Project overview

Panvelkar Swarajya Phase-I is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000001562. Panvelkar Swarajya Phase-I is located at Survey No.22/2, 22/1C/1. This is a New being developed by Panvelkar Infrastructures Private Limited.

Panvelkar Swarajya Phase-I has 2 BHK Apartments with carpet areas ranging from 578 to 578 Sq.ft. Carpet. The Project has total 400 of which 400 are currently available for sale.

Panvelkar Swarajya Phase-I is being developed on a total land area of 136380 Sq.ft. out of which 13638 Sq.ft. i.e 10% is reserved for recreational purposes. Panvelkar Swarajya Phase-I has 7 Wings / Towers Building No 1,Building No 2,Building No 3,Building No 4,Building No 5,Building No 6,Bungalow

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Panvelkar Swarajya Phase-I
  • Location:
  • Survey No.22/2, 22/1C/1
  • Const. Stage:
    New
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Panvelkar Infrastructures Private Limited
  • Phone:
  • Address:
  • Nandi Commercial Complex
Project RERA Details
MAHA REARA No: P52000001562
Project Type Residential / Group Housing
RERA Project Status New
Architect Sameer Durve
Funding Bank STATE BANK OF INDIA
Proposed Possession 31 Dec 2019
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 28 Jul 2025
Panvelkar Swarajya Phase-I QR Code
Panvelkar Swarajya Phase-I
MahaRERA - P52000001562
Apartment Details & Configuration
TypeArea
1 BHK A25.02 Sq.mts. ( 269 Sq.ft. )
1 BHK B24.48 Sq.mts. ( 264 Sq.ft. )
1 RK A17.33 Sq.mts. ( 187 Sq.ft. )
1 RK B15.82 Sq.mts. ( 170 Sq.ft. )
1 RK C16.15 Sq.mts. ( 174 Sq.ft. )
2 BHK53.73 Sq.mts. ( 578 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Panvelkar Swarajya Phase-Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
For G+7 Building
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Rain Water Harvesting Only
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank Proposed
Solid Waste Management And Disposal
Na
Storm Water Drains
Stp Not Proposed
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply
0
Buildings / Wings in Panvelkar Swarajya Phase-I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Panvelkar Swarajya Phase-I by Panvelkar Infrastructures Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

136380 Sq. ft.

Project Area

13638 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

400 apartments in total
Total
400
Booked
0
Available
400

Saleable Area Statistics (Sq. ft.)

89681 Total
Total
89681
Booked
0
Available
89681
Total 400 apartments in project. 0 apartments booked. 0% apartments booked.
Total 89681 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Jan 1900810001500
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A25.02 Sq.mts. ( 269 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK B24.48 Sq.mts. ( 264 Sq.ft. )70
None Booked0% Booked
0% Booked
1 RK A17.33 Sq.mts. ( 187 Sq.ft. )2
None Booked0% Booked
0% Booked
75 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Dec 2019810001500
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A25.02 Sq.mts. ( 269 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK B24.48 Sq.mts. ( 264 Sq.ft. )70
None Booked0% Booked
0% Booked
1 RK A17.33 Sq.mts. ( 187 Sq.ft. )1
None Booked0% Booked
0% Booked
75 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Jan 1900810001500
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A25.02 Sq.mts. ( 269 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK B24.48 Sq.mts. ( 264 Sq.ft. )70
None Booked0% Booked
0% Booked
1 RK A17.33 Sq.mts. ( 187 Sq.ft. )2
None Booked0% Booked
0% Booked
75 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 3Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4Jan 1900510001160
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK B15.82 Sq.mts. ( 170 Sq.ft. )10
None Booked0% Booked
0% Booked
1 RK C16.15 Sq.mts. ( 174 Sq.ft. )48
None Booked0% Booked
0% Booked
58 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5Jan 1900510001160
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK B15.82 Sq.mts. ( 170 Sq.ft. )10
None Booked0% Booked
0% Booked
1 RK C16.15 Sq.mts. ( 174 Sq.ft. )48
None Booked0% Booked
0% Booked
58 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 6Jan 1900510001160
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK B15.82 Sq.mts. ( 170 Sq.ft. )10
None Booked0% Booked
0% Booked
1 RK C16.15 Sq.mts. ( 174 Sq.ft. )48
None Booked0% Booked
0% Booked
58 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 6Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Bungalow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
BungalowJan 19002100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.73 Sq.mts. ( 578 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building BungalowCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Panvelkar Infrastructures Private Limited
for Project
Panvelkar Swarajya Phase-I
last updated on 28 Jul 2025 as per information obtained from MARA RERA.