Project overview

Parasnath Nagari Building No 5 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000007350. Parasnath Nagari Building No 5 is located at 58 60 61 62 63. This is a Ongoing being developed by Shree Parasnath Builders.

Parasnath Nagari Building No 5 has 1 BHK & SHOP Apartments with carpet areas ranging from 1212 to 14065 Sq.ft. Carpet. The Project has total 319 of which 92 are currently available for sale.

Parasnath Nagari Building No 5 is being developed on a total land area of 85466 Sq.ft. Parasnath Nagari Building No 5 has 7 Wings / Towers Parasnath Nagari Building No 5 A,Parasnath Nagari Building No 5 B,Parasnath Nagari Building No 5 C,Parasnath Nagari Building No 5 D,Parasnath Nagari Building No 5 E,Parasnath Nagari Building No 5 F,Parasnath Nagari Building No 5 G

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Parasnath Nagari Building No 5
  • Location:
  • 58 60 61 62 63
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Shree Parasnath Builders
  • Phone:
  • Address:
  • Park Land 2
Project RERA Details
MAHA REARA No: P99000007350
Project Type Others
RERA Project Status Ongoing
Architect Abhay Raut
Funding Bank UNION BANK OF INDIA
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2021
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 28 Jul 2025
Parasnath Nagari Building No 5 QR Code
Parasnath Nagari Building No 5
MahaRERA - P99000007350
Apartment Details & Configuration
TypeArea
1 BHK1306.71 Sq.mts. ( 14065 Sq.ft. )
SHOP112.58 Sq.mts. ( 1212 Sq.ft. )
1 BHK744.36 Sq.mts. ( 8012 Sq.ft. )
1 BHK1116.39 Sq.mts. ( 12017 Sq.ft. )
1 BHK788.04 Sq.mts. ( 8482 Sq.ft. )
1 BHK1339.88 Sq.mts. ( 14422 Sq.ft. )
1 BHK1296.1 Sq.mts. ( 13951 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Parasnath Nagari Building No 5last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
-
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
-
Storm Water Drains
-
Street Lighting
-
Treatment And Disposal Of Sewage And Sullage Water
-
Water Conservation, Rain water Harvesting
-
Water Supply
-
Buildings / Wings in Parasnath Nagari Building No 5
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Parasnath Nagari Building No 5 by Shree Parasnath Builderslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

85466 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

319 apartments in total
Total
319
Booked
227
Available
92

Saleable Area Statistics (Sq. ft.)

3862666 Total
Total
3862666
Booked
2895670
Available
966996
Total 319 apartments in project. 227 apartments booked. 71% apartments booked.
Total 3862666 Sq.ft. saleable area. 2895670 saleable area booked.
75% area booked.

Parasnath Nagari Building No 5 A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 5 AJan 19008101021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1306.71 Sq.mts. ( 14065 Sq.ft. )44
37 Booked84% Booked
84% Booked
SHOP112.58 Sq.mts. ( 1212 Sq.ft. )7
None Booked0% Booked
0% Booked
51 total apartments / 37 apartments booked. 72% apartments booked.
Work Description in Building Parasnath Nagari Building No 5 ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked

Parasnath Nagari Building No 5 B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 5 BJan 19008101021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK744.36 Sq.mts. ( 8012 Sq.ft. )31
23 Booked74% Booked
74% Booked
31 total apartments / 23 apartments booked. 74% apartments booked.
Work Description in Building Parasnath Nagari Building No 5 BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked

Parasnath Nagari Building No 5 C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 5 CJan 19008101021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1116.39 Sq.mts. ( 12017 Sq.ft. )46
36 Booked78% Booked
78% Booked
46 total apartments / 36 apartments booked. 78% apartments booked.
Work Description in Building Parasnath Nagari Building No 5 CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked

Parasnath Nagari Building No 5 D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 5 DJan 19008101021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK788.04 Sq.mts. ( 8482 Sq.ft. )32
18 Booked56% Booked
56% Booked
32 total apartments / 18 apartments booked. 56% apartments booked.
Work Description in Building Parasnath Nagari Building No 5 DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor

Parasnath Nagari Building No 5 E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 5 EJan 19008101021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1339.88 Sq.mts. ( 14422 Sq.ft. )60
60 Booked100% Booked
100% Booked
60 total apartments / 60 apartments booked. 100% apartments booked.
Work Description in Building Parasnath Nagari Building No 5 ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Parasnath Nagari Building No 5 F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 5 FJan 19008101021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1296.1 Sq.mts. ( 13951 Sq.ft. )45
45 Booked100% Booked
100% Booked
45 total apartments / 45 apartments booked. 100% apartments booked.
Work Description in Building Parasnath Nagari Building No 5 FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Parasnath Nagari Building No 5 G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 5 GJan 19008101021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1306.71 Sq.mts. ( 14065 Sq.ft. )47
SHOP112.58 Sq.mts. ( 1212 Sq.ft. )7
None Booked0% Booked
0% Booked
54 total apartments / 8 apartments booked. 14% apartments booked.
Work Description in Building Parasnath Nagari Building No 5 GCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Parasnath Builders
for Project
Parasnath Nagari Building No 5
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation