Project overview

Panvelkar Prestige Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700019429. Panvelkar Prestige Phase 2 is located at Morivali, Thane, 421503. This is a New Project being developed by Eshan Developers.

Panvelkar Prestige Phase 2 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 287 to 389 Sq.ft. Carpet. The Project has total 133 of which 33 are currently available for sale.

Panvelkar Prestige Phase 2 is being developed on a total land area of 42266 Sq.ft. Panvelkar Prestige Phase 2 has 3 Wings / Towers R1,R2,R3

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Panvelkar Prestige Phase 2
  • Location:
  • Morivali, Thane, 421503
  • Const. Stage:
    New Project
  • Possession:
    30 May 2023
Developer Details

  • Developer:
    Eshan Developers
  • Phone:
  • Address:
  • 1St Floor, Nandi Commerical Complex, Station Road, Shivdham, Shivdham, 421501
Project RERA Details
MAHA REARA No: P51700019429
Project Type Residential
RERA Project Status New Project
Funding Bank HDFC BANK
Proposed Possession 30 May 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 Jun 2023
Last Retrived 28 Jul 2025
Panvelkar Prestige Phase 2 QR Code
Panvelkar Prestige Phase 2
MahaRERA - P51700019429
Apartment Details & Configuration
TypeArea
1 BHK23.64 Sq.mts. ( 254 Sq.ft. )
1 BHK24.45 Sq.mts. ( 263 Sq.ft. )
1 BHK25.08 Sq.mts. ( 270 Sq.ft. )
1 BHK26.24 Sq.mts. ( 282 Sq.ft. )
1 BHK26.61 Sq.mts. ( 286 Sq.ft. )
1 BHK26.95 Sq.mts. ( 290 Sq.ft. )
1 BHK27.68 Sq.mts. ( 298 Sq.ft. )
1 BHK27.99 Sq.mts. ( 301 Sq.ft. )
1 BHK28.75 Sq.mts. ( 309 Sq.ft. )
1RK20.31 Sq.mts. ( 219 Sq.ft. )
2 BHK43.78 Sq.mts. ( 471 Sq.ft. )
SHOP6.19 Sq.mts. ( 67 Sq.ft. )
SHOP6.89 Sq.mts. ( 74 Sq.ft. )
SHOP7.43 Sq.mts. ( 80 Sq.ft. )
SHOP7.77 Sq.mts. ( 84 Sq.ft. )
SHOP8 Sq.mts. ( 86 Sq.ft. )
SHOP8.51 Sq.mts. ( 92 Sq.ft. )
SHOP8.8 Sq.mts. ( 95 Sq.ft. )
SHOP9.76 Sq.mts. ( 105 Sq.ft. )
SHOP12.1 Sq.mts. ( 130 Sq.ft. )
SHOP15.13 Sq.mts. ( 163 Sq.ft. )
SHOP16.88 Sq.mts. ( 182 Sq.ft. )
2 BHK35.85 Sq.mts. ( 386 Sq.ft. )
2 BHK36.11 Sq.mts. ( 389 Sq.ft. )
2 BHK37.08 Sq.mts. ( 399 Sq.ft. )
SHOP5.49 Sq.mts. ( 59 Sq.ft. )
SHOP6.42 Sq.mts. ( 69 Sq.ft. )
SHOP6.73 Sq.mts. ( 72 Sq.ft. )
SHOP8.44 Sq.mts. ( 91 Sq.ft. )
SHOP12.7 Sq.mts. ( 137 Sq.ft. )
1 BHK26.63 Sq.mts. ( 287 Sq.ft. )
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )
1 BHK28.36 Sq.mts. ( 305 Sq.ft. )
1 BHK28.95 Sq.mts. ( 312 Sq.ft. )
1 BHK29.25 Sq.mts. ( 315 Sq.ft. )
1 BHK30.05 Sq.mts. ( 323 Sq.ft. )
2 BHK33.21 Sq.mts. ( 357 Sq.ft. )
2 BHK36.1 Sq.mts. ( 389 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Panvelkar Prestige Phase 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Na
Energy management
Solar Energy At Time Of Completion
Fire Protection And Fire Safety Requirements
In Progress. Before Completion
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
At Time Of Completion
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
In Progress
Buildings / Wings in Panvelkar Prestige Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Panvelkar Prestige Phase 2 by Eshan Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

42266 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

133 apartments in total
Total
133
Booked
100
Available
33

Saleable Area Statistics (Sq. ft.)

37112 Total
Total
37112
Booked
28687
Available
8426
Total 133 apartments in project. 100 apartments booked. 75% apartments booked.
Total 37112 Sq.ft. saleable area. 28687 saleable area booked.
77% area booked.

R1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R1May 20228100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.64 Sq.mts. ( 254 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK24.45 Sq.mts. ( 263 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK25.08 Sq.mts. ( 270 Sq.ft. )8
4 Booked50% Booked
50% Booked
1 BHK26.24 Sq.mts. ( 282 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK26.61 Sq.mts. ( 286 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK26.95 Sq.mts. ( 290 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK27.68 Sq.mts. ( 298 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK27.99 Sq.mts. ( 301 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK28.75 Sq.mts. ( 309 Sq.ft. )7
6 Booked85% Booked
85% Booked
1RK20.31 Sq.mts. ( 219 Sq.ft. )8
7 Booked87% Booked
87% Booked
2 BHK43.78 Sq.mts. ( 471 Sq.ft. )7
6 Booked85% Booked
85% Booked
SHOP6.19 Sq.mts. ( 67 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP6.89 Sq.mts. ( 74 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP7.43 Sq.mts. ( 80 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP7.77 Sq.mts. ( 84 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP8 Sq.mts. ( 86 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP8.51 Sq.mts. ( 92 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP8.8 Sq.mts. ( 95 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP9.76 Sq.mts. ( 105 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP12.1 Sq.mts. ( 130 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.13 Sq.mts. ( 163 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP16.88 Sq.mts. ( 182 Sq.ft. )1
1 Booked100% Booked
100% Booked
86 total apartments / 72 apartments booked. 83% apartments booked.
Work Description in Building R1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

R2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R2May 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK35.85 Sq.mts. ( 386 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK36.11 Sq.mts. ( 389 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK37.08 Sq.mts. ( 399 Sq.ft. )4
3 Booked75% Booked
75% Booked
SHOP5.49 Sq.mts. ( 59 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP6.42 Sq.mts. ( 69 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP6.73 Sq.mts. ( 72 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP8.44 Sq.mts. ( 91 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP12.7 Sq.mts. ( 137 Sq.ft. )3
None Booked0% Booked
0% Booked
19 total apartments / 8 apartments booked. 42% apartments booked.
Work Description in Building R2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress69% done
69% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

R3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R3May 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.63 Sq.mts. ( 287 Sq.ft. )8
4 Booked50% Booked
50% Booked
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK28.36 Sq.mts. ( 305 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK28.95 Sq.mts. ( 312 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK29.25 Sq.mts. ( 315 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK30.05 Sq.mts. ( 323 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK33.21 Sq.mts. ( 357 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK36.1 Sq.mts. ( 389 Sq.ft. )1
1 Booked100% Booked
100% Booked
28 total apartments / 20 apartments booked. 71% apartments booked.
Work Description in Building R3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress69% done
69% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Eshan Developers
for Project
Panvelkar Prestige Phase 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation