Project overview

Parasnath Nagari Building No. 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000009841. Parasnath Nagari Building No. 1 is located at 58, 60. This is a Ongoing being developed by Shree Parasnath Builders.

Parasnath Nagari Building No. 1 has 1 BHK & SHOP Apartments with carpet areas ranging from 13195 to 2422 Sq.ft. Carpet. The Project has total 392 of which 139 are currently available for sale.

Parasnath Nagari Building No. 1 is being developed on a total land area of 68567 Sq.ft. out of which 68567 Sq.ft. i.e 100% is reserved for recreational purposes. Parasnath Nagari Building No. 1 has 6 Wings / Towers Parasnath Nagari Building No 1 A,Parasnath Nagari Building No 1 B,Parasnath Nagari Building No 1 C,Parasnath Nagari Building No 1 D,Parasnath Nagari Building No 1 E,Parasnath Nagari Building No 1 F

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Parasnath Nagari Building No. 1
  • Location:
  • 58, 60
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2018
Developer Details

  • Developer:
    Shree Parasnath Builders
  • Phone:
  • Address:
  • Park Land 2
Project RERA Details
MAHA REARA No: P99000009841
Project Type Others
RERA Project Status Ongoing
Architect Abhay Raut
Funding Bank UNION BANK OF INDIA
Proposed Possession 30 Jun 2018
Revised Possession 30 Jun 2018
Extended Possession 30 Jun 2024
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 28 Jul 2025
Parasnath Nagari Building No. 1 QR Code
Parasnath Nagari Building No. 1
MahaRERA - P99000009841
Apartment Details & Configuration
TypeArea
1 BHK1225.84 Sq.mts. ( 13195 Sq.ft. )
SHOP319.79 Sq.mts. ( 3442 Sq.ft. )
SHOP121.84 Sq.mts. ( 1311 Sq.ft. )
SHOP224.99 Sq.mts. ( 2422 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Parasnath Nagari Building No. 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Fire Noc Given By Vvcmc
Community Buildings
As Per Tree Noc Given By Vvcmc
Electrical Meter Room, Sub-Station, Receiving Station30% completed
30% Complete
As Per Report Given By Consultant
Energy management
As Per Report Given By Consultant
Fire Protection And Fire Safety Requirements
As Per Report Given By Rwh Consulatnt
Landscaping & Tree Planting
Septic Tank
Open Parking
-
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Chamber
Solid Waste Management And Disposal
Na
Storm Water Drains80% completed
80% Complete
Lines
Street Lighting
-
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Report Given By Consultant
Water Supply
Facility Will Start Once Vvcmc Water Supply Commen
Buildings / Wings in Parasnath Nagari Building No. 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Parasnath Nagari Building No. 1 by Shree Parasnath Builderslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

68567 Sq. ft.

Project Area

68567 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

392 apartments in total
Total
392
Booked
253
Available
139

Saleable Area Statistics (Sq. ft.)

4794159 Total
Total
4794159
Booked
3192030
Available
1602129
Total 392 apartments in project. 253 apartments booked. 64% apartments booked.
Total 4794159 Sq.ft. saleable area. 3192030 saleable area booked.
67% area booked.

Parasnath Nagari Building No 1 A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 1 AJan 190086085020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1225.84 Sq.mts. ( 13195 Sq.ft. )56
52 Booked92% Booked
92% Booked
SHOP319.79 Sq.mts. ( 3442 Sq.ft. )17
15 Booked88% Booked
88% Booked
73 total apartments / 67 apartments booked. 91% apartments booked.
Work Description in Building Parasnath Nagari Building No 1 ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Parasnath Nagari Building No 1 B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 1 BJan 19008601021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1225.84 Sq.mts. ( 13195 Sq.ft. )76
49 Booked64% Booked
64% Booked
SHOP121.84 Sq.mts. ( 1311 Sq.ft. )7
None Booked0% Booked
0% Booked
83 total apartments / 49 apartments booked. 59% apartments booked.
Work Description in Building Parasnath Nagari Building No 1 BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Parasnath Nagari Building No 1 C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 1 CJan 19008601021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1225.84 Sq.mts. ( 13195 Sq.ft. )56
27 Booked48% Booked
48% Booked
56 total apartments / 27 apartments booked. 48% apartments booked.
Work Description in Building Parasnath Nagari Building No 1 CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Parasnath Nagari Building No 1 D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 1 DJan 1900860102021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1225.84 Sq.mts. ( 13195 Sq.ft. )56
56 total apartments / 2 apartments booked. 3% apartments booked.
Work Description in Building Parasnath Nagari Building No 1 DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Parasnath Nagari Building No 1 E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 1 EJan 19008601021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1225.84 Sq.mts. ( 13195 Sq.ft. )56
56 Booked100% Booked
100% Booked
56 total apartments / 56 apartments booked. 100% apartments booked.
Work Description in Building Parasnath Nagari Building No 1 ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Parasnath Nagari Building No 1 F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parasnath Nagari Building No 1 FJan 19008601021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK1225.84 Sq.mts. ( 13195 Sq.ft. )56
52 Booked92% Booked
92% Booked
SHOP224.99 Sq.mts. ( 2422 Sq.ft. )12
None Booked0% Booked
0% Booked
68 total apartments / 52 apartments booked. 76% apartments booked.
Work Description in Building Parasnath Nagari Building No 1 FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Parasnath Builders
for Project
Parasnath Nagari Building No. 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation