Project overview

Paradigm Anantaara is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800034854. Paradigm Anantaara is located at Fp No 526 Pt & 531. This is a New being developed by Shubhyuvi Infrastructure Llp.

Paradigm Anantaara has Proposed 2BHK Apartments with carpet areas ranging from 458 to 458 Sq.ft. Carpet. The Project has total 224 of which 224 are currently available for sale.

Paradigm Anantaara is being developed on a total land area of 55007 Sq.ft. out of which 4494 Sq.ft. i.e 8% is reserved for recreational purposes. Paradigm Anantaara has 3 Wings / Towers Segment I Of Sale Building From Ground To 30Th Fl,Segment Ii Of Sale Building 31St To 40Th Floors,Segment Iii Of Sale Building 41St Floor And Above

ProjectDeveloperLocationPossession
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Akshar Business Park- Phase IiiAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
Swaraj OrchidM/S Crystal HomesSurvey No 25 Hissa No 230-12-2022 00:00:00
Surya ComplexM/S. Jai Santoshi Maa EnterprisesS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
19 EastMoreshwar Developers5230-12-2025 00:00:00
Reliance GoldGolden EnterprisesS No 58/1/4 S No 59/128-02-2028 00:00:00
Basera HeightsKamruddin Hasmullah SiddiqueOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Project Details
  • Project:
    Paradigm Anantaara
  • Location:
  • Fp No 526 Pt & 531
  • Const. Stage:
    New
  • Possession:
    31 Dec 2030
Developer Details

  • Developer:
    Shubhyuvi Infrastructure Llp
  • Phone:
  • Address:
  • Nivan
Project RERA Details
MAHA REARA No: P51800034854
Project Type Others
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2030
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 11 Oct 2023
Last Retrived 26 Jul 2025
Paradigm Anantaara QR Code
Paradigm Anantaara
MahaRERA - P51800034854
Apartment Details & Configuration
TypeArea
2 BHK63.17 Sq.mts. ( 680 Sq.ft. )
2 BHK68.93 Sq.mts. ( 742 Sq.ft. )
3 BHK96.99 Sq.mts. ( 1044 Sq.ft. )
3 BHK97.36 Sq.mts. ( 1048 Sq.ft. )
3 BHK108.05 Sq.mts. ( 1163 Sq.ft. )
3 BHK108.51 Sq.mts. ( 1168 Sq.ft. )
Shop164.83 Sq.mts. ( 1774 Sq.ft. )
Shop226.66 Sq.mts. ( 2440 Sq.ft. )
Shop82.34 Sq.mts. ( 886 Sq.ft. )
Shop91.58 Sq.mts. ( 986 Sq.ft. )
Shop25.33 Sq.mts. ( 273 Sq.ft. )
Shop45.26 Sq.mts. ( 487 Sq.ft. )
2 BHK69.21 Sq.mts. ( 745 Sq.ft. )
2 BHK64.38 Sq.mts. ( 693 Sq.ft. )
Proposed 2BHK116.97 Sq.mts. ( 1259 Sq.ft. )
Proposed 2BHK127 Sq.mts. ( 1367 Sq.ft. )
Proposed 2BHK130.62 Sq.mts. ( 1406 Sq.ft. )
Proposed 2BHK142.51 Sq.mts. ( 1534 Sq.ft. )
Proposed 3BHK195 Sq.mts. ( 2099 Sq.ft. )
Proposed 3BHK220.55 Sq.mts. ( 2374 Sq.ft. )
Proposed 2BHK42.55 Sq.mts. ( 458 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Paradigm Anantaaralast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
As Per Mcgm Requirement
Electrical Meter Room, Sub-Station, Receiving Station
As Per Local Supplier
Energy management
Led Provision Made
Fire Protection And Fire Safety Requirements
As Per Cfo
Landscaping & Tree Planting
Tree &Amp; Shrub
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Mcgm Connection
Solid Waste Management And Disposal
As Per Mcgm Requirement
Storm Water Drains
As Per Mcgm Requirement
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
As Per Mcgm Requirement
Water Conservation, Rain water Harvesting
As Per Mcgm Requirement
Water Supply
Mcgm
Buildings / Wings in Paradigm Anantaara
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Paradigm Anantaara by Shubhyuvi Infrastructure Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

55007 Sq. ft.

Project Area

4494 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

224 apartments in total
Total
224
Booked
0
Available
224

Saleable Area Statistics (Sq. ft.)

207802 Total
Total
207802
Booked
0
Available
207802
Total 224 apartments in project. 0 apartments booked. 0% apartments booked.
Total 207802 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Segment I Of Sale Building From Ground To 30Th Fl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Segment I Of Sale Building From Ground To 30Th FlDec 202732101100155
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK63.17 Sq.mts. ( 680 Sq.ft. )38
None Booked0% Booked
0% Booked
2 BHK68.93 Sq.mts. ( 742 Sq.ft. )38
None Booked0% Booked
0% Booked
3 BHK96.99 Sq.mts. ( 1044 Sq.ft. )17
None Booked0% Booked
0% Booked
3 BHK97.36 Sq.mts. ( 1048 Sq.ft. )17
None Booked0% Booked
0% Booked
3 BHK108.05 Sq.mts. ( 1163 Sq.ft. )19
None Booked0% Booked
0% Booked
3 BHK108.51 Sq.mts. ( 1168 Sq.ft. )19
None Booked0% Booked
0% Booked
Shop164.83 Sq.mts. ( 1774 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop226.66 Sq.mts. ( 2440 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop82.34 Sq.mts. ( 886 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop91.58 Sq.mts. ( 986 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.33 Sq.mts. ( 273 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop45.26 Sq.mts. ( 487 Sq.ft. )1
None Booked0% Booked
0% Booked
155 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Segment I Of Sale Building From Ground To 30Th FlCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Segment Ii Of Sale Building 31St To 40Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Segment Ii Of Sale Building 31St To 40Th FloorsDec 20283210110014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK69.21 Sq.mts. ( 745 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK64.38 Sq.mts. ( 693 Sq.ft. )4
None Booked0% Booked
0% Booked
3 BHK96.99 Sq.mts. ( 1044 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK97.36 Sq.mts. ( 1048 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK108.05 Sq.mts. ( 1163 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK108.51 Sq.mts. ( 1168 Sq.ft. )2
None Booked0% Booked
0% Booked
Proposed 2BHK64.38 Sq.mts. ( 693 Sq.ft. )12
None Booked0% Booked
0% Booked
Proposed 2BHK69.21 Sq.mts. ( 745 Sq.ft. )12
None Booked0% Booked
0% Booked
Proposed 2BHK116.97 Sq.mts. ( 1259 Sq.ft. )1
None Booked0% Booked
0% Booked
Proposed 2BHK127 Sq.mts. ( 1367 Sq.ft. )1
None Booked0% Booked
0% Booked
Proposed 2BHK130.62 Sq.mts. ( 1406 Sq.ft. )1
None Booked0% Booked
0% Booked
Proposed 2BHK142.51 Sq.mts. ( 1534 Sq.ft. )1
None Booked0% Booked
0% Booked
Proposed 3BHK195 Sq.mts. ( 2099 Sq.ft. )1
None Booked0% Booked
0% Booked
Proposed 3BHK220.55 Sq.mts. ( 2374 Sq.ft. )1
None Booked0% Booked
0% Booked
Proposed 3BHK108.51 Sq.mts. ( 1168 Sq.ft. )6
None Booked0% Booked
0% Booked
Proposed 3BHK108.05 Sq.mts. ( 1163 Sq.ft. )6
None Booked0% Booked
0% Booked
Proposed 3BHK97.36 Sq.mts. ( 1048 Sq.ft. )6
None Booked0% Booked
0% Booked
Proposed 3BHK96.99 Sq.mts. ( 1044 Sq.ft. )6
None Booked0% Booked
0% Booked
68 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Segment Ii Of Sale Building 31St To 40Th FloorsCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Segment Iii Of Sale Building 41St Floor And Above

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Segment Iii Of Sale Building 41St Floor And AboveDec 20303210110020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Proposed 2BHK42.55 Sq.mts. ( 458 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Segment Iii Of Sale Building 41St Floor And AboveCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shubhyuvi Infrastructure Llp
for Project
Paradigm Anantaara
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation