Project overview

Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000029292. Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C is located at 1023/7. This is a New being developed by Brajbhoomi Developers.

Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 221 to 460 Sq.ft. Carpet. The Project has total 37 of which 30 are currently available for sale.

Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C is being developed on a total land area of 18084 Sq.ft. Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C has 1 Wings / Towers Paramount Enclave, Building No-3, Wing-A, Type-C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C
  • Location:
  • 1023/7
  • Const. Stage:
    New
  • Possession:
    31 Mar 2024
Developer Details

  • Developer:
    Brajbhoomi Developers
  • Phone:
  • Address:
  • Shubham Apartment
Project RERA Details
MAHA REARA No: P99000029292
Project Type Residential / Group Housing
RERA Project Status New
Architect Nishant P Patil
Funding Bank IDBI BANK
Proposed Possession 31 Mar 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 23 Apr 2024
Last Retrived 28 Jul 2025
Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C QR Code
Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C
MahaRERA - P99000029292
Apartment Details & Configuration
TypeArea
1 BHK29.12 Sq.mts. ( 313 Sq.ft. )
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )
1RK20.55 Sq.mts. ( 221 Sq.ft. )
2 BHK42.72 Sq.mts. ( 460 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-Clast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Tree Planting To Be Provided
Electrical Meter Room, Sub-Station, Receiving Station
Only Electrical Meter Room To Be Provided.
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Septick Tank) To Be Provi
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Sewerage(Chamber
Solid Waste Management And Disposal
Na
Storm Water Drains90% completed
90% Complete
Lines
Street Lighting
Strom Water Drains Work In Process.
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Street Lighting To Be Provided.
Water Supply100% completed
95% Complete
Na
Buildings / Wings in Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C by Brajbhoomi Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

18084 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

37 apartments in total
Total
37
Booked
7
Available
30

Saleable Area Statistics (Sq. ft.)

11526 Total
Total
11526
Booked
2017
Available
9509
Total 37 apartments in project. 7 apartments booked. 18% apartments booked.
Total 11526 Sq.ft. saleable area. 2017 saleable area booked.
18% area booked.

Paramount Enclave, Building No-3, Wing-A, Type-C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Paramount Enclave, Building No-3, Wing-A, Type-CMar 20245100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.12 Sq.mts. ( 313 Sq.ft. )9
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )14
4 Booked28% Booked
28% Booked
1RK20.55 Sq.mts. ( 221 Sq.ft. )9
2 Booked22% Booked
22% Booked
2 BHK42.72 Sq.mts. ( 460 Sq.ft. )5
None Booked0% Booked
0% Booked
37 total apartments / 7 apartments booked. 18% apartments booked.
Work Description in Building Paramount Enclave, Building No-3, Wing-A, Type-CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress55% done
55% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Brajbhoomi Developers
for Project
Paramount Enclave, Phase-Ii, Building No 3, Wing-A, Type-C
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation