. )12
10 Booked83% Booked
83% Booked
1 BHK40.23 Sq.mts. ( 433 Sq.ft. )24
24 Booked100% Booked
100% Booked
2 BHK51.93 Sq.mts. ( 559 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK53.51 Sq.mts. ( 576 Sq.ft. )12
11 Booked91% Booked
91% Booked
2 BHK60.57 Sq.mts. ( 652 Sq.ft. )11
8 Booked72% Booked
72% Booked
2 BHK60.76 Sq.mts. ( 654 Sq.ft. )12
10 Booked83% Booked
83% Booked
3 BHK78.97 Sq.mts. ( 850 Sq.ft. )22
13 Booked59% Booked
59% Booked
4 BHK107.53 Sq.mts. ( 1157 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 159.08 Sq.mts. ( 636 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 2 AND 310.82 Sq.mts. ( 116 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP 4 AND 512.16 Sq.mts. ( 131 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP 68.73 Sq.mts. ( 94 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 733.66 Sq.mts. ( 362 Sq.ft. )1
None Booked0% Booked
0% Booked
149 total apartments / 125 apartments booked. 83% apartments booked.
Work Description in Building A Wing , B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress76% done
76% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress76% done
76% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
work-in-progress93% done
93% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress83% done
83% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress60% done
60% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress93% done
93% Booked

Parmar Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parmar Building No 2Jan 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
GALA47.38 Sq.mts. ( 510 Sq.ft. )4
4 Booked100% Booked
100% Booked
GALA65.03 Sq.mts. ( 700 Sq.ft. )6
6 Booked100% Booked
100% Booked
10 total apartments / 10 apartments booked. 100% apartments booked.
Work Description in Building Parmar Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Parmarbuildtech
for Project
Parmar Jewel Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation