Project overview

Pant Nagar Shri Ram C.H.S. Ltd. Building No.105 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800011326. Pant Nagar Shri Ram C.H.S. Ltd. Building No.105 is located at 400075, Mumbai Suburban. This is a On-Going Project being developed by Dev Reality Corporation.

Pant Nagar Shri Ram C.H.S. Ltd. Building No.105 has FLAT, OFFICE, SHOP & TERRACE Apartments with carpet areas ranging from 150 to 915 Sq.ft. Carpet. The Project has total 54 of which 8 are currently available for sale.

Pant Nagar Shri Ram C.H.S. Ltd. Building No.105 is being developed on a total land area of 12248 Sq.ft. Pant Nagar Shri Ram C.H.S. Ltd. Building No.105 has 2 Wings / Towers Pant Nagar Shri Ram Chs Ltd Bldg 105 8 To 12 Floo,Pant Nagar Shri Ram Chs Ltd Bldg No 105 Ground To

ProjectDeveloperLocationPossession
Vinayak Heights Phase 1 Vinayak Associate194A Part Ghatkoper And Cts 1B Part Of Village Vikroli Taluka Kurla Mumbai25-12-2020 00:00:00
Bhaveshwar Arcade AnnexeBhaveshwar Properties Pvt Ltd4045A-1C, 4045A-1B, 4045A-1A30-11-2018 00:00:00
Elanza HospitalAcme Complex Pvt Ltd1900 To 191730-06-2021 00:00:00
Project Details
  • Project:
    Pant Nagar Shri Ram C.H.S. Ltd. Building No.105
  • Location:
  • 400075, Mumbai Suburban
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2011
Developer Details

  • Developer:
    Dev Reality Corporation
  • Phone:
  • Address:
  • Shop No.1,, Sahakar Apartment, Plot No.208,, Hingwala Cross Lane,, Near Dena Bank, Lane Opp. Popular Hotel,, Ghatkopar (East),, 400077
Project RERA Details
MAHA REARA No: P51800011326
Project Type Others
RERA Project Status On-Going Project
Funding Bank TJSB SAHAKARI BANK LTD
Proposed Possession 31 Dec 2011
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 30 Jul 2017
Last Retrived 28 Jul 2025
Pant Nagar Shri Ram C.H.S. Ltd. Building No.105 QR Code
Pant Nagar Shri Ram C.H.S. Ltd. Building No.105
MahaRERA - P51800011326
Apartment Details & Configuration
TypeArea
FLAT35.43 Sq.mts. ( 381 Sq.ft. )
FLAT36.6 Sq.mts. ( 394 Sq.ft. )
FLAT41.43 Sq.mts. ( 446 Sq.ft. )
FLAT42.27 Sq.mts. ( 455 Sq.ft. )
FLAT42.64 Sq.mts. ( 459 Sq.ft. )
FLAT43.39 Sq.mts. ( 467 Sq.ft. )
FLAT60.54 Sq.mts. ( 652 Sq.ft. )
FLAT62.06 Sq.mts. ( 668 Sq.ft. )
FLAT65.3 Sq.mts. ( 703 Sq.ft. )
FLAT56.95 Sq.mts. ( 613 Sq.ft. )
FLAT39.11 Sq.mts. ( 421 Sq.ft. )
FLAT52.81 Sq.mts. ( 568 Sq.ft. )
OFFICE50.54 Sq.mts. ( 544 Sq.ft. )
OFFICE40.88 Sq.mts. ( 440 Sq.ft. )
OFFICE13.94 Sq.mts. ( 150 Sq.ft. )
OFFICE16.72 Sq.mts. ( 180 Sq.ft. )
OFFICE19.04 Sq.mts. ( 205 Sq.ft. )
OFFICE21.37 Sq.mts. ( 230 Sq.ft. )
OFFICE21.65 Sq.mts. ( 233 Sq.ft. )
OFFICE25.08 Sq.mts. ( 270 Sq.ft. )
OFFICE26.29 Sq.mts. ( 283 Sq.ft. )
OFFICE35.3 Sq.mts. ( 380 Sq.ft. )
OFFICE37.44 Sq.mts. ( 403 Sq.ft. )
SHOP40.51 Sq.mts. ( 436 Sq.ft. )
SHOP52.68 Sq.mts. ( 567 Sq.ft. )
TERRACE54.04 Sq.mts. ( 582 Sq.ft. )
TERRACE47.57 Sq.mts. ( 512 Sq.ft. )
TERRACE15.23 Sq.mts. ( 164 Sq.ft. )
TERRACE85 Sq.mts. ( 915 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pant Nagar Shri Ram C.H.S. Ltd. Building No.105last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Yet Started
Landscaping & Tree Planting
Na
Open Parking
Work In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Mcgm
Solid Waste Management And Disposal100% completed
95% Complete
Mcgm
Storm Water Drains100% completed
95% Complete
Mcgm
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Yet Started
Water Supply100% completed
95% Complete
Mcgm
Buildings / Wings in Pant Nagar Shri Ram C.H.S. Ltd. Building No.105
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pant Nagar Shri Ram C.H.S. Ltd. Building No.105 by Dev Reality Corporationlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

12248 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

54 apartments in total
Total
54
Booked
46
Available
8

Saleable Area Statistics (Sq. ft.)

23981 Total
Total
23981
Booked
19773
Available
4208
Total 54 apartments in project. 46 apartments booked. 85% apartments booked.
Total 23981 Sq.ft. saleable area. 19773 saleable area booked.
82% area booked.

Pant Nagar Shri Ram Chs Ltd Bldg 105 8 To 12 Floo

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pant Nagar Shri Ram Chs Ltd Bldg 105 8 To 12 FlooJan 19005000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT35.43 Sq.mts. ( 381 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT36.6 Sq.mts. ( 394 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT41.43 Sq.mts. ( 446 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT42.27 Sq.mts. ( 455 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT42.64 Sq.mts. ( 459 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT43.39 Sq.mts. ( 467 Sq.ft. )9
3 Booked33% Booked
33% Booked
FLAT60.54 Sq.mts. ( 652 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT62.06 Sq.mts. ( 668 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT65.3 Sq.mts. ( 703 Sq.ft. )6
4 Booked66% Booked
66% Booked
26 total apartments / 18 apartments booked. 69% apartments booked.
Work Description in Building Pant Nagar Shri Ram Chs Ltd Bldg 105 8 To 12 FlooCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Pant Nagar Shri Ram Chs Ltd Bldg No 105 Ground To

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pant Nagar Shri Ram Chs Ltd Bldg No 105 Ground ToJan 19008101031
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT56.95 Sq.mts. ( 613 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT39.11 Sq.mts. ( 421 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT52.81 Sq.mts. ( 568 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE50.54 Sq.mts. ( 544 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE40.88 Sq.mts. ( 440 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE13.94 Sq.mts. ( 150 Sq.ft. )2
2 Booked100% Booked
100% Booked
OFFICE16.72 Sq.mts. ( 180 Sq.ft. )2
2 Booked100% Booked
100% Booked
OFFICE19.04 Sq.mts. ( 205 Sq.ft. )6
6 Booked100% Booked
100% Booked
OFFICE21.37 Sq.mts. ( 230 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE21.65 Sq.mts. ( 233 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE25.08 Sq.mts. ( 270 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE26.29 Sq.mts. ( 283 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE35.3 Sq.mts. ( 380 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE37.44 Sq.mts. ( 403 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP40.51 Sq.mts. ( 436 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP52.68 Sq.mts. ( 567 Sq.ft. )1
1 Booked100% Booked
100% Booked
TERRACE54.04 Sq.mts. ( 582 Sq.ft. )1
1 Booked100% Booked
100% Booked
TERRACE47.57 Sq.mts. ( 512 Sq.ft. )1
1 Booked100% Booked
100% Booked
TERRACE15.23 Sq.mts. ( 164 Sq.ft. )1
1 Booked100% Booked
100% Booked
TERRACE85 Sq.mts. ( 915 Sq.ft. )1
1 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building Pant Nagar Shri Ram Chs Ltd Bldg No 105 Ground ToCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress71% done
71% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dev Reality Corporation
for Project
Pant Nagar Shri Ram C.H.S. Ltd. Building No.105
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation