Project overview

Panvelkar Estate - Rockford is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000431. Panvelkar Estate - Rockford is located at Survey No 43 Survey No 44 Hissa No 2 Survey No 44 Hissa No 3. This is a Ongoing being developed by Vijay Ramchandra Panvelkar.

Panvelkar Estate - Rockford has Shops Apartments with carpet areas ranging from 5658 to 5658 Sq.ft. Carpet. The Project has total 199 of which 10 are currently available for sale.

Panvelkar Estate - Rockford is being developed on a total land area of 66952 Sq.ft. out of which 5281 Sq.ft. i.e 8% is reserved for recreational purposes. Panvelkar Estate - Rockford has 3 Wings / Towers Building No 1,Building No 2,Building No 3

ProjectDeveloperLocationPossession
Ved HeightsOm RealityS.No. 96, H. No. 231-12-2026 00:00:00
Ram RiveraS No 29/A/3 Plot No 13 And 1430-09-2025 00:00:00
Park One Phase IiShree Laxmi EnterprisesSurvey No. 125, H.No. 1/A31-12-2027 00:00:00
Vedant VastuVedant VentureSurvey No. 63, Hissa No. 4A8, Plot No. 831-12-2018 00:00:00
Panvelkar Estate - RockfordVijay Ramchandra PanvelkarSurvey No 43 Survey No 44 Hissa No 2 Survey No 44 Hissa No 331-12-2019 00:00:00
Satyam SheelaShree Satyam GroupSno 73-1B And 72-430-12-2022 00:00:00
Pg VatikaGurukrupa EnterprisesSurvey No 45 Hissa No 1 And 2 Village Mankivali, Badlapur East Ambernath Thane 42150331-12-2026 00:00:00
Saishyam ArcadeShubh BuildspaceSurvey No 20, Hissa No 2,431-12-2025 00:00:00
Surval HeightsGayatri DevelopersSurvey No 46 H No 11/12 And S No 83 H No 7/831-12-2023 00:00:00
Sarveshwar Co-Op Hsg SocDalal BuildscapeTaluka Ambernath30-06-2024 00:00:00
Panvelkar Estate - Stanford - Phase Ii - R1 - BPanvelkar Infrastructures Private LimitedSurvey No 42 Hissa No 131-12-2024 00:00:00
Sai ResidencySai Raj DevelopersSr No 32/2/1 32/2/2 32/2/330-12-2021 00:00:00
Panvelkar Estate - Stanford - Phase-IiPanvelkar Infrastructures Private LimitedSurvey No 42 H No 125-05-2022 00:00:00
Padmaprabha Co Op Hsg SocietyShree Mahaveer EnterprisesSurvey No 46 Plot No 23 24 H No 6A9 6A10 P30-04-2018 00:00:00
Marathon Nagari Nx Vigo DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.30-06-2019 00:00:00
Marathon Nagari Nx Vitoria DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.31-12-2019 00:00:00
Jijabai ParkDnyaneshwar Mauli Builder & Developers83/1031-12-2018 00:00:00
Prachi ResidencyPrachi DevelopersS No 42 H No 1A Plot 4 And S No 42 H No 230-12-2024 00:00:00
Shree Viraj Residency Wing C Phase -IiShree Viraj EnterprisesSurvey No 63 H No 5A Plot No 1 To 7, Survey No 63 H No 630-12-2022 00:00:00
Aryan One Wing G And HKonark Lifespaces70/1,70/2,71/1,75/1 ,75/2,75/3,75/5,75/6,76/1,76/2,76/3,77,78/3,79/9,79/1031-07-2018 00:00:00
Uma Ashish B WingParasiya DevelopesS No 5 H No 17 And 1831-07-2018 00:00:00
Tulsi AawasRaj GroupS No-38 H No-4,5,631-12-2024 00:00:00
Shivshakti OasisShivshakti Genesis71/531-12-2026 00:00:00
Satyam Sheela Wing FShreeji DevelopersSurvey No 72/4 And Survey No 73/1/B, Shirgaon,Badlapur-42150331-07-2026 00:00:00
Om Yashwant PlazaOmprakash Ramchandra PandeyS.No.97B, H.No.131-12-2018 00:00:00
Dhruvika EnclaveManoyadnya Developers3/69/7/1/D30-09-2020 00:00:00
Kalp NisargBls Ventures81/3A 3B30-03-2022 00:00:00
Parijatak Phase I A And B WingVarad BuildersSno.44/1/A/2 Sno.46H No.6/A/8 Plot 22 Sno 46 Hno.6/A/9 Plot No 23Sno 46 H No 6/A/10 Plot No 2430-06-2025 00:00:00
Kartik HomesKartik EnterprisesS No 74 H No 2 S No 74 H No 331-12-2024 00:00:00
Aryan One Wing I And JKonark Lifespaces701,702,711,751,752,753,755,761,762,763,77,783,799,791031-10-2018 00:00:00
Pathak ResidencyShree Mahalaxmi ConstructionsS No 82 1 A 1B30-12-2023 00:00:00
Sharmila ResidencyAnnapurna Enterprises46, Hissa No 331-03-2025 00:00:00
Panvelkar Estate - Greenford - E WingPanvelkar Infrastructures Private LimitedSurvey No 42 Hissa No 2 And 331-12-2025 00:00:00
Audumbar DarshanAudumbar EnterprisesSurvey No 55 H No 3/A/10 Plot No 231-01-2024 00:00:00
Project Details
  • Project:
    Panvelkar Estate - Rockford
  • Location:
  • Survey No 43 Survey No 44 Hissa No 2 Survey No 44 Hissa No 3
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Vijay Ramchandra Panvelkar
  • Phone:
  • Address:
  • Ramsmruti
Project RERA Details
MAHA REARA No: P51700000431
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Sunil Bhagwat Architects
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 17 Jul 2017
Last Retrived 26 Jul 2025
Panvelkar Estate - Rockford QR Code
Panvelkar Estate - Rockford
MahaRERA - P51700000431
Apartment Details & Configuration
TypeArea
1RK16.88 Sq.mts. ( 182 Sq.ft. )
1RK17.55 Sq.mts. ( 189 Sq.ft. )
1RK17.65 Sq.mts. ( 190 Sq.ft. )
1RK17.88 Sq.mts. ( 192 Sq.ft. )
1RK18.33 Sq.mts. ( 197 Sq.ft. )
1RK19.4 Sq.mts. ( 209 Sq.ft. )
1RK20.21 Sq.mts. ( 218 Sq.ft. )
1 BHK28.06 Sq.mts. ( 302 Sq.ft. )
1 BHK29.23 Sq.mts. ( 315 Sq.ft. )
1 BHK29.53 Sq.mts. ( 318 Sq.ft. )
1 BHK39.61 Sq.mts. ( 426 Sq.ft. )
2 BHK48.97 Sq.mts. ( 527 Sq.ft. )
2 BHK49.34 Sq.mts. ( 531 Sq.ft. )
2 BHK50.24 Sq.mts. ( 541 Sq.ft. )
Shop35.01 Sq.mts. ( 377 Sq.ft. )
Shop18.59 Sq.mts. ( 200 Sq.ft. )
Shop19.12 Sq.mts. ( 206 Sq.ft. )
Shop23.1 Sq.mts. ( 249 Sq.ft. )
Shop23.9 Sq.mts. ( 257 Sq.ft. )
Shop24.91 Sq.mts. ( 268 Sq.ft. )
Shop25.28 Sq.mts. ( 272 Sq.ft. )
Shops525.6 Sq.mts. ( 5658 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Panvelkar Estate - Rockfordlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Electric Meter Room Proposed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Septic Tank Proposed Stp Not Proposed
Solid Waste Management And Disposal
Na
Storm Water Drains60% completed
60% Complete
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rwh Done
Water Supply
Na
Buildings / Wings in Panvelkar Estate - Rockford
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Panvelkar Estate - Rockford by Vijay Ramchandra Panvelkarlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

66952 Sq. ft.

Project Area

5281 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

199 apartments in total
Total
199
Booked
189
Available
10

Saleable Area Statistics (Sq. ft.)

70538 Total
Total
70538
Booked
51178
Available
19360
Total 199 apartments in project. 189 apartments booked. 94% apartments booked.
Total 70538 Sq.ft. saleable area. 51178 saleable area booked.
73% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Dec 2019810101431
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK16.88 Sq.mts. ( 182 Sq.ft. )8
8 Booked100% Booked
100% Booked
1RK17.55 Sq.mts. ( 189 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK17.65 Sq.mts. ( 190 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK17.88 Sq.mts. ( 192 Sq.ft. )84
83 Booked98% Booked
98% Booked
1RK18.33 Sq.mts. ( 197 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK19.4 Sq.mts. ( 209 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK20.21 Sq.mts. ( 218 Sq.ft. )7
7 Booked100% Booked
100% Booked
115 total apartments / 114 apartments booked. 99% apartments booked.
Work Description in Building Building No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Dec 201981010841
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.06 Sq.mts. ( 302 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK29.23 Sq.mts. ( 315 Sq.ft. )38
38 Booked100% Booked
100% Booked
1 BHK29.53 Sq.mts. ( 318 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK39.61 Sq.mts. ( 426 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK48.97 Sq.mts. ( 527 Sq.ft. )13
12 Booked92% Booked
92% Booked
2 BHK49.34 Sq.mts. ( 531 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK50.24 Sq.mts. ( 541 Sq.ft. )14
13 Booked92% Booked
92% Booked
Shop35.01 Sq.mts. ( 377 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.59 Sq.mts. ( 200 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.12 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.1 Sq.mts. ( 249 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.9 Sq.mts. ( 257 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop24.91 Sq.mts. ( 268 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.28 Sq.mts. ( 272 Sq.ft. )2
None Booked0% Booked
0% Booked
81 total apartments / 75 apartments booked. 92% apartments booked.
Work Description in Building Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Jan 19003101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shops525.6 Sq.mts. ( 5658 Sq.ft. )3
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Vijay Ramchandra Panvelkar
for Project
Panvelkar Estate - Rockford
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation