| NANDIGRAM | YOGESH KISHOR MAHAJAN | Tikka No 5, 62A/1 | 31-03-2025 00:00:00 |
| WINDERMERE BUILDING NO 1 TO 6 | A G SUPERSTRUCTURES PVT LTD | New S. No./Old S. No./ H.No. 221/564/1,3,4A,4B,8. New S. No/Old S. No/ H.No/220/565/1,4,6,7,8,9,10. New S. No/Old S. No/H.No/267/567/1,2/1. New S. No/Old S. No/245/579/1A,1B,2,3A,3B,3C,4,5,6,7 | 31-12-2027 00:00:00 |
| THE EMPRESS | UNIQUE SHANTI DEVELOPERS LLP | Old S.No.479/2 | 30-03-2023 00:00:00 |
| LOTUS PARK | REAL ENTERPRISE | 842-A, Plot No. 02,03 | 30-12-2022 00:00:00 |
| RAVIRAJ APARTMENT | RAJENDRA GHORPADE | S.No 85,H. No 11, Plot No 9 | 30-12-2022 00:00:00 |
| KRUPA SINDHU | Ashish Waman Gole | S No 48 H No 8/4 | 28-11-2021 00:00:00 |
| ARVIND GALAXY | SANCHIT ENTERPRISES | Tika No 16 Cts No 78 | 30-12-2023 00:00:00 |
| SHREE SAI POOJA APARTMENT | OM SAI REALTY | S No 29/A H No 19 Plot No 87 | 30-09-2019 00:00:00 |
| Mauli Madhusudhan | Rameshwar Patil | 421605 | 30-03-2023 00:00:00 |
| SALANGPUR NIRMAN | SALANGPUR NIRMAN | 252 6,7 Part | 30-12-2022 00:00:00 |
| TEN X ERA Raymond Realty Tower C | Raymond Limited | 121 Pt 83/3 83/1 | 30-01-2029 00:00:00 |
| Guru Ganesh CHS | VADNERE BUILDER & DEVELOPERS | Survey No 13 Hissa No 6(A) Plot No 26 | 31-12-2025 00:00:00 |
| Mangeshi Neptune | Mangesh Dashrath Gaikar | Thane | 31-12-2027 00:00:00 |
| Keyur Co-Operative Housing Society Ltd | Dhanashree Developers | Kansai | 31-12-2025 00:00:00 |
| SUYOG APARTMENT | TELANGE BUILDERS & DEVELOPERS PRIVATE LIMITED | 4693 To 4699 | 30-03-2025 00:00:00 |
| Prabhat Darshan | Yashomalhar Construction | 7015A/1A | 30-06-2023 00:00:00 |
| PAYAL PRIDE | MIT ENTERPRISES | 104 | 30-03-2022 00:00:00 |
| Panvelkar Estate - Greenford | Panvelkar Infrastructures Private Limited | Survey No. 42 Hissa No 2 And 3 | 30-12-2022 00:00:00 |
| Plot 1 Sector 10 GHANSOLI | CIDCO of Maharashtra Ltd. | Plot No 1 | 30-06-2021 00:00:00 |
| RENTAL BUILDING A-1 R2 | SONAM SPARK INFRA LIMITED | 30/11,14,15,21,22,24,29/1,23/2,22/1,2,3 | 30-09-2020 00:00:00 |
| RAJ TATTVA WING A B AND E | KOTHARI AUTOPARTS MANUFACTURERS PRIVATE LIMITED | 1411, 2, 3, 144, 1451, 2, 4, 1462, 3, 4, 1481, 1421, 14831 | 30-12-2023 00:00:00 |
| KASHI DARSHAN B WING | VARAD RAJ CONSTRUCTION | 98/19 | 20-12-2023 00:00:00 |
| Saroj Sadan Chs Ltd | Shrusti Developers | Thane | 19-01-2026 00:00:00 |
| Narang Privado - B | NARANG REALTY PRIVATE LIMITED | 146/5/B And 146/6/B/1 | 31-03-2028 00:00:00 |
| Bharat Ecovistas Phase II | BHARAT REALTY VENTURE PRIVATE LIMITED | 67/2/P, 67/3A, Sub Plot B | 30-12-2023 00:00:00 |
| Panvelkar Estate - Stanford - Phase 1 | Panvelkar Infrastructures Private Limited | Gut No 42/1 | 31-12-2018 00:00:00 |
| Courtyard - Onyx | COURTYARD REAL ESTATE PRIVATE LIMITED | 281/2A/1B, 283/1, 288/2D/1D | 30-05-2023 00:00:00 |
| AVESA | JAGDALE INFRASTRUCTURE PVT. LTD. | 506 | 02-10-2026 00:00:00 |
| TERI KUDRAT | VISHNU JETHANAND BADLANI | Plot No 433, Sheet No 48, Cts No 25783 | 31-10-2024 00:00:00 |
| KANHA RESIDENCY | KULKARNII BUILDER | 105A/4/2/3/4/5/41 | 14-05-2025 00:00:00 |
| COSMOS HORIZON PHASE II | Concorde Developers | 192/2A | 30-03-2024 00:00:00 |
| Simone Residency | M R M Developers | Daighar Village | 30-12-2022 00:00:00 |
| DELTA WOODS | Delta venture | 1883Pt | 30-09-2023 00:00:00 |
| SHREEJI LANDMARK | VINAYAK DEVELOPERS | Survey No 46 Hissa No 5-1 | 30-12-2029 00:00:00 |
| HYDE PARK RESIDENCY F4 BUILDING PHASE | NEXUS BUILDERS AND DEVELOPERS PVT LTD | 47/1/2, 47/1/3, 47/1/4, 47/1/5, 47/1/7, 47/1/9, 47/1/10 | 30-12-2021 00:00:00 |
| M K Thakur Complex Phase 1 | Vraj Ratan Buildcon Pvt Ltd | Survey No 77 1A 2 4 5 | 01-12-2021 00:00:00 |
| ORION BUSINESS PARK | NEMINATH ENTERPRISES | Gut No 33 Pt | 31-03-2019 00:00:00 |
| DELTA VRINDAVAN | Delta venture | Cts 1838 1840 1883 To 1886 1968 To 1971 2039 To 2044 2100 To 2103 2157 2221 2222 2294 2158 2295 1741 | 30-09-2020 00:00:00 |
| JAI MATADEE | AARADHANA DEVELOPERS | 375 | 31-03-2018 00:00:00 |
| One Indiabulls Thane - 1 | Tapir Constructions Limited | 71/1/A/1/1, 71/2 | 29-08-2024 00:00:00 |
| LODHA AMARA - TOWER 26, 27, 28, 30, 34, 35 | LODHA DEVELOPERS LIMITED | 64/3,64/7,65/2,65/3,65/4,65/5, 68/3,68/4,68/5,69/2,69/6,70/1,70/2,70/3,70/4 | 30-12-2021 00:00:00 |
| Sarthi Elanza | Sarthi Developers | S No-264/58 Plot No-55 | 31-10-2023 00:00:00 |
| BSC IT PARK | bansal steel corporation | A216 | 01-06-2024 00:00:00 |
| RUNWAL LANDS END | Runwal Construction Private Limited | 20/3 Part | 30-06-2029 00:00:00 |
| Shivsai Paradise | BHARAT AGRI FERT & REALTY REALTY LTD | 112/2A,3,4,5/1,5/2,5/3 | 30-12-2028 00:00:00 |
| RUBA | Shreyas Enterprises | 112/5/4 | 30-09-2020 00:00:00 |
| Krishna - B Wing | Neelkanth Palm Realty | 149/4/1 Pt, 412/2 Pt | 30-05-2022 00:00:00 |
| VARDHMAN VATIKA | DIWALI DEVELOPERS | Survey No 21 Part And 22 Part | 31-12-2019 00:00:00 |
| Panvelkar Estate - Oxford - Phase 1 | Panvelkar Infrastructures Private Limited | Gut No.45/2,46/2,47,49/4,49/9,49/11,49/12 | 30-12-2023 00:00:00 |
| Bhagwan Krishna Niwas | QUICK DEVELOPERS | 27/12 | 01-07-2024 00:00:00 |
| ZENITH | RUNWAL DEVELOPERS PRIVATE LIMITED | Survey No 51 Hissa No 1 To 15 Survey No 52 Hissa No 1 To 3 Survey No 53 | 30-09-2028 00:00:00 |
| URBAN NEST BLDG - 1 | CLLARO ENTERPRISES LLP | 127-1A | 31-12-2024 00:00:00 |
| TRINITY MOKSH | RATTANRAJ LIFESPACES | S No 64 1 And 64 2 | 31-03-2025 00:00:00 |
| Ganesh Bhuvan | Magnum Homes | 668 | 30-09-2024 00:00:00 |
| AUDUMBER FLOWER VALLEY | AUDUMBER SUPERSTRUCTURES | S No 5/4/D 5/4/B 5/23/B | 30-06-2025 00:00:00 |
| SPM DREAM CITY PHASE 1 | D K BUILDCON | S No 52 H No 4/5 | 31-12-2028 00:00:00 |
| MY CITY PHASE II CLUSTER 5 PART II | HORIZON PROJECTS PVT LTD | 108/1 And 93 Part | 31-12-2027 00:00:00 |
| SEVEN ELEVEN COURTYARD | S.S.S ASSOICATES | Thane | 30-11-2025 00:00:00 |
| GREEN SQUARE | SQUAREFEET ENTERPRISES | 166/31 | 31-12-2027 00:00:00 |
| LARKINS NEST | PRIDE PROPERTY DEVELOPERS | 68/13/3F And 68/13/3G | 31-12-2025 00:00:00 |
| Shanti Legacy | Anmol Infra | Old S. No. 368, New S. No. 70 | 31-03-2025 00:00:00 |
| MADHU VILLA | SHREE KRISHNA ENTERPRISES | Survey No. 18 / House No. 22 | 30-12-2022 00:00:00 |
| Shapoorji Pallonji The Impulse- Phase 1 | Jaykali Developers Private Limited | S. No.509, 510P | 30-06-2024 00:00:00 |
| SHALIMAR CO.OP HSG SOC LTD | NEENA SHAILESH PARANJAPE | 1548, 1549 , 1550 | 30-04-2024 00:00:00 |
| Saket Imperial | Nirmaan Realty | 9570,9571 | 07-08-2025 00:00:00 |
| MARUTI SQUARE BUILDING NO 7 | MARUTI DWELLERS PRIVATE LIMITED | New Survey Nos 63 66 And 69 Pt | 31-12-2027 00:00:00 |
| NIRMAN SIGNATURE | SHREE SHA DEVELOPERS | Suevey No.180 Hissa No.3/2 | 31-03-2026 00:00:00 |
| ARIHANT CITY PHASE-II - N BUILDING | ARIHANT ENTERPRISES | 49/1P,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55P,55P,55P,56P | 30-06-2026 00:00:00 |
| ARIHANT CITY PHASE-II - M BUILDING | ARIHANT ENTERPRISES | 49/1P,49/2,49/3,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55P,55P,55P,56P | 30-06-2026 00:00:00 |
| Sun Orchid | MOHAMMED SIRAJ BASHEER | 301 | 30-12-2018 00:00:00 |
| RADHAKRISHNA | M/S NIRMAAN DEVELOPERS | 62 | 30-11-2020 00:00:00 |
| COSMOS HABITATE A WING | CONCORDE ASSOCIATES | S No 123 / 1A And 1B | 30-09-2021 00:00:00 |
| SHETH AVALON - PHASE 1 | Sheth Developers Private Limited | Out Of Survey No. 48/1P, 2, 3, 4, 5P, 49/2P, 4, 73/1, 2, 3, 4 | 30-12-2021 00:00:00 |
| INDRAPRASTH WING C | SONAM SPARK INFRA LIMITED | 30/11,14,15,21,22,24,29/1,23/2,22/1,2,3 | 30-09-2020 00:00:00 |
| SHIVANJALI HEIGHTS | SHIVANJALI CONSTRUCTION | Survey No 73, 74, 75, 76 | 30-06-2022 00:00:00 |
| Shree Moreshwar CHS Ltd | Ajay Sanjay Mohorikar | S No 33 H No. 6/15 Cts No 8973 | 31-12-2024 00:00:00 |
| SWAMI NARENDRA RESIDENCY | RAJ RATNESHWARI DEVELOPERS | 274/1-B | 31-12-2026 00:00:00 |
| TEN X HABITAT Raymond Realty | Tower A & B | Raymond Limited | 129/1 Part | 30-03-2025 00:00:00 |
| Krishna Vihar Co-operative Housing Society Limited | BAL GANAPATI LAABH DEVELOPERS | Cts Nos 20/7 And 33A T No 16 | 30-12-2021 00:00:00 |
| YASHANAND CHSL OJASS CONSTRUCTIONS | OJASS CONSTRUCTIONS | Cts No. 40 | 30-03-2022 00:00:00 |
| Falco Cheshire | Aanya Realtors | Thane, 421102 | 31-10-2016 00:00:00 |
| ASHAR METRO TOWERS | SHREE SAIBABA GRIHANIRIMITI PRIVATE LIMITED | S.No 229 Pt H.No 1,S.No 207 Pt And 208 Pt H No 7 Pt | 30-12-2024 00:00:00 |
| Orion -3 | VIJAY SURAKSHA REALTY LLP | Survey No 238/9Pt, Survey No 252/3/3Pt, Survey No 252/4/1 | 30-12-2020 00:00:00 |
| RUKMANI RESIDENCY | CLAY NEST DEVELOPERS | 421308 | 31-12-2027 00:00:00 |
| Shree Chintamani Co Op Hsg Soc Ltd | Shree Ganesh Construction | 400602, Thane, Kumbharwada Shivaji Path | 31-03-2024 00:00:00 |
| Courtyard - Asteria A | COURTYARD REAL ESTATE PRIVATE LIMITED | 281/2A/1B, 281/2A/2, 281/2A/3, 283/1, 283/2 | 31-12-2027 00:00:00 |
| Orion - Northern Lights | Jaykali Developers Private Limited | S No 509 And 510 P | 30-03-2025 00:00:00 |
| Omega - Northern Lights | Jaykali Developers Private Limited | S No 509 And 510 P | 30-03-2025 00:00:00 |
| Royal Empire | SAI POOJA CONSTRUCTIONS | S No 184 H No 2A | 30-12-2024 00:00:00 |
| Courtyard - Asteria B | COURTYARD REAL ESTATE PRIVATE LIMITED | 281/2A/1B, 281/2A/2, 281/2A/3, 283/1 | 31-12-2027 00:00:00 |
| LAXMI ARCADE | SATISH KASHINATH GUJARATHI | 362 | 31-12-2024 00:00:00 |
| KRISHNAPINGAKSHA | PRASHANT TUKARAM BAEET | S No 51 , H No 2/A/26 , Plot No 26 | 31-12-2026 00:00:00 |
| Guru Sakshat | SADGURU ENTERPRISES | Plot No 3 Gut No 46/3 H No 4 And 5 | 30-12-2025 00:00:00 |
| Poddar Wondercity Phase - Vi | Poddar Housing And Development Limited | 421503 | 30-06-2024 00:00:00 |
| Navsundaram Co Op Hsg Society | SHREEKANTH DEVELOPERS | S No 4 ,H No 18 , Plot No 2 & Plot No 3 | 31-03-2026 00:00:00 |
| OM ASHISH CHS | GREEN HEIGHTS INFRA | 421503 | 31-12-2025 00:00:00 |
| Shiv ganga Apartment | SHREE SWAMI SAMARTH CONSTRUCTION | 21534, 21552 Plot No. 253 Section - 3 A | 31-12-2024 00:00:00 |
| HCS HORIZON | HCS REALTORS LLP | Old Survey No 271 New Survey No 82 Hissa No 11 | 31-12-2026 00:00:00 |
| MAPLEWOODS PHASE 1 | M/S BKS Galaxy Realtors LLP | 51(2) 56 And 57(2) | 31-12-2028 00:00:00 |
| NEWA BHAKTI PARK B WING | NEWA TECHNOCITY (I) PRIVATE LIMITED | It 6 | 31-12-2027 00:00:00 |
| Shapoorji Pallonji Skyraa at Northern Lights | Jaykali Developers Private Limited | 509 And 510/A | 31-12-2027 00:00:00 |
| Dosti West County - Dosti Nest - Phase 2 | DOSTI ENTERPRISES | 25/7(Pt) 25/9(Pt) 25/10A(Pt) 44/1(Pt) 43/1(Pt) | 30-06-2027 00:00:00 |
| UMIYA NAKSHATRA HEIGHTS | M/S. JIGAR ENTERPRISE | S No/H No 64/2 And 64/1/4 | 31-12-2027 00:00:00 |
| CONWOOD ENCLAVE | CONWOOD REALTY PRIVATE LIMITED | Sr No. 166 To 173Ps 282 Part To 287 And S No 304 To 306 Part | 30-12-2021 00:00:00 |
| SAI SRUSHTI | JYOTIRMAY DEVELOPERS | 55 Hissa No 3 | 31-05-2018 00:00:00 |
| SHETH ZURI | Sheth Developers Private Limited | Out Of Survey No 85/1P, 81/1A, 83/2, 83/5, 85/2 | 30-12-2024 00:00:00 |
| SHETH AVALON - PHASE 2 | Sheth Developers Private Limited | Out Of Survey No48/1P,2,3,4,5P, 49/2P,4,73/1,2,3,4,5 | 30-12-2025 00:00:00 |
| ASHAR EDGE WING A PHASE II | Ms ASHAR VENTURES | S.No. 342 Hissa No 4 Part Village Majiwade, Thane 400610 | 30-10-2023 00:00:00 |
| SKYRISE RESIDENCY | NISHITH SUBANDHU LUHAR | Plot No 6/Cts No 7469/S No 38/B/6 | 30-07-2025 00:00:00 |
| PRIYANKA PARADISE | PRIYANKA REGENCY LLP | Plot 16A Sector 24 Sanpada Navi Mumbai | 31-12-2024 00:00:00 |
| Thanekar Palacio Phase II | Thanekar Construction LLP | Survey No. 82/2/1 Survey No 83/3/6 Survey No 83/3/7 Survey No 83/4A Plot No 3 5 6 & 7 | 31-12-2026 00:00:00 |
| ASHAR EDGE WING B PHASE III | Ms ASHAR VENTURES | S No 342 Hissa No 4 Pt Village Majiwade Thane West 400610 | 30-10-2023 00:00:00 |
| ASHAR EDGE GALLERIA- PHASE I | Ms ASHAR VENTURES | S.No. 342 Hissa No 4 Part, Village Majiwade, Thane-400 610 | 30-10-2023 00:00:00 |
| Thanekar Civic Phase II | Thanekar Construction LLP | Survey No. 133 Hissa No. 2 | 30-12-2024 00:00:00 |
| OM DATTATRAY CHS LTD | SHIV SHAKTI DEVELOPERS | Plot No 13/Cts No 7474 | 31-12-2024 00:00:00 |
| 25HOURLIFE - Tower B1 | RUNWAL DEVELOPERS PRIVATE LIMITED | 2/2 (Part) & 2/5 (Part) | 31-12-2029 00:00:00 |
| ELEGANT OLYMPIA | ELEGANT HOMES | 23 | 14-05-2018 00:00:00 |
| DREAM SOLITAIRE | SATYAM CONCAST PRIVATE LIMITED | Plot No 103 And 115 | 05-12-2018 00:00:00 |
| Raj Tattva Phase II Wing C and D | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 141/1, 2, 3, 144, 145/1, 2, 4, 145/3/1, 146/2, 3, 148/1, 414/2, 146/4 | 31-12-2019 00:00:00 |
| ARIHANT CITY PHASE-II - L BUILDING | ARIHANT ENTERPRISES | 49/1P,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55P,55P,55P,56P | 30-06-2026 00:00:00 |
| Om Shikhar | Vaidik Developers | Diva Vasai Railway Track Road | 01-05-2022 00:00:00 |
| Veer Galaxy | Yash Infra | Sector 2 , 108/4C , 108/4D | 31-07-2025 00:00:00 |
| PRIYANKA AVENUE | PRIYANKA REGENCY LLP | Plot No 29 Sector 15 | 31-03-2028 00:00:00 |
| SAURABH HEIGHTS | S K DEVELOPERS | S. No. 81 H No.14 P .No 1/B | 31-03-2026 00:00:00 |
| Sanyog | Aditya Associates | Cts No. 84, Tika No. 15 | 30-06-2023 00:00:00 |
| SACHINAM CO OP HSG SOCIETY | SHREEKANTH DEVELOPERS | S No 4 , H No 18 , Plot No 4 | 31-03-2024 00:00:00 |
| Krishna Kunj | Shashank C Mishra Huf | B K No A-513, Ulhasnagar, 421004, Thane | 31-12-2023 00:00:00 |
| Visava | M/s Rudrik Developers | 116/3 | 31-12-2025 00:00:00 |
| MIRAYA DIVINE | MEXTECH PROPERTY DEVELOPERS LLP | Survey No-146/1, 149/3 | 15-12-2029 00:00:00 |
| SHRI KRISHNA GOVIND PRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED | GOVIND OJASS EDIFICE PVT. LTD. | Cts No 259, Tika No 10/36A/1B | 31-12-2026 00:00:00 |
| FLORENCE | SATGURU LIFESPACES | Survey No. 122 2B And 45 3B | 31-03-2020 00:00:00 |
| SHETH VASANT LAWNS | Sheth Developers Private Limited | Out Of Survey No 52/1P,2,53P,70/2,3,10P,11,71/1P,5,72/1P,4P,6,7P,8P | 30-12-2023 00:00:00 |
| ASHAR SAPPHIRE AND GALLERIA | Ms ASHAR VENTURES | Gut No 32-2G And 32-1-6 Sub Plot B Village Chitalsar Manpada Thane | 31-12-2019 00:00:00 |
| GLORIA VISTA | MADIREDDY KONDA REDDY | 149 | 21-09-2018 00:00:00 |
| Callista | Otto Constructions | Thane, 400601 | 30-12-2025 00:00:00 |
| 25HOURLIFE - Tower C1 | RUNWAL DEVELOPERS PRIVATE LIMITED | 2/2 (Part) & 2/5 (Part) | 31-12-2029 00:00:00 |
| Courtyard - Asteria C | COURTYARD REAL ESTATE PRIVATE LIMITED | 281/2A/1B, 281/2A/2, 281/2A/3, 283/1 | 31-12-2027 00:00:00 |
| Siddhivinayak Prasad CO-OP.Housing Soc.Ltd | Shaurya Developers | S.No.49 ,H .No.18/8 , Old Plot No.3 | 31-12-2026 00:00:00 |
| Om Yashodhan CHSL | SILVER STONE REALTY | Tika No 16, Cts No 100 | 05-11-2026 00:00:00 |
| Embassy One Thane | Tapir Constructions Limited | 53/1,55/1,2,3,70/2A,70/1(Pt.),70/4(Pt.),70/6(Pt.),70/7(Pt.),70/8(Pt.),70/9B,71/2 | 31-12-2030 00:00:00 |
| GREEN SQUARE- PHASE II TOWER 1 AND 3 | SQUAREFEET ENTERPRISES | 166/31 | 31-12-2030 00:00:00 |
| SHRI LAXMI NIVAS CO OP HSG SOC LTD | OJASS GOVIND INFRA LLP | Cts 46/C/1 Tika No 15 | 31-12-2027 00:00:00 |
| LAABH ENCLAVE- PHASE 2 | VAISHNAVI HOUSING REALTY LLP | S No .4 Pt At Temghar Bhiwandi Thane | 30-09-2020 00:00:00 |
| RAJ TATTVA PHASE 1 COMMERCIAL | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 1411, 2, 3, 144, 1451,2,4, 1462,3,4, 1481, 14821, 148,1 | 30-06-2018 00:00:00 |
| GRAND ARENA | S H CONSTRUCTIONS | 160 | 24-11-2018 00:00:00 |
| AUDUMBER CROWN | AUDUMBER BUILDERS & DEVELOPERS | S No 25, H No3/3, Plot No 1 | 31-12-2026 00:00:00 |
| SRINATHJI VISHWASHREE | Srinathji Constructions | Tika No 8, Cts No 13/A/1 | 31-12-2025 00:00:00 |
| PUSHPA ENCLAVE | TIRUPATI DEVELOPERS | Mira Road East | 31-12-2025 00:00:00 |
| Ekatva Coral | Synergy Developers | Cts 39A/1 Plot 394 / D / 3-4 | 31-12-2025 00:00:00 |
| 24 EAST | MALHAR DEVELOPERS | Plot 24 | 30-06-2026 00:00:00 |
| HARSHAL CO-OP HOUSING SOCIETY LTD | VEENA DEVELOPERS | 34 | 30-09-2024 00:00:00 |
| Poddar Wondercity Phase - Ii | Poddar Housing And Development Limited | 421503 | 30-06-2022 00:00:00 |
| PODDAR WONDERCITY PHASE - I | Poddar Housing and Development Limited | S No 29 H No 2 | 30-09-2023 00:00:00 |
| Poddar Wondercity Phase - Iii | Poddar Housing And Development Limited | 421503 | 30-09-2024 00:00:00 |
| Poddar Wondercity Phase - Iv | Poddar Housing And Development Limited | Joveli Village | 31-07-2023 00:00:00 |
| Poddar Wondercity Phase - V | Poddar Housing And Development Limited | 421503 | 30-06-2024 00:00:00 |
| Laabh Enclave Phase 2 D Wing | Vaishnavi Housing Realty Llp | Temghar Village Road | 31-03-2027 00:00:00 |
| DOSHI TARACHAND VALAMJI VANIK NIWAS | SHREE CUTCHI DASHA SHRIMALI VANIK GNYATI | 1620 1620/1 To 8 Of Village Chembur Situate Laying And Being At 7Th Cross Road Near Diamond Garden Chembur Mumbai 400071 | 31-12-2023 00:00:00 |
| GOLDEN HILLS B- 3 | VIHANG ENTERPRISES | 921,923,9241,9243,9281 | 30-12-2024 00:00:00 |
| Classic Residency | Classic Construction | Thane | 30-06-2021 00:00:00 |
| Sarvodaya Classic | Ekta Builders | Survey No. 28 H.No 5 | 30-03-2026 00:00:00 |
| Lodha Amara - Wing 40 and 41 | LODHA DEVELOPERS LIMITED | 64 By 2 And 64 By 3 | 29-11-2024 00:00:00 |
| PALAVA SERENITY A | Lodha Developers Limited | 64 By 1 Pt | 28-11-2025 00:00:00 |
| UPPER THANE -SERENO A1 | LODHA DEVELOPERS LIMITED | 35/1P | 31-07-2024 00:00:00 |