Project overview

Palatina is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800047793. Palatina is located at C.T.S. No.194A(Pt.). This is a New being developed by Tanishq Builders.

Palatina has 2 BHK Apartments with carpet areas ranging from 833 to 833 Sq.ft. Carpet. The Project has total 46 of which 46 are currently available for sale.

Palatina is being developed on a total land area of 34480 Sq.ft. out of which 6961 Sq.ft. i.e 20% is reserved for recreational purposes. Palatina has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Palatina
  • Location:
  • C.T.S. No.194A(Pt.)
  • Const. Stage:
    New
  • Possession:
    28 Feb 2026
Developer Details

  • Developer:
    Tanishq Builders
  • Phone:
  • Address:
  • The Palms
Project RERA Details
MAHA REARA No: P51800047793
Project Type Residential / Group Housing
RERA Project Status New
Architect Hemant Karani
Funding Bank HDFC BANK
Proposed Possession 28 Feb 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Nov 2022
Last Retrived 26 Jul 2025
Palatina QR Code
Palatina
MahaRERA - P51800047793
Apartment Details & Configuration
TypeArea
3 BHK130.06 Sq.mts. ( 1400 Sq.ft. )
4 BHK161 Sq.mts. ( 1733 Sq.ft. )
4 BHK164.43 Sq.mts. ( 1770 Sq.ft. )
4 BHK260.81 Sq.mts. ( 2807 Sq.ft. )
5 BHK & more521.62 Sq.mts. ( 5615 Sq.ft. )
5 BHK & more228.36 Sq.mts. ( 2458 Sq.ft. )
2 BHK77.38 Sq.mts. ( 833 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Palatinalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Yet To Start
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Energy management
Na
Fire Protection And Fire Safety Requirements
Yet To Start
Landscaping & Tree Planting
Yet To Start
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Start
Solid Waste Management And Disposal
Yet To Start
Storm Water Drains
Yet To Start
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Yet To Start
Water Conservation, Rain water Harvesting
Yet To Start
Water Supply
Yet To Start
Buildings / Wings in Palatina
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Palatina by Tanishq Builderslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

34480 Sq. ft.

Project Area

6961 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

46 apartments in total
Total
46
Booked
0
Available
46

Saleable Area Statistics (Sq. ft.)

70171 Total
Total
70171
Booked
0
Available
70171
Total 46 apartments in project. 0 apartments booked. 0% apartments booked.
Total 70171 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingFeb 20261514110157
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK130.06 Sq.mts. ( 1400 Sq.ft. )12
None Booked0% Booked
0% Booked
4 BHK161 Sq.mts. ( 1733 Sq.ft. )8
None Booked0% Booked
0% Booked
4 BHK164.43 Sq.mts. ( 1770 Sq.ft. )8
None Booked0% Booked
0% Booked
4 BHK260.81 Sq.mts. ( 2807 Sq.ft. )2
None Booked0% Booked
0% Booked
5 BHK & more521.62 Sq.mts. ( 5615 Sq.ft. )1
None Booked0% Booked
0% Booked
5 BHK & more228.36 Sq.mts. ( 2458 Sq.ft. )1
None Booked0% Booked
0% Booked
32 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingFeb 2026191411014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK77.38 Sq.mts. ( 833 Sq.ft. )14
None Booked0% Booked
0% Booked
14 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Tanishq Builders
for Project
Palatina
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation