Project overview

Panvelkar Estate - Oxford - Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700018929. Panvelkar Estate - Oxford - Phase 1 is located at Gut No.45/2,46/2,47,49/4,49/9,49/11,49/12. This is a New being developed by Panvelkar Infrastructures Private Limited.

Panvelkar Estate - Oxford - Phase 1 has 1RK Apartments with carpet areas ranging from 197 to 203 Sq.ft. Carpet. The Project has total 901 of which 608 are currently available for sale.

Panvelkar Estate - Oxford - Phase 1 is being developed on a total land area of 372115 Sq.ft. out of which 31555 Sq.ft. i.e 8% is reserved for recreational purposes. Panvelkar Estate - Oxford - Phase 1 has 4 Wings / Towers Bldg No 1,Bldg No 2,Bldg No 3,Bldg No 4

ProjectDeveloperLocationPossession
Paramount BKalpataru Homes Private LimitedS.No. 114/8-Part,114/4-Part30-06-2025 00:00:00
Rental Building A-1 R2Sonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
The EmpressUnique Shanti Developers LlpOld S.No.479/230-03-2023 00:00:00
Lotus ParkReal Enterprise842-A, Plot No. 02,0330-12-2022 00:00:00
Raviraj ApartmentRajendra GhorpadeS.No 85,H. No 11, Plot No 930-12-2022 00:00:00
Krupa SindhuAshish Waman GoleS No 48 H No 8/428-11-2021 00:00:00
Arvind GalaxySanchit EnterprisesTika No 16 Cts No 7830-12-2023 00:00:00
Shree Sai Pooja ApartmentOm Sai RealtyS No 29/A H No 19 Plot No 8730-09-2019 00:00:00
Mauli MadhusudhanRameshwar Patil42160530-03-2023 00:00:00
Salangpur NirmanSalangpur Nirman252 6,7 Part30-12-2022 00:00:00
NandigramYogesh Kishor MahajanTikka No 5, 62A/131-03-2025 00:00:00
Windermere Building No 1 To 6A G Superstructures Pvt LtdNew S. No./Old S. No./ H.No. 221/564/1,3,4A,4B,8. New S. No/Old S. No/ H.No/220/565/1,4,6,7,8,9,10. New S. No/Old S. No/H.No/267/567/1,2/1. New S. No/Old S. No/245/579/1A,1B,2,3A,3B,3C,4,5,6,731-12-2027 00:00:00
Golden Hills B- 3Vihang Enterprises921,923,9241,9243,928130-12-2024 00:00:00
Classic ResidencyClassic ConstructionThane30-06-2021 00:00:00
Sarvodaya ClassicEkta BuildersSurvey No. 28 H.No 530-03-2026 00:00:00
M K Thakur Complex Phase 1Vraj Ratan Buildcon Pvt LtdSurvey No 77 1A 2 4 501-12-2021 00:00:00
Silver ArcadeSiddhivinayak Enterprises5831-12-2018 00:00:00
Orion Business ParkNeminath EnterprisesGut No 33 Pt31-03-2019 00:00:00
Keyur Co-Operative Housing Society LtdDhanashree DevelopersKansai31-12-2025 00:00:00
Suyog ApartmentTelange Builders & Developers Private Limited4693 To 469930-03-2025 00:00:00
Prabhat DarshanYashomalhar Construction7015A/1A30-06-2023 00:00:00
Ten X Era Raymond Realty Tower CRaymond Limited121 Pt 83/3 83/130-01-2029 00:00:00
Guru Ganesh ChsVadnere Builder & DevelopersSurvey No 13 Hissa No 6(A) Plot No 2631-12-2025 00:00:00
Mangeshi NeptuneMangesh GaikarThane31-12-2027 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private Limited1411, 2, 3, 144, 1451, 2, 4, 1462, 3, 4, 1481, 1421, 1483130-12-2023 00:00:00
Highland Springs B4- A WingSiddhi Real Estate Developers74/5Apart30-06-2023 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private Limited67/2/P, 67/3A, Sub Plot B30-12-2023 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedGut No 42/131-12-2018 00:00:00
Jai MatadeeAaradhana Developers37531-03-2018 00:00:00
Om Yashodhan ChslSilver Stone RealtyTika No 16, Cts No 10005-11-2026 00:00:00
Embassy One ThaneTapir Constructions Limited53/1,55/1,2,3,70/2A,70/1(Pt.),70/4(Pt.),70/6(Pt.),70/7(Pt.),70/8(Pt.),70/9B,71/231-12-2030 00:00:00
Green Square- Phase Ii Tower 1 And 3Squarefeet Enterprises166/3131-12-2030 00:00:00
Shri Laxmi Nivas Co Op Hsg Soc LtdOjass Govind Infra LlpCts 46/C/1 Tika No 1531-12-2027 00:00:00
Payal PrideMit Enterprises10430-03-2022 00:00:00
Panvelkar Estate - GreenfordPanvelkar Infrastructures Private LimitedSurvey No. 42 Hissa No 2 And 330-12-2022 00:00:00
Plot 1 Sector 10 GhansoliCidco Of Maharashtra Ltd.Plot No 130-06-2021 00:00:00
One Indiabulls Thane - 1Tapir Constructions Limited71/1/A/1/1, 71/229-08-2024 00:00:00
Lodha Amara - Tower 26, 27, 28, 30, 34, 35Macrotech Developers Limited64/3,64/7,65/2,65/3,65/4,65/5, 68/3,68/4,68/5,69/2,69/6,70/1,70/2,70/3,70/430-12-2021 00:00:00
Kashi Darshan B WingVarad Raj Construction98/1920-12-2023 00:00:00
Saroj Sadan Chs LtdShrusti DevelopersThane19-01-2026 00:00:00
Narang Privado - BNarang Realty Private Limited146/5/B And 146/6/B/131-03-2028 00:00:00
Shivsai ParadiseBharat Agri Fert & Realty Realty Ltd112/2A,3,4,5/1,5/2,5/330-12-2028 00:00:00
RubaShreyas Enterprises112/5/430-09-2020 00:00:00
OrchidMehta RealtorsS No 378/131-03-2019 00:00:00
AvesaJagdale Infrastructure Pvt. Ltd.50602-10-2026 00:00:00
Teri KudratVishnu Jethanand BadlaniPlot No 433, Sheet No 48, Cts No 2578331-10-2024 00:00:00
Kanha ResidencyKulkarnii Builder105A/4/2/3/4/5/4114-05-2025 00:00:00
Sarthi ElanzaSarthi DevelopersS No-264/58 Plot No-5531-10-2023 00:00:00
Bsc It ParkBansal Steel CorporationA21601-06-2024 00:00:00
Runwal Lands EndRunwal Construction Private Limited20/3 Part30-06-2029 00:00:00
Paramount EKalpataru Homes Private LimitedS.No. 115/10/2-Part And 115/8/2-Part Of Village Majiwada30-06-2025 00:00:00
Madhu VillaShree Krishna EnterprisesSurvey No. 18 / House No. 2230-12-2022 00:00:00
Shapoorji Pallonji The Impulse- Phase 1Jaykali Developers Private LimitedS. No.509, 510P30-06-2024 00:00:00
Cosmos Horizon Phase IiConcorde Developers192/2A30-03-2024 00:00:00
Simone ResidencyM R M DevelopersDaighar Village30-12-2022 00:00:00
Delta WoodsDelta Venture1883Pt30-09-2023 00:00:00
Shreeji LandmarkVinayak DevelopersSurvey No 46 Hissa No 5-130-12-2029 00:00:00
Hyde Park Residency F4 Building PhaseNexus Builders And Developers Pvt Ltd47/1/2, 47/1/3, 47/1/4, 47/1/5, 47/1/7, 47/1/9, 47/1/1030-12-2021 00:00:00
Bhagwan Krishna NiwasQuick Developers27/1201-07-2024 00:00:00
ZenithRunwal Developers Private LimitedSurvey No 51 Hissa No 1 To 15 Survey No 52 Hissa No 1 To 3 Survey No 5330-09-2028 00:00:00
Urban Nest Bldg - 1Cllaro Enterprises Llp127-1A31-12-2024 00:00:00
Saket ImperialNirmaan Realty9570,957107-08-2025 00:00:00
Maruti Square Building No 7Maruti Dwellers Private LimitedNew Survey Nos 63 66 And 69 Pt31-12-2027 00:00:00
Paramount FKalpataru Homes Private LimitedSno 115/4/2 Pt 115/5 Pt 115/6 Pt 115/7/2 Pt 115/8/2 Pt 115/10/2 Pt Of Village Majiwade30-09-2024 00:00:00
Green SquareSquarefeet Enterprises166/3131-12-2027 00:00:00
Larkins NestPride Property Developers68/13/3F And 68/13/3G31-12-2025 00:00:00
Shanti LegacyAnmol InfraOld S. No. 368, New S. No. 7031-03-2025 00:00:00
Trinity MokshRattanraj LifespacesS No 64 1 And 64 231-03-2025 00:00:00
Ganesh BhuvanMagnum Homes66830-09-2024 00:00:00
Audumber Flower ValleyAudumber SuperstructuresS No 5/4/D 5/4/B 5/23/B30-06-2025 00:00:00
Highland Park Building 2- K25 Wing A Phase 2Siddhi Gaurav EnterprisesS. N. 87/2 And 82/630-12-2024 00:00:00
Falco CheshireAanya RealtorsThane, 42110231-10-2016 00:00:00
Highland Springs B4- C WingSiddhi Real Estate Developers74/5A 59/1A 59/1B 46/1830-12-2023 00:00:00
Spm Dream City Phase 1D K BuildconS No 52 H No 4/531-12-2028 00:00:00
Paramount CKalpataru Homes Private LimitedSno 115/5Pt 115/9Pt 115/12Pt,115/13Pt Of Village Majiwade 212/1Pt Of Village Balkum30-06-2025 00:00:00
My City Phase Ii Cluster 5 Part IiHorizon Projects Pvt Ltd108/1 And 93 Part31-12-2027 00:00:00
Nirman SignatureShree Sha DevelopersSuevey No.180 Hissa No.3/231-03-2026 00:00:00
Hcs HorizonHcs Realtors LlpOld Survey No 271 New Survey No 82 Hissa No 1131-12-2026 00:00:00
Maplewoods Phase 1M/S Bks Galaxy Realtors Llp51(2) 56 And 57(2)31-12-2028 00:00:00
The Icon Phase 1Leading Frontier Private LimitedSurvey No 60/18,60/19,Survey No 61/2A To 61/2F, 61/3,62/3,62/5E,62/6,62/7,62/9C30-12-2022 00:00:00
Vardhman Garden Phase IiDiwali Construction CompanyThane31-12-2022 00:00:00
Vardhman VatikaDiwali DevelopersSurvey No 21 Part And 22 Part31-12-2019 00:00:00
Panvelkar Estate - Oxford - Phase 1Panvelkar Infrastructures Private LimitedGut No.45/2,46/2,47,49/4,49/9,49/11,49/1230-12-2023 00:00:00
Krishna - B WingNeelkanth Palm Realty149/4/1 Pt, 412/2 Pt30-05-2022 00:00:00
Indraprasth Wing CSonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
Project Details
  • Project:
    Panvelkar Estate - Oxford - Phase 1
  • Location:
  • Gut No.45/2,46/2,47,49/4,49/9,49/11,49/12
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Panvelkar Infrastructures Private Limited
  • Phone:
  • Address:
  • Nandi Commercial Complex
Project RERA Details
MAHA REARA No: P51700018929
Project Type Residential / Group Housing
RERA Project Status New
Architect Sameer Durve
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Nov 2023
Last Retrived 26 Jul 2025
Panvelkar Estate - Oxford - Phase 1 QR Code
Panvelkar Estate - Oxford - Phase 1
MahaRERA - P51700018929
Apartment Details & Configuration
TypeArea
3 BHK59.98 Sq.mts. ( 646 Sq.ft. )
2 BHK46.47 Sq.mts. ( 500 Sq.ft. )
1 BHK28.6 Sq.mts. ( 308 Sq.ft. )
1RK18.19 Sq.mts. ( 196 Sq.ft. )
1RK18.86 Sq.mts. ( 203 Sq.ft. )
1RK18.26 Sq.mts. ( 197 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Panvelkar Estate - Oxford - Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Complete
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Meter Room.
Energy management100% completed
95% Complete
Solar Panel Installation Complete
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Complete
Landscaping & Tree Planting100% completed
95% Complete
As Per Approval.
Open Parking100% completed
95% Complete
Complete
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp
Solid Waste Management And Disposal100% completed
95% Complete
Owc Provided.
Storm Water Drains100% completed
95% Complete
Complete
Street Lighting100% completed
95% Complete
Complete
Swimmimg Pool
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting.
Water Supply
M.J.P. Will Provide Water Supply After C.C.
Buildings / Wings in Panvelkar Estate - Oxford - Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Panvelkar Estate - Oxford - Phase 1 by Panvelkar Infrastructures Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

372115 Sq. ft.

Project Area

31555 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

901 apartments in total
Total
901
Booked
293
Available
608

Saleable Area Statistics (Sq. ft.)

267611 Total
Total
267611
Booked
86589
Available
181022
Total 901 apartments in project. 293 apartments booked. 32% apartments booked.
Total 267611 Sq.ft. saleable area. 86589 saleable area booked.
32% area booked.

Bldg No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 1Dec 202315101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK59.98 Sq.mts. ( 646 Sq.ft. )43
None Booked0% Booked
0% Booked
43 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 1Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bldg No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 2Dec 202315101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.47 Sq.mts. ( 500 Sq.ft. )118
61 Booked51% Booked
51% Booked
118 total apartments / 61 apartments booked. 51% apartments booked.
Work Description in Building Bldg No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Bldg No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 3Dec 202316101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.6 Sq.mts. ( 308 Sq.ft. )298
88 Booked29% Booked
29% Booked
1RK18.19 Sq.mts. ( 196 Sq.ft. )32
1RK18.86 Sq.mts. ( 203 Sq.ft. )96
426 total apartments / 93 apartments booked. 21% apartments booked.
Work Description in Building Bldg No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Bldg No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 4Dec 202316101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK18.26 Sq.mts. ( 197 Sq.ft. )64
35 Booked54% Booked
54% Booked
1RK18.86 Sq.mts. ( 203 Sq.ft. )250
104 Booked41% Booked
41% Booked
314 total apartments / 139 apartments booked. 44% apartments booked.
Work Description in Building Bldg No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Panvelkar Infrastructures Private Limited
for Project
Panvelkar Estate - Oxford - Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation