Project overview

Padmavati Towers is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800019132. Padmavati Towers is located at Plot No 4981/A 4891/A/1-4 4894 4894/1-44 4891/B 4981/B/1-5, Survey No313 Hissa No2 4908 Part 4908/1-4. This is a New being developed by Gold Ghar Constructions Pvt Ltd.

Padmavati Towers has 2 BHK Apartments with carpet areas ranging from 764 to 770 Sq.ft. Carpet. The Project has total 57 of which 40 are currently available for sale.

Padmavati Towers is being developed on a total land area of 20555 Sq.ft. out of which 1597 Sq.ft. i.e 8% is reserved for recreational purposes. Padmavati Towers has 2 Wings / Towers Padmavati Towers B Wing,Padmavati Towers C Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Padmavati Towers
  • Location:
  • Plot No 4981/A 4891/A/1-4 4894 4894/1-44 4891/B 4981/B/1-5, Survey No313 Hissa No2 4908 Part 4908/1-4
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Gold Ghar Constructions Pvt Ltd
  • Phone:
  • Address:
  • Vinayak Kunj
Project RERA Details
MAHA REARA No: P51800019132
Project Type Residential / Group Housing
RERA Project Status New
Architect Hemal Sanghavi
Funding Bank INDIAN BANK
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 25 Feb 2025
Last Retrived 26 Jul 2025
Padmavati Towers QR Code
Padmavati Towers
MahaRERA - P51800019132
Apartment Details & Configuration
TypeArea
1 BHK26.19 Sq.mts. ( 282 Sq.ft. )
1 BHK26.23 Sq.mts. ( 282 Sq.ft. )
2 BHK49.95 Sq.mts. ( 538 Sq.ft. )
2 BHK70.98 Sq.mts. ( 764 Sq.ft. )
2 BHK71.25 Sq.mts. ( 767 Sq.ft. )
2 BHK71.5 Sq.mts. ( 770 Sq.ft. )
2 BHK71.57 Sq.mts. ( 770 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Padmavati Towerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
In Progress
Water Conservation, Rain water Harvesting
In Progress
Treatment And Disposal Of Sewage And Sullage Water
In Progress
Street Lighting
In Progress
Storm Water Drains
In Progress
Solid Waste Management And Disposal
In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)
In Progress
Open Parking
Na
Landscaping & Tree Planting
In Progress
Fire Protection And Fire Safety Requirements
In Progress
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station
In Progress
Community Buildings
Na
Aggregate area of recreational Open Space
In Progress
Buildings / Wings in Padmavati Towers
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Padmavati Towers by Gold Ghar Constructions Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

20555 Sq. ft.

Project Area

1597 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

57 apartments in total
Total
57
Booked
17
Available
40

Saleable Area Statistics (Sq. ft.)

40157 Total
Total
40157
Booked
12545
Available
27612
Total 57 apartments in project. 17 apartments booked. 29% apartments booked.
Total 40157 Sq.ft. saleable area. 12545 saleable area booked.
31% area booked.

Padmavati Towers B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Padmavati Towers B WingDec 2023131010111
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.19 Sq.mts. ( 282 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK26.23 Sq.mts. ( 282 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK49.95 Sq.mts. ( 538 Sq.ft. )3
None Booked0% Booked
0% Booked
9 total apartments / 1 apartments booked. 11% apartments booked.
Work Description in Building Padmavati Towers B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress62% done
62% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress62% done
62% Booked

Padmavati Towers C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Padmavati Towers C WingDec 20231310101321
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.98 Sq.mts. ( 764 Sq.ft. )12
7 Booked58% Booked
58% Booked
2 BHK71.25 Sq.mts. ( 767 Sq.ft. )12
5 Booked41% Booked
41% Booked
2 BHK71.5 Sq.mts. ( 770 Sq.ft. )12
2 BHK71.57 Sq.mts. ( 770 Sq.ft. )12
48 total apartments / 16 apartments booked. 33% apartments booked.
Work Description in Building Padmavati Towers C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Gold Ghar Constructions Pvt Ltd
for Project
Padmavati Towers
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation