Project overview

Palava Clara J-M is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000420. Palava Clara J-M is located at 144/9A Pt 144/9B Pt 144/5 Pt 40/2 Pt 143/2 Pt 144/6 Pt 144/9 Pt. This is a Ongoing being developed by Palava Dwellers Private Limited.

Palava Clara J-M has 1 BHK, 2 BHK, 2 BHKULTIMA & 3 BHKOPTIMA Apartments with carpet areas ranging from 398 to 642 Sq.ft. Carpet. The Project has total 314 of which 90 are currently available for sale.

Palava Clara J-M is being developed on a total land area of 37297 Sq.ft. out of which 27298 Sq.ft. i.e 73% is reserved for recreational purposes. Palava Clara J-M has 4 Wings / Towers Clara J,Clara K,Clara L,Clara M

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Palava Clara J-M
  • Location:
  • 144/9A Pt 144/9B Pt 144/5 Pt 40/2 Pt 143/2 Pt 144/6 Pt 144/9 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Oct 2022
Developer Details

  • Developer:
    Palava Dwellers Private Limited
  • Phone:
  • Address:
  • Vardhaman Chamber
Project RERA Details
MAHA REARA No: P51700000420
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Vilas Desai & Associates
Funding Bank HDFC BANK
Proposed Possession 30 Oct 2022
Revised Possession 30 Oct 2022
Extended Possession
Litigations No Litigations
Last Modified 28 Sep 2018
Last Retrived 26 Jul 2025
Palava Clara J-M QR Code
Palava Clara J-M
MahaRERA - P51700000420
Apartment Details & Configuration
TypeArea
1 BHK50.14 Sq.mts. ( 540 Sq.ft. )
1 BHK51.45 Sq.mts. ( 554 Sq.ft. )
1 BHK39.4 Sq.mts. ( 424 Sq.ft. )
1 BHK39.48 Sq.mts. ( 425 Sq.ft. )
2 BHK48.43 Sq.mts. ( 521 Sq.ft. )
2 BHK49.05 Sq.mts. ( 528 Sq.ft. )
2 BHKULTIMA48.96 Sq.mts. ( 527 Sq.ft. )
3 BHK73.27 Sq.mts. ( 789 Sq.ft. )
3 BHK56.6 Sq.mts. ( 609 Sq.ft. )
3 BHK57.69 Sq.mts. ( 621 Sq.ft. )
3 BHK57.7 Sq.mts. ( 621 Sq.ft. )
3 BHK57.75 Sq.mts. ( 622 Sq.ft. )
3 BHKOPTIMA59.66 Sq.mts. ( 642 Sq.ft. )
3 BHKOPTIMA59.72 Sq.mts. ( 643 Sq.ft. )
3 BHKOPTIMA59.74 Sq.mts. ( 643 Sq.ft. )
1 BHK40.44 Sq.mts. ( 435 Sq.ft. )
2 BHKULTIMA54.51 Sq.mts. ( 587 Sq.ft. )
1 BHK37 Sq.mts. ( 398 Sq.ft. )
1 BHK37.07 Sq.mts. ( 399 Sq.ft. )
1 BHK37.98 Sq.mts. ( 409 Sq.ft. )
1 BHK39.68 Sq.mts. ( 427 Sq.ft. )
1 BHK39.69 Sq.mts. ( 427 Sq.ft. )
1 BHK41.3 Sq.mts. ( 445 Sq.ft. )
1 BHK48.42 Sq.mts. ( 521 Sq.ft. )
2 BHK49.6 Sq.mts. ( 534 Sq.ft. )
2 BHK50.17 Sq.mts. ( 540 Sq.ft. )
2 BHKULTIMA52.25 Sq.mts. ( 562 Sq.ft. )
3 BHKOPTIMA59.64 Sq.mts. ( 642 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Palava Clara J-Mlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space75% completed
75% Complete
Na
Club House2% completed
2% Complete
Na
Community Buildings100% completed
95% Complete
Shared Across Multiple Phases Of Projects
Electrical Meter Room, Sub-Station, Receiving Station40% completed
40% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements75% completed
75% Complete
Na
Landscaping & Tree Planting90% completed
90% Complete
Na
Open Parking100% completed
95% Complete
Na
Sewerage (Chamber, Lines, Septic Tank , STP)85% completed
85% Complete
Na
Solid Waste Management And Disposal
Na
Sports Complex20% completed
20% Complete
Na
Storm Water Drains85% completed
85% Complete
Na
Street Lighting100% completed
95% Complete
Na
Temple50% completed
50% Complete
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Na
Water Conservation, Rain water Harvesting
Na
Water Supply50% completed
50% Complete
Na
Woodlands Park
Na
Buildings / Wings in Palava Clara J-M
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Palava Clara J-M by Palava Dwellers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

37297 Sq. ft.

Project Area

27298 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

314 apartments in total
Total
314
Booked
224
Available
90

Saleable Area Statistics (Sq. ft.)

168239 Total
Total
168239
Booked
115821
Available
52418
Total 314 apartments in project. 224 apartments booked. 71% apartments booked.
Total 168239 Sq.ft. saleable area. 115821 saleable area booked.
69% area booked.

Clara J

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Clara JOct 20211710001654
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK50.14 Sq.mts. ( 540 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK51.45 Sq.mts. ( 554 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK39.4 Sq.mts. ( 424 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK39.48 Sq.mts. ( 425 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK48.43 Sq.mts. ( 521 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK49.05 Sq.mts. ( 528 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHKULTIMA48.96 Sq.mts. ( 527 Sq.ft. )23
23 Booked100% Booked
100% Booked
3 BHK73.27 Sq.mts. ( 789 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK56.6 Sq.mts. ( 609 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK57.69 Sq.mts. ( 621 Sq.ft. )9
None Booked0% Booked
0% Booked
3 BHK57.7 Sq.mts. ( 621 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK57.75 Sq.mts. ( 622 Sq.ft. )9
None Booked0% Booked
0% Booked
3 BHKOPTIMA59.66 Sq.mts. ( 642 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHKOPTIMA59.72 Sq.mts. ( 643 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHKOPTIMA59.74 Sq.mts. ( 643 Sq.ft. )4
4 Booked100% Booked
100% Booked
70 total apartments / 44 apartments booked. 62% apartments booked.
Work Description in Building Clara JCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Clara K

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Clara KOct 20211710001654
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.4 Sq.mts. ( 424 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK40.44 Sq.mts. ( 435 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK51.45 Sq.mts. ( 554 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK49.05 Sq.mts. ( 528 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK48.43 Sq.mts. ( 521 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHKULTIMA48.96 Sq.mts. ( 527 Sq.ft. )21
21 Booked100% Booked
100% Booked
3 BHK56.6 Sq.mts. ( 609 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK57.69 Sq.mts. ( 621 Sq.ft. )7
None Booked0% Booked
0% Booked
3 BHK57.7 Sq.mts. ( 621 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK57.75 Sq.mts. ( 622 Sq.ft. )8
None Booked0% Booked
0% Booked
3 BHKOPTIMA59.66 Sq.mts. ( 642 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHKOPTIMA59.72 Sq.mts. ( 643 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHKOPTIMA59.74 Sq.mts. ( 643 Sq.ft. )2
2 Booked100% Booked
100% Booked
70 total apartments / 46 apartments booked. 65% apartments booked.
Work Description in Building Clara KCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Clara L

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Clara LOct 20211710001654
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.48 Sq.mts. ( 425 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK48.43 Sq.mts. ( 521 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK49.05 Sq.mts. ( 528 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHKULTIMA54.51 Sq.mts. ( 587 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHKULTIMA48.96 Sq.mts. ( 527 Sq.ft. )24
24 Booked100% Booked
100% Booked
3 BHK57.69 Sq.mts. ( 621 Sq.ft. )8
None Booked0% Booked
0% Booked
3 BHK57.7 Sq.mts. ( 621 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK57.75 Sq.mts. ( 622 Sq.ft. )8
None Booked0% Booked
0% Booked
3 BHKOPTIMA59.66 Sq.mts. ( 642 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHKOPTIMA59.72 Sq.mts. ( 643 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHKOPTIMA59.74 Sq.mts. ( 643 Sq.ft. )2
2 Booked100% Booked
100% Booked
70 total apartments / 48 apartments booked. 68% apartments booked.
Work Description in Building Clara LCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Clara M

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Clara MOct 20211710001689
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37 Sq.mts. ( 398 Sq.ft. )51
51 Booked100% Booked
100% Booked
1 BHK37.07 Sq.mts. ( 399 Sq.ft. )9
9 Booked100% Booked
100% Booked
1 BHK37.98 Sq.mts. ( 409 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK39.68 Sq.mts. ( 427 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK39.69 Sq.mts. ( 427 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK41.3 Sq.mts. ( 445 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK48.42 Sq.mts. ( 521 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK49.6 Sq.mts. ( 534 Sq.ft. )9
None Booked0% Booked
0% Booked
2 BHK50.17 Sq.mts. ( 540 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHKULTIMA52.25 Sq.mts. ( 562 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHKULTIMA50.14 Sq.mts. ( 540 Sq.ft. )23
21 Booked91% Booked
91% Booked
3 BHKOPTIMA59.64 Sq.mts. ( 642 Sq.ft. )1
1 Booked100% Booked
100% Booked
104 total apartments / 86 apartments booked. 82% apartments booked.
Work Description in Building Clara MCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Palava Dwellers Private Limited
for Project
Palava Clara J-M
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation