Project overview

Paramount C is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700032095. Paramount C is located at Sno 115/5Pt 115/9Pt 115/12Pt,115/13Pt Of Village Majiwade 212/1Pt Of Village Balkum. This is a New being developed by Kalpataru Homes Private Limited.

Paramount C has 2 BHK Apartments with carpet areas ranging from 644 to 645 Sq.ft. Carpet. The Project has total 203 of which 13 are currently available for sale.

Paramount C is being developed on a total land area of 8124 Sq.ft. Paramount C has 1 Wings / Towers Tower 3

ProjectDeveloperLocationPossession
NandigramYogesh Kishor MahajanTikka No 5, 62A/131-03-2025 00:00:00
Windermere Building No 1 To 6A G Superstructures Pvt LtdNew S. No./Old S. No./ H.No. 221/564/1,3,4A,4B,8. New S. No/Old S. No/ H.No/220/565/1,4,6,7,8,9,10. New S. No/Old S. No/H.No/267/567/1,2/1. New S. No/Old S. No/245/579/1A,1B,2,3A,3B,3C,4,5,6,731-12-2027 00:00:00
Paramount BKalpataru Homes Private LimitedS.No. 114/8-Part,114/4-Part30-06-2025 00:00:00
Rental Building A-1 R2Sonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
The EmpressUnique Shanti Developers LlpOld S.No.479/230-03-2023 00:00:00
Lotus ParkReal Enterprise842-A, Plot No. 02,0330-12-2022 00:00:00
Raviraj ApartmentRajendra GhorpadeS.No 85,H. No 11, Plot No 930-12-2022 00:00:00
Krupa SindhuAshish Waman GoleS No 48 H No 8/428-11-2021 00:00:00
Arvind GalaxySanchit EnterprisesTika No 16 Cts No 7830-12-2023 00:00:00
Shree Sai Pooja ApartmentOm Sai RealtyS No 29/A H No 19 Plot No 8730-09-2019 00:00:00
Mauli MadhusudhanRameshwar Patil42160530-03-2023 00:00:00
Salangpur NirmanSalangpur Nirman252 6,7 Part30-12-2022 00:00:00
M K Thakur Complex Phase 1Vraj Ratan Buildcon Pvt LtdSurvey No 77 1A 2 4 501-12-2021 00:00:00
My City - Phase I - Part IiHorizon Projects Pvt LtdSurvey No 36Pt 77Pt31-12-2018 00:00:00
Silver ArcadeSiddhivinayak Enterprises5831-12-2018 00:00:00
Golden Hills B- 3Vihang Enterprises921,923,9241,9243,928130-12-2024 00:00:00
Classic ResidencyClassic ConstructionThane30-06-2021 00:00:00
Sarvodaya ClassicEkta BuildersSurvey No. 28 H.No 530-03-2026 00:00:00
Ten X Era Raymond Realty Tower CRaymond Limited121 Pt 83/3 83/130-01-2029 00:00:00
Guru Ganesh ChsVadnere Builder & DevelopersSurvey No 13 Hissa No 6(A) Plot No 2631-12-2025 00:00:00
Mangeshi NeptuneMangesh GaikarThane31-12-2027 00:00:00
Payal PrideMit Enterprises10430-03-2022 00:00:00
Apollo RetailMacrotech Developers Limited11Pt, 85/8Pt, 85/4Pt30-09-2020 00:00:00
Panvelkar Estate - GreenfordPanvelkar Infrastructures Private LimitedSurvey No. 42 Hissa No 2 And 330-12-2022 00:00:00
Shree Siddhivinayak EnterprisesShree Siddhivinayak Enterprises309,311 To 317, 321,32401-12-2018 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private Limited1411, 2, 3, 144, 1451, 2, 4, 1462, 3, 4, 1481, 1421, 1483130-12-2023 00:00:00
Plot 1 Sector 10 GhansoliCidco Of Maharashtra Ltd.Plot No 130-06-2021 00:00:00
Cosmos Horizon Phase IiConcorde Developers192/2A30-03-2024 00:00:00
Kashi Darshan B WingVarad Raj Construction98/1920-12-2023 00:00:00
Saroj Sadan Chs LtdShrusti DevelopersThane19-01-2026 00:00:00
Narang Privado - BNarang Realty Private Limited146/5/B And 146/6/B/131-03-2028 00:00:00
Keyur Co-Operative Housing Society LtdDhanashree DevelopersKansai31-12-2025 00:00:00
Suyog ApartmentTelange Builders & Developers Private Limited4693 To 469930-03-2025 00:00:00
Prabhat DarshanYashomalhar Construction7015A/1A30-06-2023 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private Limited67/2/P, 67/3A, Sub Plot B30-12-2023 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedGut No 42/131-12-2018 00:00:00
Jai MatadeeAaradhana Developers37531-03-2018 00:00:00
Highland Springs B4- A WingSiddhi Real Estate Developers74/5Apart30-06-2023 00:00:00
Highland Haven Building 6F Mist-B Phase 5Siddhi Krish DevelopersS. N. 75/5, 75/630-12-2024 00:00:00
Highland Park Building 2- K25 Wing A Phase 2Siddhi Gaurav EnterprisesS. N. 87/2 And 82/630-12-2024 00:00:00
Lodha Majiwada - Tower 1Macrotech Developers Limited28/5P, 29/6P, 29/7P, 29/8, 29/9P, 31/8P, 31/4P28-11-2022 00:00:00
Sun OrchidMohammed Siraj Basheer30130-12-2018 00:00:00
Lodha Majiwada - Tower 4Macrotech Developers Limited31/3P, 31/4P, 31/5P, 31/6P, 31/9P28-11-2022 00:00:00
Rustomjee Azziano Wing FKapstone Constructions Private Limited49/1,2,3 , 50/1A,2,3 , 51/1,2,3,4 Pt 31-03-2019 00:00:00
Lodha Amara - Tower 26, 27, 28, 30, 34, 35Macrotech Developers Limited64/3,64/7,65/2,65/3,65/4,65/5, 68/3,68/4,68/5,69/2,69/6,70/1,70/2,70/3,70/430-12-2021 00:00:00
Teri KudratVishnu Jethanand BadlaniPlot No 433, Sheet No 48, Cts No 2578331-10-2024 00:00:00
Kanha ResidencyKulkarnii Builder105A/4/2/3/4/5/4114-05-2025 00:00:00
Trinity MokshRattanraj LifespacesS No 64 1 And 64 231-03-2025 00:00:00
Simone ResidencyM R M DevelopersDaighar Village30-12-2022 00:00:00
Delta WoodsDelta Venture1883Pt30-09-2023 00:00:00
Shreeji LandmarkVinayak DevelopersSurvey No 46 Hissa No 5-130-12-2029 00:00:00
Orion Business ParkNeminath EnterprisesGut No 33 Pt31-03-2019 00:00:00
Tulsi Vrindavan SocietyGaurang AssociatesThane, 40060220-10-2017 00:00:00
Delta VrindavanDelta VentureCts 1838 1840 1883 To 1886 1968 To 1971 2039 To 2044 2100 To 2103 2157 2221 2222 2294 2158 2295 174130-09-2020 00:00:00
Shivsai ParadiseBharat Agri Fert & Realty Realty Ltd112/2A,3,4,5/1,5/2,5/330-12-2028 00:00:00
RubaShreyas Enterprises112/5/430-09-2020 00:00:00
OrchidMehta RealtorsS No 378/131-03-2019 00:00:00
Saket ImperialNirmaan Realty9570,957107-08-2025 00:00:00
Maruti Square Building No 7Maruti Dwellers Private LimitedNew Survey Nos 63 66 And 69 Pt31-12-2027 00:00:00
Paramount FKalpataru Homes Private LimitedSno 115/4/2 Pt 115/5 Pt 115/6 Pt 115/7/2 Pt 115/8/2 Pt 115/10/2 Pt Of Village Majiwade30-09-2024 00:00:00
Sarthi ElanzaSarthi DevelopersS No-264/58 Plot No-5531-10-2023 00:00:00
Bsc It ParkBansal Steel CorporationA21601-06-2024 00:00:00
Runwal Lands EndRunwal Construction Private Limited20/3 Part30-06-2029 00:00:00
Ganesh BhuvanMagnum Homes66830-09-2024 00:00:00
Audumber Flower ValleyAudumber SuperstructuresS No 5/4/D 5/4/B 5/23/B30-06-2025 00:00:00
Spm Dream City Phase 1D K BuildconS No 52 H No 4/531-12-2028 00:00:00
Nirman SignatureShree Sha DevelopersSuevey No.180 Hissa No.3/231-03-2026 00:00:00
Rustomjee La Vie Wing AKapstone Constructions Private LimitedPlot No 8A Survey No 329/3 Pt Of Village Majiwade31-12-2028 00:00:00
Hcs HorizonHcs Realtors LlpOld Survey No 271 New Survey No 82 Hissa No 1131-12-2026 00:00:00
Paramount CKalpataru Homes Private LimitedSno 115/5Pt 115/9Pt 115/12Pt,115/13Pt Of Village Majiwade 212/1Pt Of Village Balkum30-06-2025 00:00:00
My City Phase Ii Cluster 5 Part IiHorizon Projects Pvt Ltd108/1 And 93 Part31-12-2027 00:00:00
The Icon Phase 1Leading Frontier Private LimitedSurvey No 60/18,60/19,Survey No 61/2A To 61/2F, 61/3,62/3,62/5E,62/6,62/7,62/9C30-12-2022 00:00:00
Vardhman Garden Phase IiDiwali Construction CompanyThane31-12-2022 00:00:00
Rustomjee La Familia - Wing BKapstone Constructions Private LimitedSub Plot 8 Survey No 30 2, 30 3,And 329 2Pt31-12-2026 00:00:00
Seven Eleven CourtyardS.S.S AssoicatesThane30-11-2025 00:00:00
Vardhman VatikaDiwali DevelopersSurvey No 21 Part And 22 Part31-12-2019 00:00:00
Panvelkar Estate - Oxford - Phase 1Panvelkar Infrastructures Private LimitedGut No.45/2,46/2,47,49/4,49/9,49/11,49/1230-12-2023 00:00:00
Highland Haven Building 2B Dew-A Phase 2Siddhi Krish DevelopersS. N. 83/1/3 Part, 83/1/331-03-2019 00:00:00
Falco CheshireAanya RealtorsThane, 42110231-10-2016 00:00:00
Highland Springs B4- C WingSiddhi Real Estate Developers74/5A 59/1A 59/1B 46/1830-12-2023 00:00:00
Bhagwan Krishna NiwasQuick Developers27/1201-07-2024 00:00:00
ZenithRunwal Developers Private LimitedSurvey No 51 Hissa No 1 To 15 Survey No 52 Hissa No 1 To 3 Survey No 5330-09-2028 00:00:00
Urban Nest Bldg - 1Cllaro Enterprises Llp127-1A31-12-2024 00:00:00
Maplewoods Phase 1M/S Bks Galaxy Realtors Llp51(2) 56 And 57(2)31-12-2028 00:00:00
Newa Bhakti Park B WingNewa Technocity (I) Private LimitedIt 631-12-2027 00:00:00
Skyrise ResidencyNishith Subandhu LuharPlot No 6/Cts No 7469/S No 38/B/630-07-2025 00:00:00
Priyanka ParadisePriyanka Regency LlpPlot 16A Sector 24 Sanpada Navi Mumbai31-12-2024 00:00:00
Thanekar Palacio Phase IiThanekar Construction LlpSurvey No. 82/2/1 Survey No 83/3/6 Survey No 83/3/7 Survey No 83/4A Plot No 3 5 6 & 731-12-2026 00:00:00
Krishna - B WingNeelkanth Palm Realty149/4/1 Pt, 412/2 Pt30-05-2022 00:00:00
Casa Royale - GrandeLodha Buildcon Private Ltd (Lodha Develoopers Pvt Ltd)161/1A/3P31-01-2018 00:00:00
Indraprasth Wing CSonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
Green SquareSquarefeet Enterprises166/3131-12-2027 00:00:00
Larkins NestPride Property Developers68/13/3F And 68/13/3G31-12-2025 00:00:00
Shanti LegacyAnmol InfraOld S. No. 368, New S. No. 7031-03-2025 00:00:00
Shivanjali HeightsShivanjali ConstructionSurvey No 73, 74, 75, 7630-06-2022 00:00:00
Shree Moreshwar Chs LtdAjay Sanjay MohorikarS No 33 H No. 6/15 Cts No 897331-12-2024 00:00:00
Swami Narendra ResidencyRaj Ratneshwari Developers274/1-B31-12-2026 00:00:00
Veer GalaxyYash InfraSector 2 , 108/4C , 108/4D31-07-2025 00:00:00
Priyanka AvenuePriyanka Regency LlpPlot No 29 Sector 1531-03-2028 00:00:00
Saurabh HeightsS K DevelopersS. No. 81 H No.14 P .No 1/B31-03-2026 00:00:00
Ashar Metro TowersShree Saibaba Grihanirimiti Private LimitedS.No 229 Pt H.No 1,S.No 207 Pt And 208 Pt H No 7 Pt30-12-2024 00:00:00
Highland Park Building 6 And 7- K23 Phase 1Siddhi Gaurav EnterprisesS. N. 85 And 87/231-12-2019 00:00:00
Highland Springs B4- E WingSiddhi Real Estate Developers46/18Pt, 47/13Pt31-10-2019 00:00:00
Krishna Vihar Co-Operative Housing Society LimitedBal Ganapati Laabh DevelopersCts Nos 20/7 And 33A T No 1630-12-2021 00:00:00
Yashanand Chsl Ojass ConstructionsOjass ConstructionsCts No. 4030-03-2022 00:00:00
Highland Haven Building 4D Coral-A Phase 4Siddhi Krish DevelopersS. N. 8231-03-2019 00:00:00
Orion -3Vijay Suraksha Realty LlpSurvey No 238/9Pt, Survey No 252/3/3Pt, Survey No 252/4/1 30-12-2020 00:00:00
Rukmani ResidencyClay Nest Developers42130831-12-2027 00:00:00
Project Details
  • Project:
    Paramount C
  • Location:
  • Sno 115/5Pt 115/9Pt 115/12Pt,115/13Pt Of Village Majiwade 212/1Pt Of Village Balkum
  • Const. Stage:
    New
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    Kalpataru Homes Private Limited
  • Phone:
  • Address:
  • Kalpataru Synergy
Project RERA Details
MAHA REARA No: P51700032095
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Jun 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 12 Feb 2025
Last Retrived 26 Jul 2025
Paramount C QR Code
Paramount C
MahaRERA - P51700032095
Apartment Details & Configuration
TypeArea
2 BHK59.79 Sq.mts. ( 644 Sq.ft. )
2 BHK59.89 Sq.mts. ( 645 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Paramount Clast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
2 No. of Common Basement1% completed
1% Complete
Common Amenities As Per Afs
3 Nos of Common Podium
Common Development As Per Afs
Aggregate area of recreational Open Space
5460 Sq Mt Common As Per Afs For Whole Project
Club House other Recreational Areas and Swimming Pool
Supply From Local Authority
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station39% completed
39% Complete
Electrical Meter Room And Sub-Station Only
Energy management20% completed
20% Complete
To Be Done Before Completion Of Whole Project
Fire Protection And Fire Safety Requirements90% completed
90% Complete
To Be Done Before Completion Of Whole Project
Internal Roads & Footpaths
To Be Done Before Completion Of Whole Project
Landscaping & Tree Planting100% completed
95% Complete
To Be Done Before Completion Of Whole Project
Open Parking
To Be Done Before Completion Of Whole Project
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
To Be Done Before Completion Of Whole Project
Solid Waste Management And Disposal100% completed
95% Complete
Stp Only
Storm Water Drains100% completed
95% Complete
To Be Done Before Completion Of Whole Project
Street Lighting
To Be Done Before Completion Of Whole Project
Treatment And Disposal Of Sewage And Sullage Water
To Be Done Before Completion Of Whole Project
Water Conservation, Rain water Harvesting100% completed
95% Complete
To Be Done Before Completion Of Whole Project
Water Supply
To Be Done Before Completion Of Whole Project
Buildings / Wings in Paramount C
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Paramount C by Kalpataru Homes Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

8124 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

203 apartments in total
Total
203
Booked
190
Available
13

Saleable Area Statistics (Sq. ft.)

130797 Total
Total
130797
Booked
122430
Available
8368
Total 203 apartments in project. 190 apartments booked. 93% apartments booked.
Total 130797 Sq.ft. saleable area. 122430 saleable area booked.
94% area booked.

Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3Mar 202536111315546
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.79 Sq.mts. ( 644 Sq.ft. )63
51 Booked80% Booked
80% Booked
2 BHK59.89 Sq.mts. ( 645 Sq.ft. )140
139 Booked99% Booked
99% Booked
203 total apartments / 190 apartments booked. 93% apartments booked.
Work Description in Building Tower 3Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress21% done
21% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress73% done
73% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress67% done
67% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kalpataru Homes Private Limited
for Project
Paramount C
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation