Project overview

Padhye Complex Phase Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000001884. Padhye Complex Phase Ii is located at 106/1/1, 106/7 , 107/2. This is a Ongoing being developed by K K Construction.

Padhye Complex Phase Ii has ATYPE3 BHK, BTYPE2 BHK, CTYPE2 BHK, D TYPE 1BHK, SHOP1, SHOP2 & SHOP3 Apartments with carpet areas ranging from 191 to 648 Sq.ft. Carpet. The Project has total 66 of which 66 are currently available for sale.

Padhye Complex Phase Ii is being developed on a total land area of 49556 Sq.ft. out of which 15608 Sq.ft. i.e 31% is reserved for recreational purposes. Padhye Complex Phase Ii has 3 Wings / Towers Crescent Point D,Crescent Point E,Crescent Point F

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Padhye Complex Phase Ii
  • Location:
  • 106/1/1, 106/7 , 107/2
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    K K Construction
  • Phone:
  • Address:
  • City Point
Project RERA Details
MAHA REARA No: P99000001884
Project Type Others
RERA Project Status Ongoing
Architect Anjali
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Last Modified 29 Jul 2017
Last Retrived 28 Jul 2025
Padhye Complex Phase Ii QR Code
Padhye Complex Phase Ii
MahaRERA - P99000001884
Apartment Details & Configuration
TypeArea
ATYPE3 BHK60.19 Sq.mts. ( 648 Sq.ft. )
BTYPE2 BHK45.18 Sq.mts. ( 486 Sq.ft. )
CTYPE2 BHK47.56 Sq.mts. ( 512 Sq.ft. )
D TYPE 1BHK36.01 Sq.mts. ( 388 Sq.ft. )
SHOP122.24 Sq.mts. ( 239 Sq.ft. )
SHOP217.76 Sq.mts. ( 191 Sq.ft. )
SHOP320.7 Sq.mts. ( 223 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Padhye Complex Phase Iilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Done
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Done
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting100% completed
95% Complete
Done
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Done
Buildings / Wings in Padhye Complex Phase Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Padhye Complex Phase Ii by K K Constructionlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

49556 Sq. ft.

Project Area

15608 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

66 apartments in total
Total
66
Booked
0
Available
66

Saleable Area Statistics (Sq. ft.)

29733 Total
Total
29733
Booked
0
Available
29733
Total 66 apartments in project. 0 apartments booked. 0% apartments booked.
Total 29733 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Crescent Point D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Crescent Point DJan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ATYPE3 BHK60.19 Sq.mts. ( 648 Sq.ft. )6
None Booked0% Booked
0% Booked
BTYPE2 BHK45.18 Sq.mts. ( 486 Sq.ft. )6
None Booked0% Booked
0% Booked
CTYPE2 BHK47.56 Sq.mts. ( 512 Sq.ft. )2
None Booked0% Booked
0% Booked
D TYPE 1BHK36.01 Sq.mts. ( 388 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP122.24 Sq.mts. ( 239 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP217.76 Sq.mts. ( 191 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP320.7 Sq.mts. ( 223 Sq.ft. )2
None Booked0% Booked
0% Booked
22 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Crescent Point DCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Crescent Point E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Crescent Point EJan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
A TYPE 3 BHK60.19 Sq.mts. ( 648 Sq.ft. )6
None Booked0% Booked
0% Booked
B TYPE 2BHK45.18 Sq.mts. ( 486 Sq.ft. )6
None Booked0% Booked
0% Booked
C TYPE 2BHK47.56 Sq.mts. ( 512 Sq.ft. )2
None Booked0% Booked
0% Booked
D TYPE 1 BHK36.01 Sq.mts. ( 388 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP 122.24 Sq.mts. ( 239 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP 217.76 Sq.mts. ( 191 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP 320.7 Sq.mts. ( 223 Sq.ft. )2
None Booked0% Booked
0% Booked
22 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Crescent Point ECompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Crescent Point F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Crescent Point FJan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ATYPE3 BHK60.19 Sq.mts. ( 648 Sq.ft. )6
None Booked0% Booked
0% Booked
BTYPE2 BHK45.18 Sq.mts. ( 486 Sq.ft. )6
None Booked0% Booked
0% Booked
CTYPE2 BHK47.56 Sq.mts. ( 512 Sq.ft. )2
None Booked0% Booked
0% Booked
D TYPE 1BHK36.01 Sq.mts. ( 388 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP122.24 Sq.mts. ( 239 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP217.76 Sq.mts. ( 191 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP320.7 Sq.mts. ( 223 Sq.ft. )2
None Booked0% Booked
0% Booked
22 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Crescent Point FCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
K K Construction
for Project
Padhye Complex Phase Ii
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation