Project overview

Palm is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700004695. Palm is located at Plot No. 5. This is a New being developed by Pranjee Properties Pvt. Ltd.

Palm has 1 BHK & 2 BHK Apartments with carpet areas ranging from 316 to 407 Sq.ft. Carpet. The Project has total 602 of which 562 are currently available for sale.

Palm is being developed on a total land area of 105501 Sq.ft. out of which 46284 Sq.ft. i.e 44% is reserved for recreational purposes. Palm has 5 Wings / Towers Fern,Mahogany,Olive,Palm,Pine

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
SHIV-GAURISHIVAM DEVELOPERS32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
VISHNU VATIKA NX WING C1 E1 E2 PHASE 1VISHNU GROUPS No. 131 /1 And 132/230-10-2023 00:00:00
WING D- DURVANKURM K PATIL DEVELOPERSGut No 8 P19-08-2019 00:00:00
Shree Datta Narhari ApartmentOMKAR ENTERPRISESSurvey No 32,Hissa No 2,Plot No 901-12-2025 00:00:00
Amrut ManjilSAI SHRADHA DEVELOPERSS No 120 H No 4 & S No 120 H No 731-01-2028 00:00:00
SAIRAJ AVENUE WING BVIRENDRA ATMARAM SALUNKHES No 97B, Hissa No 5/3, Plot No 4431-05-2024 00:00:00
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2DEEPLAXMI DEVELOPERSS. No. 60, H.No.5 Pt,6 Pt, S. No.61,H. No.1 Part,S. No. 9130-03-2029 00:00:00
Olive - Phase III - Pranjee Garden CityPranjee Properties Pvt. LtdPlot No. 5 Part30-06-2024 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
MAPLE CITY PHASE ISHREE CHINTAMANI ENTERPRISESS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
VASTU SQUAREVASTU BUILDERSS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
OM SAVAI NIKETANSAGAR SUPER STRUCTURES PRIVATE LIMITEDPlot Bearing S.No.143, H.No.5-631-05-2018 00:00:00
AsawariAshish Waman GoleSurvey No 38 Hissa No 2A1 And 2A2 , Plot No 3 And 531-03-2018 00:00:00
TULSI AAHANRAJ GROUPS. No.39 , H No. 1,2,331-12-2019 00:00:00
THANEKAR PARKLANDAJAY MADHUKAR THANEKAR58/231-12-2019 00:00:00
Kondilkar ResidencyAditi Construction50/6P01-01-2019 00:00:00
KRISHNA DARSHANKRISHNA BUILDCONSurvey No. 148, Hissa No. 20/A31-12-2025 00:00:00
SAMARTH PARADISES P DEVELOPERSS No 21 H No 1331-12-2026 00:00:00
SHREEJI MILESTONEDEEP LAXMI ASSOCIATESSurvey No. 48, Plot No. 0130-06-2029 00:00:00
SATISH OAK HEIGHTSHREE SAI PRATHAMESH DEVELOPERSS No 66 H No 911 B And C, S No 66 H No 1031-03-2026 00:00:00
SARVESH DREAM CITY WING DSAI SHRADHA DEVELOPERSS No 76 H No 1531-12-2025 00:00:00
NIRMALA PARADISEPokhriyal And AssociatesS No 12730-09-2024 00:00:00
VIRAJ ICONICBONZER ORBITGut No.53/5, Plot No.1, Gut No.53/6,Plot No.2, Gut No.53/731-12-2026 00:00:00
SHREEJI GREENSDEEP LAXMI ASSOCIATESS No 70 H No 6A S No 70 H No 6B S No 73 H No 2 S No 73 H No 531-07-2026 00:00:00
PINNACLE ADARSHPINNACLE ENTERPRISESSurvey No 5 Hiss No 4 Plot No 930-06-2025 00:00:00
MANGALAM ARCADEMANGALAM ENTERPRISESSurvey No 7 Hissa No 1(P) Plot No 4224-04-2024 00:00:00
The Address Wing C Phase IIISADGURU ASSOCIATEGut No. 1 Hissa No 1/2, 3 & 3A31-12-2026 00:00:00
AMRUT VISHWA PHASE 2SAI SHRADHA DEVELOPERSSurvey No. 173 Hissa No. 331-12-2019 00:00:00
THANEKAR PARADISEAJAY MADHUKAR THANEKAR81/1A30-12-2019 00:00:00
VISHWAJEET MANORABHIJEET REALTYGut No 574 Pt 574231-12-2019 00:00:00
Soham NeelM/s Neel Siddhi Enterprises27/1/11 , Plot No. 831-03-2027 00:00:00
FIRST ELEGANCEGURUPREET SINGH BALDEV SINGH SANDHUSurvey No 26, Hissa No2/A/23, Plot No 20, Shirgaon31-12-2025 00:00:00
JADHAV MARKETS J Construction CoS No 48 Hissa No 11P And Hissa No 14 And Hissa No 15P20-12-2021 00:00:00
ARUNA ULHASGAONDEVI DEVELOPERS49/10/3,431-08-2018 00:00:00
APTE HOMESSHREE SIDDHI DEVELOPERSSurvey No-44, Hissa No-1/A/331-12-2018 00:00:00
Pranjee Garden City Phase -IIPranjee Properties Pvt. LtdPlot No 330-11-2018 00:00:00
SONAL CO-OP HOUSING SOCIETYSOHAM DEVELOPERS4918231-01-2019 00:00:00
SAI SHRUTIPINNACLE CONSTRUCTIONSSurveyno 331-03-2018 00:00:00
MOTIRAM PURAMNAYAN DILIP DALALSurvey No 183 H.No 9 Survey No 184 Hissa No 2A30-05-2022 00:00:00
EVERGREEN RESIDENCY C WINGBALAJI CONSTRUCTIONS No 25 Hissa No 5 And 6 And S No 24 Hissa No 130-12-2022 00:00:00
Bingo Dham Co-op Hsg Soc LtdSai ConstructionsThane, 421503, Badlapur31-12-2022 00:00:00
Daksh PalaceThakur DevelopersManjarli30-09-2024 00:00:00
Shreshtha Swapna Co-Op Housing Society LtdOm Shree Sai Builders And DevelopersTaluka Ambarnath31-12-2024 00:00:00
DREAMS ENCLAVEDREAMLAND DEVELOPERSS No97b/1/5, S No97b/3/431-12-2026 00:00:00
Shivam HeritageM.K. EnterprisesSurvey No.58, 59, 66 Plot No. 2130-04-2025 00:00:00
SHREE ATHARVATHARV ENTERPRISESS No 43 Hissa 1A31-12-2025 00:00:00
SAI ARCADESAI DEVELOPERSSurvey No 5 Hissa No 22 Plot No 431-12-2017 00:00:00
SAI RAJ RESIDENCYSHRIRAM DEVELOPERS19 H .No.47, P No.731-12-2018 00:00:00
SHUBH VATIKASHUBH ENTERPRISES7A, H No 230-11-2018 00:00:00
Aditi PlazaChintamani Construction53/13P30-06-2018 00:00:00
MANOHAR VIKAS SHREEJI PARAISO PHASE 1DEEPLAXMI DEVELOPERSS No 60/5, 60/6, 61/130-05-2022 00:00:00
Shree Sai PoojaM/s Mahalaxmi Construction Co.15/331-12-2019 00:00:00
RUBYANA RESIDENCY PHASE 1SUDHIR DAMODAR GHATNEKARSurvey No. 8930-06-2018 00:00:00
KRISHNA KUNJRAJ MANOHAR WADHWASurvey No 63 / Hissa No 2 Plot No A231-03-2018 00:00:00
Krishna HillsShree Omsai ConstructionThane, 40053131-07-2017 00:00:00
FULORA CO-OP HOUSING SOCIETY LTDPINNACLE CREATORSSurvey No 13 Hissa No 6 A 1731-07-2025 00:00:00
SHIV TIRTH B WINGGAJRAJ ENTERPRISESSr No 36 Hissa No 3P Cts No 37931-12-2025 00:00:00
KRISHNA KUTIRSHUBH KRISHNA REALTORS42150330-06-2025 00:00:00
SHUBH AARAMBHPACIFIC CONSTRUCTION & DEVELOPERS105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
vedant nakshatra ABC phase 1MOHAN HARDASMAL THARWANIS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
Project Details
  • Project:
    Palm
  • Location:
  • Plot No. 5
  • Const. Stage:
    New
  • Possession:
    28 May 2021
Developer Details

  • Developer:
    Pranjee Properties Pvt. Ltd
  • Phone:
  • Address:
  • Jollitha Complex
Project RERA Details
MAHA REARA No: P51700004695
Project Type Others
RERA Project Status New
Architect Arvind Mahtre
Funding Bank AXIS BANK
Proposed Possession 28 May 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 13 Feb 2026
Palm QR Code
Palm
MahaRERA - P51700004695
Apartment Details & Configuration
TypeArea
1 BHK29.24 Sq.mts. ( 315 Sq.ft. )
1 BHK29.37 Sq.mts. ( 316 Sq.ft. )
2 BHK37.85 Sq.mts. ( 407 Sq.ft. )
2 BHK37.83 Sq.mts. ( 407 Sq.ft. )
2 BHK38.37 Sq.mts. ( 413 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Palmlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Work Not Started Yet
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Yet Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Work Not Yet Started
Landscaping & Tree Planting
Work Not Yet Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Only Chamber To Constructed
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Not Yet Started
Street Lighting
Work Not Yet Started
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work Not Yet Started
Water Supply
Kbmc Will Provide Connection On Receipt Of Oc
Buildings / Wings in Palm
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Palm by Pranjee Properties Pvt. Ltdlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

105501 Sq. ft.

Project Area

46284 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

602 apartments in total
Total
602
Booked
40
Available
562

Saleable Area Statistics (Sq. ft.)

215133 Total
Total
215133
Booked
13940
Available
201193
Total 602 apartments in project. 40 apartments booked. 6% apartments booked.
Total 215133 Sq.ft. saleable area. 13940 saleable area booked.
6% area booked.

Fern

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
FernDec 2020201010032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.24 Sq.mts. ( 315 Sq.ft. )38
None Booked0% Booked
0% Booked
1 BHK29.37 Sq.mts. ( 316 Sq.ft. )80
None Booked0% Booked
0% Booked
2 BHK37.85 Sq.mts. ( 407 Sq.ft. )80
None Booked0% Booked
0% Booked
198 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building FernCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Mahogany

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
MahoganyDec 2021121010025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.37 Sq.mts. ( 316 Sq.ft. )47
None Booked0% Booked
0% Booked
2 BHK37.83 Sq.mts. ( 407 Sq.ft. )48
None Booked0% Booked
0% Booked
95 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building MahoganyCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Olive

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
OliveDec 2021121010025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.37 Sq.mts. ( 316 Sq.ft. )47
None Booked0% Booked
0% Booked
2 BHK37.83 Sq.mts. ( 407 Sq.ft. )48
None Booked0% Booked
0% Booked
95 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building OliveCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Palm

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
PalmNov 2020121010032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.24 Sq.mts. ( 315 Sq.ft. )23
7 Booked30% Booked
30% Booked
1 BHK29.37 Sq.mts. ( 316 Sq.ft. )48
19 Booked39% Booked
39% Booked
2 BHK37.83 Sq.mts. ( 407 Sq.ft. )28
9 Booked32% Booked
32% Booked
2 BHK38.37 Sq.mts. ( 413 Sq.ft. )20
5 Booked25% Booked
25% Booked
119 total apartments / 40 apartments booked. 33% apartments booked.
Work Description in Building PalmCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Pine

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
PineDec 2020121010025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.37 Sq.mts. ( 316 Sq.ft. )47
None Booked0% Booked
0% Booked
2 BHK37.83 Sq.mts. ( 407 Sq.ft. )48
None Booked0% Booked
0% Booked
95 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building PineCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Pranjee Properties Pvt. Ltd
for Project
Palm
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation