Project overview

Park Altezza is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800046141. Park Altezza is located at Cts No 195 (Part). This is a New being developed by Shree Mahavir Estates Tushar Biindu.

Park Altezza has A WING 3 BHK, B WING 3 BHK & C WING 3 BHK Apartments with carpet areas ranging from 1098 to 1062 Sq.ft. Carpet. The Project has total 97 of which 66 are currently available for sale.

Park Altezza is being developed on a total land area of 27317 Sq.ft. Park Altezza has 1 Wings / Towers Park Altezza

ProjectDeveloperLocationPossession
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Om Tanishq ResidencyM/S Laxmi RealtySurvey No 4, Hissa No 1A/230-03-2022 00:00:00
Amakin Mohammediyah Phase 3Amakin Mohammediyah Private Limited31/6 And 730-12-2024 00:00:00
Anantam - Phase IiOyster Living Llp18/1230-06-2022 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Riverview Classic Building No 4, Phase IvRutu BuildersS No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/330-12-2022 00:00:00
Olivia PrimeSkyline Buildpro43/2B/3/230-06-2022 00:00:00
Rai S AaragyaRai Residency Private LimitedSurvey No 46 Hissa No 5 And 730-12-2026 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Mukund VishnuShree Swami Samartha AssociatesTika No 12 Cst No 103A 2A 103A 2B Village Pachpakhadi30-12-2021 00:00:00
Anjani SparshGeeta Space Realtors249-2, 249-730-12-2020 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
Joshi ArcadeMeera DevelopersSurvey No 34-1/12, Hissa No. 3, Plot No. 731-03-2026 00:00:00
Sai Narayana ResidencyMm Landmark Realty LlpS.No.1431-12-2025 00:00:00
Shree Ram Co Operative Housing Society LimitedSantosh Vasant ChitnisS No 704/2 706/6 Old , 286/2 294/6 Cts No 821 And 82231-03-2025 00:00:00
Yashshree Co.Op.Hsg.SocNitant Narendra DesaiSurvey No. 28, Hissa No. 3/2/K30-09-2025 00:00:00
Vaishnavi HightsVaishnavi Builders & Developers58,H No.1 P.No. 1 & 224-06-2024 00:00:00
Fatima Enclave- C WingRais Aziz Qureshi46/4 , 46/531-12-2025 00:00:00
Shree Prabhucharan Chs.LtdShree Prabhucharan Co-Op Housing Society66/5/6731-03-2024 00:00:00
Aastha OmkarAastha RealtorsS. No. 56, H. No. 35/D/2B/1 To 35/D/2B/14 And H. No. 35/D/2B/15/131-12-2026 00:00:00
Fiora EMacrotech Developers Limited260/1A (Pt)31-03-2026 00:00:00
Savaliya HeightsShree Savaliya Homes LlpOld Sno 477 New Sno 119 Hno 131-12-2026 00:00:00
Ramakant ArcadeVastu EnterprisesCts No. 244, 25431-05-2023 00:00:00
Cyber Square - 1Greenscape It Park LlpD-102,D-103 &D-10431-03-2027 00:00:00
Delta LuxuriaShreenathji Organisers Pvt LtdPlot No 6130-04-2027 00:00:00
Giriraj SparshDura Vida Associates77 Tika No 18 Naupada30-06-2025 00:00:00
Kamdhenu VogueM/S Kamdhenu Lifespaces20 Plus 2131-03-2027 00:00:00
Sai Galaxy A- Wing And C- WingJash DevelopersS. No. 10 Hissa No. 231-12-2025 00:00:00
Tanishka ResidencyAnmol DevelopersSurvey No 61 Hissa No 2C/9A/10D/2B, Survey No 80 Hissa No 9A15-01-2023 00:00:00
Unique ElanzaUnique Star Developers LlpS No 29 H No 4 And S No 30 H No 5 Village Ghodbunder25-03-2027 00:00:00
Sindhri SagarRounak Shyam PanjwaniU No 75(P) Cts No 30783 9458 (P) Sheet No 49 R .No 163931-12-2024 00:00:00
Swarup TowerBaba RealtySurvey No 124 Hissa No 1/B31-12-2024 00:00:00
Shivalaya Complex Ph 2 Wing BM/S Balaji Group Of CompaniesSurvey No 17 Hissa No 131-12-2022 00:00:00
Amina Bi Inamdar TowerRoyal Infra61 To 6431-03-2024 00:00:00
Seva SmrutiNeelpadma AssociatesC.T.S.No 1150 To 115131-05-2024 00:00:00
Ramdev BaseraRamdev BaseraOld Sno 225 New Sno 188 Hno 7, 9Pt, 10Pt31-12-2025 00:00:00
Navkar AvenueNavkar EnterprisesCts No 18 & 19/ T No 1031-12-2025 00:00:00
Krishna Highlands Phase 1M/S Rohan ConstructionSurvey No 6 Hissa No 3B31-12-2025 00:00:00
Shivdas ArcadeAdi EnterprisesOld Survey No. 245 Hissa No. 1 And New Survey No. 9 Hissa No. 131-01-2023 00:00:00
Watson ApartmentSai Prakash Builders And DevelopersPlot No 292, Cts No 440731-10-2024 00:00:00
Arihant Aaradhya Phase IArihant Superstructures Limited1431-03-2029 00:00:00
Rai S VrundavanRai Residency Private LimitedSurvey No 64 Hissa No 230-12-2023 00:00:00
Takshila ResidencyDelux AssociatesS No 157/13Pt S No 158/1Pt Plot No 1 And 230-12-2023 00:00:00
Om RamchandraLaxmi DevelopersGaothan Chalata No 109 House No 38030-11-2020 00:00:00
Krishna HeritageShree Balaji ConstructionSurvey No.30 Hissa No. 7-A31-12-2024 00:00:00
The Vaidiki Signature - B WingShree Jari Mari Developers LlpSurvey No 45 Hissa No 9 331-12-2026 00:00:00
Shivdooti ResidencyArun Balu PatilS No 64 H .No 5/A31-12-2025 00:00:00
Sajan Shantaram HeightTirupati DevelopersNew Survey No.1 Hissa No 1130-06-2021 00:00:00
Ram JanakiShree Ganesh Enterprises4947 To 495230-12-2026 00:00:00
Apple ParadiseApple ParadiseU No 99,100, Plot No 262 Part01-01-2019 00:00:00
Saptarshi ChsAdityaraj DevelopersBuilding No 28 And 2931-03-2026 00:00:00
Giridhar ApartmentOm EnterprisesCts No 1389A,139531-12-2024 00:00:00
Precious Imperial Phase IiRkr RealityPlot No 2B,S.No.54/3/E P, 55/2 P31-08-2026 00:00:00
Mavis Tower A Wing From 5Th Floor To 7Th FloorM/S. Unit Arsen Developers (Joint Venture)431C Part31-12-2019 00:00:00
Infinite ResidencyMistry Construction Co. Pvt. Ltd.Pocket D And E30-06-2029 00:00:00
Mansipooja HeightS K InfrastructureSurvey No 3 Hissa No 630-03-2023 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Seasons ParkShree Balaji HomesS No 49 H No 4/A, 4/B,6/D30-12-2022 00:00:00
Amrut SiddhiJayshree Builders40/2 40/3 40/4 40/5A 40/6 40/7 41/3 41/4A 41/4B 41/4C30-12-2023 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Vaibhav HorizonVaibhav Siddhi Construction Co.563 4 Pt/4 Pt/4 Pt24-09-2023 00:00:00
Aramus ResidencyAramus Realty Llp34A30-12-2023 00:00:00
Palava Florea - A To DPalava Dwellers Private Limited61 Pt 62 Pt Village Khoni31-07-2023 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
PurvaGnp Developers58/66/14C And 58/66/15 Plot No 14 And 1531-12-2019 00:00:00
Foresta & FioraPalava Dwellers Private Limited53/3,65/15A, 65/15B28-08-2023 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Krishna IconShree Hari RealtyPlto No. 5, Sector-21, Ghansoli30-05-2022 00:00:00
Palava Olivia CPalava Dwellers Private Limited63 By 1 63 By 2 64 By 1 Village Khoni28-08-2023 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Chintamani Habitat Angelica Type K And LJashnani Construction Private Limited35/3,107/1,31/A30-12-2024 00:00:00
Giriraj Dreams, The State Bank Of India Employees Cooperative Housing Society LtdPridedream Realtors Private LimitedCts 271 To 279, 76, 202630-12-2023 00:00:00
Rajoba SolitaireM/S. Gangadhar Associates58B/1A, Sector Ii, Tikka No. 2 Village Thane30-06-2026 00:00:00
Shree Gajanan Enterprises Rukhmini ChsShree Gajanan Enterprises Rukhmini ChsPlot No. 331-07-2026 00:00:00
Dosti West County - Phase 5 - Dosti Olive - Wing ADosti EnterprisesSurvey No 16/10/A/1(Pt), 16/9/A(Pt), 16/8/A(Pt)30-09-2028 00:00:00
Ganesh Villa ChslBhavani EnterprisesSurvey No 7A/4/A/330-06-2026 00:00:00
Mohan Nano Estates IiiMohan Lifespaces Llp24/1,24/2P,24/6P,24/8,24/9,25/1,25/231-12-2019 00:00:00
Building No. 2 Wings A And B AlpineSd Corporation Private Limited840 A/130-12-2020 00:00:00
PrathamRoodraksh Probuilder And Infracon Private LimitedCts 284B 284D31-12-2019 00:00:00
Reliable ResidencyReliable InfraventuresPLOT NO 72 SC S NO 12, 130-04-2024 00:00:00
Aadi AarambhNirman Construction129/1 A And 129/1B28-02-2018 00:00:00
Crystal HeightsNirala Construction424B, 425, 416B, 421/1 To 3, 421, 417/1 To 430-12-2021 00:00:00
Project Details
  • Project:
    Park Altezza
  • Location:
  • Cts No 195 (Part)
  • Const. Stage:
    New
  • Possession:
    31 Dec 2029
Developer Details

  • Developer:
    Shree Mahavir Estates Tushar Biindu
  • Phone:
  • Address:
  • Aditya A Wing
Project RERA Details
MAHA REARA No: P51800046141
Project Type Residential / Group Housing
RERA Project Status New
Architect Ashim Khatri - L. S.
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2029
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 20 Jun 2022
Last Retrived 26 Jul 2025
Park Altezza QR Code
Park Altezza
MahaRERA - P51800046141
Apartment Details & Configuration
TypeArea
A WING 3 BHK102 Sq.mts. ( 1098 Sq.ft. )
A WING 3 BHK98.63 Sq.mts. ( 1062 Sq.ft. )
A WING 3 BHK98.69 Sq.mts. ( 1062 Sq.ft. )
B WING 3 BHK98.65 Sq.mts. ( 1062 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Park Altezzalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Wip
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Wip
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Wip
Storm Water Drains
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Wip
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Park Altezza
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Park Altezza by Shree Mahavir Estates Tushar Biindulast updated on 26 Jul 2025 as per information obtained from MARA RERA.

27317 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

97 apartments in total
Total
97
Booked
31
Available
66

Saleable Area Statistics (Sq. ft.)

103552 Total
Total
103552
Booked
32922
Available
70629
Total 97 apartments in project. 31 apartments booked. 31% apartments booked.
Total 103552 Sq.ft. saleable area. 32922 saleable area booked.
32% area booked.

Park Altezza

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Park AltezzaDec 20291912100228
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
A WING 3 BHK102 Sq.mts. ( 1098 Sq.ft. )7
None Booked0% Booked
0% Booked
A WING 3 BHK98.63 Sq.mts. ( 1062 Sq.ft. )12
5 Booked41% Booked
41% Booked
A WING 3 BHK98.69 Sq.mts. ( 1062 Sq.ft. )16
7 Booked43% Booked
43% Booked
B WING 3 BHK98.65 Sq.mts. ( 1062 Sq.ft. )24
7 Booked29% Booked
29% Booked
C WING 3 BHK98.69 Sq.mts. ( 1062 Sq.ft. )18
8 Booked44% Booked
44% Booked
C WING 3 BHK98.63 Sq.mts. ( 1062 Sq.ft. )12
4 Booked33% Booked
33% Booked
C WING 3 BHK102 Sq.mts. ( 1098 Sq.ft. )8
None Booked0% Booked
0% Booked
97 total apartments / 31 apartments booked. 31% apartments booked.
Work Description in Building Park AltezzaCompletion
Basement (if any)
work-in-progress95% done
95% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress95% done
95% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress95% done
95% Booked
X number of Podiums
work-in-progress90% done
90% Booked
X number of Slabs of Super Structure
work-in-progress40% done
40% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Mahavir Estates Tushar Biindu
for Project
Park Altezza
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation