Project overview

Parekh Celeste is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800047291. Parekh Celeste is located at 903/2. This is a New being developed by Yash Akar Developers Llp.

Parekh Celeste has 1 BHK Apartments with carpet areas ranging from 317 to 432 Sq.ft. Carpet. The Project has total 37 of which 23 are currently available for sale.

Parekh Celeste is being developed on a total land area of 14494 Sq.ft. Parekh Celeste has 2 Wings / Towers Parekh Celeste A Wing,Parekh Celeste B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Parekh Celeste
  • Location:
  • 903/2
  • Const. Stage:
    New
  • Possession:
    30 Apr 2027
Developer Details

  • Developer:
    Yash Akar Developers Llp
  • Phone:
  • Address:
  • Dheeraj Heritage
Project RERA Details
MAHA REARA No: P51800047291
Project Type Residential / Group Housing
RERA Project Status New
Architect Ketan Vaidya Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Apr 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Oct 2022
Last Retrived 26 Jul 2025
Parekh Celeste QR Code
Parekh Celeste
MahaRERA - P51800047291
Apartment Details & Configuration
TypeArea
1 BHK36.88 Sq.mts. ( 397 Sq.ft. )
2 BHK55.93 Sq.mts. ( 602 Sq.ft. )
1 BHK29.45 Sq.mts. ( 317 Sq.ft. )
1 BHK34.1 Sq.mts. ( 367 Sq.ft. )
1 BHK40.13 Sq.mts. ( 432 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Parekh Celestelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Planned As Per Power Supply Company
Energy management
Planned
Fire Protection And Fire Safety Requirements
Planned As Per Cfo Noc
Landscaping & Tree Planting
Trees Will Be Planted Before O.C.C.
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Executed As Per The Remarks From Mcgm
Solid Waste Management And Disposal
Noc Received
Storm Water Drains
Will Be Executed As Per The Remarks From Mcgm
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Sewage And Sullage Water Pipe Connected To Mcgm
Water Conservation, Rain water Harvesting
Noc Received
Water Supply
Construction Connection Availed
Buildings / Wings in Parekh Celeste
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Parekh Celeste by Yash Akar Developers Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

14494 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

37 apartments in total
Total
37
Booked
14
Available
23

Saleable Area Statistics (Sq. ft.)

17414 Total
Total
17414
Booked
6088
Available
11326
Total 37 apartments in project. 14 apartments booked. 37% apartments booked.
Total 17414 Sq.ft. saleable area. 6088 saleable area booked.
35% area booked.

Parekh Celeste A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parekh Celeste A WingApr 2027141000012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.88 Sq.mts. ( 397 Sq.ft. )12
5 Booked41% Booked
41% Booked
2 BHK55.93 Sq.mts. ( 602 Sq.ft. )13
3 Booked23% Booked
23% Booked
25 total apartments / 8 apartments booked. 32% apartments booked.
Work Description in Building Parekh Celeste A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Parekh Celeste B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parekh Celeste B WingApr 2027141000028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.45 Sq.mts. ( 317 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK34.1 Sq.mts. ( 367 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK40.13 Sq.mts. ( 432 Sq.ft. )8
3 Booked37% Booked
37% Booked
12 total apartments / 6 apartments booked. 50% apartments booked.
Work Description in Building Parekh Celeste B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Yash Akar Developers Llp
for Project
Parekh Celeste
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation