Project overview

Oswal Dream City Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000015275. Oswal Dream City Phase 2 is located at Survey 825 Hissa 9, Survey 823 Hissa 6 Survey823 Hissa 8 Survey 823 Hissa 25 Survey 823 Hissa 26. This is a New being developed by Oswal Realtors Private Limited.

Oswal Dream City Phase 2 has ROW HOUSE TYPE D Apartments with carpet areas ranging from 1019 to 1019 Sq.ft. Carpet. The Project has total 256 of which 205 are currently available for sale.

Oswal Dream City Phase 2 is being developed on a total land area of 185539 Sq.ft. out of which 11087 Sq.ft. i.e 6% is reserved for recreational purposes. Oswal Dream City Phase 2 has 12 Wings / Towers Building No 13,Building No 14,Building No 15,Building No 16,Building No 17,Building No 18,Building No 19,Building No 20,Building No 21,Building No 22,Building No 23,Row House

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Oswal Dream City Phase 2
  • Location:
  • Survey 825 Hissa 9, Survey 823 Hissa 6 Survey823 Hissa 8 Survey 823 Hissa 25 Survey 823 Hissa 26
  • Const. Stage:
    New
  • Possession:
    30 Dec 2028
Developer Details

  • Developer:
    Oswal Realtors Private Limited
  • Phone:
  • Address:
  • Bldg No 1
Project RERA Details
MAHA REARA No: P99000015275
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank BANK OF BARODA
Proposed Possession 30 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 12 Feb 2018
Last Retrived 28 Jul 2025
Oswal Dream City Phase 2 QR Code
Oswal Dream City Phase 2
MahaRERA - P99000015275
Apartment Details & Configuration
TypeArea
TYPE C29.73 Sq.mts. ( 320 Sq.ft. )
TYPE D33.17 Sq.mts. ( 357 Sq.ft. )
TYPE A46.66 Sq.mts. ( 502 Sq.ft. )
TYPE B50.04 Sq.mts. ( 539 Sq.ft. )
ROW HOUSE TYPE D94.64 Sq.mts. ( 1019 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Oswal Dream City Phase 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Not Yet Started
Electrical Meter Room, Sub-Station, Receiving Station15% completed
15% Complete
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting15% completed
15% Complete
Work In Progress
Open Parking15% completed
15% Complete
Work In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)12% completed
12% Complete
Work In Progress
Solid Waste Management And Disposal
Not Yet Started
Storm Water Drains12% completed
12% Complete
Work In Progress
Street Lighting10% completed
10% Complete
Work In Progress
Treatment And Disposal Of Sewage And Sullage Water
Not Yet Started
Water Conservation, Rain water Harvesting15% completed
15% Complete
Work In Progress
Water Supply6% completed
6% Complete
Work In Progress
Buildings / Wings in Oswal Dream City Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Oswal Dream City Phase 2 by Oswal Realtors Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

185539 Sq. ft.

Project Area

11087 Sq. ft.

Recreational Open Space

Total 12

Wings / Towers in Project

Apartments Statistics

256 apartments in total
Total
256
Booked
51
Available
205

Saleable Area Statistics (Sq. ft.)

110883 Total
Total
110883
Booked
21105
Available
89778
Total 256 apartments in project. 51 apartments booked. 19% apartments booked.
Total 110883 Sq.ft. saleable area. 21105 saleable area booked.
19% area booked.

Building No 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 13Dec 20275101061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE C29.73 Sq.mts. ( 320 Sq.ft. )16
13 Booked81% Booked
81% Booked
TYPE D33.17 Sq.mts. ( 357 Sq.ft. )8
8 Booked100% Booked
100% Booked
24 total apartments / 21 apartments booked. 87% apartments booked.
Work Description in Building Building No 13Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 14Dec 20275101061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE C29.73 Sq.mts. ( 320 Sq.ft. )16
16 Booked100% Booked
100% Booked
TYPE D33.17 Sq.mts. ( 357 Sq.ft. )8
8 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building Building No 14Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 15

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 15Dec 20275101061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE C29.73 Sq.mts. ( 320 Sq.ft. )16
None Booked0% Booked
0% Booked
TYPE D33.17 Sq.mts. ( 357 Sq.ft. )8
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 15Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 16

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 16Dec 20275101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE C29.73 Sq.mts. ( 320 Sq.ft. )16
None Booked0% Booked
0% Booked
16 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 16Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 17

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 17Dec 20275101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE A46.66 Sq.mts. ( 502 Sq.ft. )4
None Booked0% Booked
0% Booked
TYPE B50.04 Sq.mts. ( 539 Sq.ft. )16
None Booked0% Booked
0% Booked
TYPE C46.66 Sq.mts. ( 502 Sq.ft. )4
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 17Completion
Basement (if any)
Excavation
work-in-progress25% done
25% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 18

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 18Dec 20275101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE A46.66 Sq.mts. ( 502 Sq.ft. )4
None Booked0% Booked
0% Booked
TYPE B50.04 Sq.mts. ( 539 Sq.ft. )16
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 18Completion
Basement (if any)
Excavation
work-in-progress25% done
25% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 19

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 19Dec 20275101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE A46.66 Sq.mts. ( 502 Sq.ft. )4
None Booked0% Booked
0% Booked
TYPE B50.04 Sq.mts. ( 539 Sq.ft. )16
None Booked0% Booked
0% Booked
TYPE C46.66 Sq.mts. ( 502 Sq.ft. )4
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 19Completion
Basement (if any)
Excavation
work-in-progress25% done
25% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 20

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 20Dec 20275101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE A46.66 Sq.mts. ( 502 Sq.ft. )4
None Booked0% Booked
0% Booked
TYPE B50.04 Sq.mts. ( 539 Sq.ft. )16
None Booked0% Booked
0% Booked
TYPE C46.66 Sq.mts. ( 502 Sq.ft. )4
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 20Completion
Basement (if any)
Excavation
work-in-progress25% done
25% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 21

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 21Dec 20275101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE C29.73 Sq.mts. ( 320 Sq.ft. )16
None Booked0% Booked
0% Booked
16 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 21Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress50% done
50% Booked

Building No 22

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 22Dec 20275101061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE C29.73 Sq.mts. ( 320 Sq.ft. )16
None Booked0% Booked
0% Booked
TYPE D33.17 Sq.mts. ( 357 Sq.ft. )8
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 22Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Building No 23

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 23Dec 20275101061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE C29.73 Sq.mts. ( 320 Sq.ft. )16
None Booked0% Booked
0% Booked
TYPE D33.17 Sq.mts. ( 357 Sq.ft. )8
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 23Completion
Basement (if any)
Excavation
work-in-progress60% done
60% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Row House

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Row HouseDec 20272100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ROW HOUSE TYPE D94.64 Sq.mts. ( 1019 Sq.ft. )12
6 Booked50% Booked
50% Booked
12 total apartments / 6 apartments booked. 50% apartments booked.
Work Description in Building Row HouseCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Oswal Realtors Private Limited
for Project
Oswal Dream City Phase 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation