Palm Springs Phase - I is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000016750. Palm Springs Phase - I is located at 446, 447. This is a New being developed by Arvel Developers.

Palm Springs Phase - I has TYPE E BUNGLOW, TYPE E1 BUNGLOW, TYPE E2 BUNGLOW, TYPE E3 BUNGLOW, TYPE E4 BUNGLOW, TYPE E5 BUNGLOW, TYPE E6 BUNGLOW, TYPE E7 BUNGLOW & TYPE E8 BUNGLOW Apartments with carpet areas ranging from 11509 to 1439 Sq.ft. Carpet. The Project has total 88 of which 33 are currently available for sale.

Palm Springs Phase - I is being developed on a total land area of 62913 Sq.ft. out of which 5819 Sq.ft. i.e 9% is reserved for recreational purposes. Palm Springs Phase - I has 10 Wings / Towers C-Type Building,Type D,Type E1 Bunglow,Type E2 Bunglow,Type E3 Bunglow,Type E4 Bunglow,Type E5 Bunglow,Type E6 Bunglow,Type E7 Bunglow,Type E8 Bunglow

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Palm Springs Phase - I
  • Location:
  • 446, 447
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Arvel Developers
  • Phone:
  • Address:
  • Swastik
Project RERA Details
MAHA REARA No: P99000016750
Project Type Residential / Group Housing
RERA Project Status New
Architect Yogesh Mahtre
Funding Bank VASAI VIKAS SAHAKARI BANK LIMITED
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 12 Jun 2018
Last Retrived 28 Jul 2025
Palm Springs Phase - I QR Code
Palm Springs Phase - I
MahaRERA - P99000016750
Apartment Details & Configuration
TypeArea
1 BHK42.21 Sq.mts. ( 454 Sq.ft. )
2 BHK65.66 Sq.mts. ( 707 Sq.ft. )
2 BHK70.68 Sq.mts. ( 761 Sq.ft. )
TYPE D BUNGLOW182.97 Sq.mts. ( 1969 Sq.ft. )
TYPE E1 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )
TYPE E BUNGLOW1069.18 Sq.mts. ( 11509 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Palm Springs Phase - Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space90% completed
90% Complete
Garden
Community Buildings75% completed
75% Complete
Club House
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Mseb
Energy management
Na
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Fire Pumps &Amp; Accessories
Landscaping & Tree Planting50% completed
50% Complete
Tree Plantation
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains90% completed
90% Complete
Rcc Gutter
Street Lighting50% completed
50% Complete
Street Lights
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting80% completed
80% Complete
Rain Water Harwesting
Water Supply80% completed
80% Complete
Bore Well
Buildings / Wings in Palm Springs Phase - I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Palm Springs Phase - I by Arvel Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

62913 Sq. ft.

Project Area

5819 Sq. ft.

Recreational Open Space

Total 10

Wings / Towers in Project

Apartments Statistics

88 apartments in total
Total
88
Booked
55
Available
33

Saleable Area Statistics (Sq. ft.)

160392 Total
Total
160392
Booked
32561
Available
127831
Total 88 apartments in project. 55 apartments booked. 62% apartments booked.
Total 160392 Sq.ft. saleable area. 32561 saleable area booked.
20% area booked.

C-Type Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C-Type BuildingJun 2023710104515
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.21 Sq.mts. ( 454 Sq.ft. )28
28 Booked100% Booked
100% Booked
2 BHK65.66 Sq.mts. ( 707 Sq.ft. )14
13 Booked92% Booked
92% Booked
2 BHK70.68 Sq.mts. ( 761 Sq.ft. )14
14 Booked100% Booked
100% Booked
56 total apartments / 55 apartments booked. 98% apartments booked.
Work Description in Building C-Type BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Type D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type DDec 20222101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE D BUNGLOW182.97 Sq.mts. ( 1969 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Type E1 Bunglow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type E1 BunglowDec 20222101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE E1 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type E1 BunglowCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Type E2 Bunglow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type E2 BunglowDec 20222101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE E2 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type E2 BunglowCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Type E3 Bunglow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type E3 BunglowDec 20222101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE E3 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type E3 BunglowCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Type E4 Bunglow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type E4 BunglowDec 20222101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE E4 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type E4 BunglowCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Type E5 Bunglow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type E5 BunglowDec 20222101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE E5 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type E5 BunglowCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Type E6 Bunglow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type E6 BunglowDec 20222101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE E6 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type E6 BunglowCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Type E7 Bunglow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type E7 BunglowDec 20222101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE E7 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type E7 BunglowCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Type E8 Bunglow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type E8 BunglowDec 20222101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE E BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )8
None Booked0% Booked
0% Booked
TYPE E BUNGLOW1069.18 Sq.mts. ( 11509 Sq.ft. )8
None Booked0% Booked
0% Booked
TYPE E1 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
TYPE E2 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
TYPE E3 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
TYPE E4 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
TYPE E5 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
TYPE E6 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
TYPE E7 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
TYPE E8 BUNGLOW133.64 Sq.mts. ( 1439 Sq.ft. )1
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type E8 BunglowCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Arvel Developers
for Project
Palm Springs Phase - I
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation