Project overview

Orion is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008348. Orion is located at Cts No 135/A. This is a Ongoing being developed by Sheth & Sonal Developers.

Orion has 2 BHK Apartments with carpet areas ranging from 692 to 786 Sq.ft. Carpet. The Project has total 136 of which 12 are currently available for sale.

Orion is being developed on a total land area of 39904 Sq.ft. out of which 5889 Sq.ft. i.e 15% is reserved for recreational purposes. Orion has 4 Wings / Towers Wing A-Auriga,Wing B-Cygnus,Wing C- Orion,Wing D-Volans

ProjectDeveloperLocationPossession
Omkar Chs LtdLakshmi Builders And Developers835 Pt01-07-2023 00:00:00
RudrakshaRaj UniversalCts No 2776/B, 2776/D31-01-2021 00:00:00
ParamountPrakash Housing Pvt Ltd867 869P30-09-2018 00:00:00
Neelgagan Chs LtdSwastik Realty Pvt Ltd195 Pt31-12-2018 00:00:00
Pearl Residency - Wing-A, Commercial Phase-IiGiriraj Enterprises808 Part, 817 Part And 818 Part25-07-2019 00:00:00
Silver SkylinePrabhav Realty And Infrastructure Pvt LtdJp Road31-07-2021 00:00:00
Krishna Chaitanya Rajbhavan ChslEthics Infra Development Pvt. Ltd.Cts No 447/2B31-12-2018 00:00:00
Redevelopment Of Godi Kamgar Building C3 Wing B Skyvistas Bluez Phase IiiBharat Realty Venture Private LimitedCts No 195 Part S No 106A Part30-12-2022 00:00:00
Apurva ResidenciesStarwing Developers Private Limited173, 17230-06-2018 00:00:00
N G Eclat C Wing Phase INarinderpal Roshanlal Gupta1/196 New 1/190 A Part, Cts No. 1/19515-12-2019 00:00:00
Kanakia RainforestKanakia Spaces Realty Private Limited115 Of Village Marol30-03-2021 00:00:00
10 SquareVijay Kamdar100/1/230-06-2018 00:00:00
Eleganzia RoyaleAnmol Alliance195 Part 828 Part30-06-2021 00:00:00
Chitralekha HerritageH.K.Pujara BuildersA-1/ 690A/ 4131-03-2019 00:00:00
Lodha Eternis Idyllia B, Serena B, Natura B And CMacrotech Developers Limited75, 75/1 To 14, 74, 67/1, 7831-12-2018 00:00:00
Lodha Eternis Serena AMacrotech Developers LimitedC.T.S.No.67, 78, 67/1, 7431-12-2019 00:00:00
Lodha Eternis Natura AMacrotech Developers LimitedC.T.S.No.67, 78, 75/1 To 14, 80 Part Only Of Village Mulgaon30-05-2022 00:00:00
Kanakia SevensKanakia Spaces Realty Private LimitedCts No 706/1 To 706/22 Of Village Marol30-12-2021 00:00:00
Matri SadanSwastik DevelopersPlot No 53 Cts No 315 Village Kondivita31-12-2019 00:00:00
Akhand AnandSiv Reality Private Limited25331-12-2018 00:00:00
Al-Burhan Chs-Phase-IiRaj Romell RealtorsAndheri East, Mumbai30-12-2020 00:00:00
The Business HubAnkur Mayflower Associates657/1-19, 65730-12-2020 00:00:00
Orchid ResidencesH.K.Pujara BuildersB-51 / 666A / 5131-12-2018 00:00:00
Everglades - IiFalcon Dwellers Private LimitedMumbai Suburban, 40005330-09-2017 00:00:00
AshokheightsNew India Construction Company166/1To2631-12-2019 00:00:00
KarmayogWestin Developers Pvt. LtdAndheri30-06-2017 00:00:00
Basera Chs LtdLakshmi Builders And Developers835 Pt01-07-2023 00:00:00
SunbeamSharayu Developers Aop400053, Mumbai Suburban30-09-2023 00:00:00
Lodha Supremus - AndheriMacrotech Developers LimitedCts No.76, 81, 7728-08-2022 00:00:00
Platinum LifeSamudra Darshan Gruhpravesh Llp1/6A, 195 Pt, Survey No 106/1A30-12-2025 00:00:00
Royal GreenAdmire Revive Builder & DeveloperSuryey No. 148 Cts 1349 / 1 To 1430-12-2021 00:00:00
Sai IconicShree Krishna Sai Development CorporationS.No. 111-D, Plot No-9, Cts.No.-825/1/2331-03-2019 00:00:00
Sterling Court Wing DApraulic Construction Investment And Finance Private LimitedCts No 55/5A Part30-09-2020 00:00:00
PareejatShanti Enterprise400059, Mumbai Suburban08-01-2018 00:00:00
Al-Burhan Chs-Phase-IRaj Romell RealtorsAndheri East, Plot No 25, Cts-12973 Village Marol30-12-2020 00:00:00
Safavi Chs LtdRaj Builders1209A/ Plot No. 1731-10-2018 00:00:00
ArpitTista Impex Private Limited64A131-12-2019 00:00:00
Dlh MetroviewDev Land & Housing Private LimitedCts No 195 Pt30-04-2018 00:00:00
Cd Plot No 69 LumiereSd Svp Nagar Redevelopment Private Limited1374/B/17730-09-2019 00:00:00
VedaSrujan Development And Construction Division207A, 207A/1 To 30, 8830-06-2021 00:00:00
Eco HeightsEtco Builders Private Limited726/16 To 40, Cts 72630-12-2023 00:00:00
LandmarkCrescent Realtors India Pvt LtdCts No 641 And 770 Of Village Marol31-12-2019 00:00:00
Saideep ApartmentDarshan Infra284 Of Village Kondivate31-03-2025 00:00:00
Shyam KunjBasons Constructions29418-07-2024 00:00:00
The LisaShethwala Infra400059, Mumbai Suburban31-05-2025 00:00:00
Satyam Chs LtdSwastik Realty Pvt Ltd82131-12-2018 00:00:00
Redevelopment Of Bldg 5 And 6 Samrat And Pulkit Chs Ltd Cts No 195 Pt D N Ngr Mhada Layout Andheri WA A Estates Pvt LtdCts No 195 Pt D N Nagar Mhada Layout Andheri W Mumbai 5330-12-2022 00:00:00
Azad Nagar Suyog Chs Society LtdRajvi Builders And DevelopersMumbai Suburban, 40005308-03-2013 00:00:00
TriveniShreenath Infraprojects30231-03-2018 00:00:00
Hari Om Chs ProposedHari Om Developers40006931-12-2020 00:00:00
Sai PrasadSumit Snehashish Joint Venture740, 740/1 To 530-09-2018 00:00:00
Gaurav LegendMonarch And Querish Builders581 To 58530-12-2023 00:00:00
EleganceJaycee Homes Private LimitedSurvey No 106 Part And Cts No 195 Part31-07-2018 00:00:00
Nandini ChslMehta GroupMumbai Suburban, 40005331-12-2018 00:00:00
Tbc Marol Phase 1Agate Realtors And Developers395(Pt), 396B(Pt), 396C(Pt) ,396D, 397(Pt), 398, 398/1,407, 408, 408/1 To 3, 409, 409/1, 410, 412(Pt), 413, 413/1 To 18, 414(Pt)31-12-2030 00:00:00
Palmrose AHillview VenturesCts 42 Pt30-12-2025 00:00:00
S R Scheme Sai Prathana Chs PropPrarthana Builders Llp400059, Mumbai Suburban25-12-2020 00:00:00
A-2Parikh Enterprise626/3 Part30-12-2025 00:00:00
Kaatyayni Heights Phase 1Starwing Developers Private Limited199Pt, 215/23 T0 32, 213, 198Pt, 214/1 To 12, 199/1 To 19, 214Pt, 215/1 To 1230-06-2023 00:00:00
Giriraj ApartmentsMetro Dwellers Private LimitedCts No 863 863 1 To 863 1325-12-2018 00:00:00
Cosmopolis Phase 1Cosmos Homes India Pvt. Ltd.41 Pt, 1 190A31-12-2017 00:00:00
PhilipaRavikant SakaskarAndheri30-06-2018 00:00:00
Azad Nagar Shubham ChslPrathamesh Krupa Buildcon Private Limited183 Part31-12-2017 00:00:00
Unity By LotusLotus Logistics And Developers Private Limited1217B30-09-2020 00:00:00
Pearl Residency - Wing-B, Residential Phase - IiiGiriraj Enterprises817 Part And 818 Part, 808 Part01-08-2024 00:00:00
Safal ArcadeSafal Sanjana Builders And Developers Pvt Ltd400069, Mumbai Suburban31-12-2018 00:00:00
Metropolis ResidencesHousing Development And Infrastructure Ltd866/B/1Pt31-12-2017 00:00:00
ExoticaHilal Merchant9531, Cts No 950A, 9532A31-12-2017 00:00:00
Woods Platina Wing D - Oak TowerSukoon Developers Pvt Ltd737-C/4, 31-E/231-12-2026 00:00:00
Citi NestBasons Investments Private Limited292/1 To 3, 29231-12-2024 00:00:00
La GraceEcohomes Ventures1337, 133931-12-2026 00:00:00
Neelam Chs LtdJai Shree Krishna Builders And Developers400053, Mumbai Suburban31-12-2023 00:00:00
Nirmal Anand ChsNirmal Anand Chs Ltd142/A18-09-2022 00:00:00
Everglades - IFalcon Dwellers Private LimitedMumbai Suburban, 40005330-06-2017 00:00:00
ChambersFairmont Lifespaces Llp310, 310/1 To 310/1130-06-2021 00:00:00
The Park Residences Phase-IDevland Infracon Pvt. Ltd.1 Part18-07-2025 00:00:00
Project Details
  • Project:
    Orion
  • Location:
  • Cts No 135/A
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jul 2021
Developer Details

  • Developer:
    Sheth & Sonal Developers
  • Phone:
  • Address:
  • Court Chambers
Project RERA Details
MAHA REARA No: P51800008348
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Aakar Arcitects & Consutants
Funding Bank STATE BANK OF INDIA
Proposed Possession 30 Jul 2021
Revised Possession 30 Jul 2021
Extended Possession 30 Jan 2023
Litigations No Litigations
Last Modified 15 Dec 2021
Last Retrived 26 Jul 2025
Orion QR Code
Orion
MahaRERA - P51800008348
Apartment Details & Configuration
TypeArea
WING A 1 BHK32.7 Sq.mts. ( 352 Sq.ft. )
WING A 1 BHK35.95 Sq.mts. ( 387 Sq.ft. )
WING A 1 BHK37.63 Sq.mts. ( 405 Sq.ft. )
WING A 1 BHK38.93 Sq.mts. ( 419 Sq.ft. )
WING A 1 BHK39.67 Sq.mts. ( 427 Sq.ft. )
WING A 2 BHK43.85 Sq.mts. ( 472 Sq.ft. )
WING A 2BHK44.13 Sq.mts. ( 475 Sq.ft. )
WING A 2BHK48.77 Sq.mts. ( 525 Sq.ft. )
WING A 2BHK49.05 Sq.mts. ( 528 Sq.ft. )
WING A 2BHK58.16 Sq.mts. ( 626 Sq.ft. )
WING A 2BHK60.67 Sq.mts. ( 653 Sq.ft. )
WING A 2BHK69.58 Sq.mts. ( 749 Sq.ft. )
WING B 3 BHK81.85 Sq.mts. ( 881 Sq.ft. )
WING B 3BHK83.15 Sq.mts. ( 895 Sq.ft. )
WING B 3BHK72.46 Sq.mts. ( 780 Sq.ft. )
WING B 3BHK75.72 Sq.mts. ( 815 Sq.ft. )
WING C 2BHK78.02 Sq.mts. ( 840 Sq.ft. )
WING C 2BHK124.58 Sq.mts. ( 1341 Sq.ft. )
WING C 3BHK108.04 Sq.mts. ( 1163 Sq.ft. )
2 BHK64.29 Sq.mts. ( 692 Sq.ft. )
2 BHK72.74 Sq.mts. ( 783 Sq.ft. )
2 BHK73.02 Sq.mts. ( 786 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Orionlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
In Later Scope Of Work
Energy management
Na
Fire Protection And Fire Safety Requirements
In Later Scope Of Work
Landscaping & Tree Planting
In Later Scope Of Work
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
In Later Scope Of Work
Solid Waste Management And Disposal
Na
Storm Water Drains
In Later Scope Of Work
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
In Later Scope Of Work
Water Supply
Temporary Water Supply In Place
Buildings / Wings in Orion
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Orion by Sheth & Sonal Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

39904 Sq. ft.

Project Area

5889 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

136 apartments in total
Total
136
Booked
124
Available
12

Saleable Area Statistics (Sq. ft.)

95944 Total
Total
95944
Booked
86103
Available
9842
Total 136 apartments in project. 124 apartments booked. 91% apartments booked.
Total 95944 Sq.ft. saleable area. 86103 saleable area booked.
90% area booked.

Wing A-Auriga

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A-AurigaJan 1900141010058
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
WING A 1 BHK32.7 Sq.mts. ( 352 Sq.ft. )2
2 Booked100% Booked
100% Booked
WING A 1 BHK35.95 Sq.mts. ( 387 Sq.ft. )9
9 Booked100% Booked
100% Booked
WING A 1 BHK37.63 Sq.mts. ( 405 Sq.ft. )1
1 Booked100% Booked
100% Booked
WING A 1 BHK38.93 Sq.mts. ( 419 Sq.ft. )1
1 Booked100% Booked
100% Booked
WING A 1 BHK39.67 Sq.mts. ( 427 Sq.ft. )3
3 Booked100% Booked
100% Booked
WING A 2 BHK43.85 Sq.mts. ( 472 Sq.ft. )1
1 Booked100% Booked
100% Booked
WING A 2BHK44.13 Sq.mts. ( 475 Sq.ft. )3
3 Booked100% Booked
100% Booked
WING A 2BHK48.77 Sq.mts. ( 525 Sq.ft. )5
5 Booked100% Booked
100% Booked
WING A 2BHK49.05 Sq.mts. ( 528 Sq.ft. )4
4 Booked100% Booked
100% Booked
WING A 2BHK58.16 Sq.mts. ( 626 Sq.ft. )13
13 Booked100% Booked
100% Booked
WING A 2BHK60.67 Sq.mts. ( 653 Sq.ft. )1
1 Booked100% Booked
100% Booked
WING A 2BHK69.58 Sq.mts. ( 749 Sq.ft. )5
5 Booked100% Booked
100% Booked
48 total apartments / 48 apartments booked. 100% apartments booked.
Work Description in Building Wing A-AurigaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B-Cygnus

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B-CygnusJan 1900141010053
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
WING B 2BHK43.85 Sq.mts. ( 472 Sq.ft. )11
11 Booked100% Booked
100% Booked
WING B 2BHK48.77 Sq.mts. ( 525 Sq.ft. )5
5 Booked100% Booked
100% Booked
WING B 2BHK60.67 Sq.mts. ( 653 Sq.ft. )1
1 Booked100% Booked
100% Booked
WING B 3 BHK81.85 Sq.mts. ( 881 Sq.ft. )2
2 Booked100% Booked
100% Booked
WING B 3BHK83.15 Sq.mts. ( 895 Sq.ft. )5
5 Booked100% Booked
100% Booked
WING B 3BHK72.46 Sq.mts. ( 780 Sq.ft. )3
3 Booked100% Booked
100% Booked
WING B 3BHK75.72 Sq.mts. ( 815 Sq.ft. )3
3 Booked100% Booked
100% Booked
WING B2BHK69.58 Sq.mts. ( 749 Sq.ft. )5
5 Booked100% Booked
100% Booked
35 total apartments / 35 apartments booked. 100% apartments booked.
Work Description in Building Wing B-CygnusCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress52% done
52% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress52% done
52% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C- Orion

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C- OrionJul 2021141010056
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
WING C 2BHK78.02 Sq.mts. ( 840 Sq.ft. )12
11 Booked91% Booked
91% Booked
WING C 2BHK124.58 Sq.mts. ( 1341 Sq.ft. )1
1 Booked100% Booked
100% Booked
WING C 3BHK108.04 Sq.mts. ( 1163 Sq.ft. )12
11 Booked91% Booked
91% Booked
25 total apartments / 23 apartments booked. 92% apartments booked.
Work Description in Building Wing C- OrionCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D-Volans

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D-VolansJul 2021151010031
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.29 Sq.mts. ( 692 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK72.74 Sq.mts. ( 783 Sq.ft. )14
7 Booked50% Booked
50% Booked
2 BHK73.02 Sq.mts. ( 786 Sq.ft. )13
10 Booked76% Booked
76% Booked
28 total apartments / 18 apartments booked. 64% apartments booked.
Work Description in Building Wing D-VolansCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress67% done
67% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress67% done
67% Booked
Channel Partners
Channel Partners Registered by Developer
Sheth & Sonal Developers
for Project
Orion
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation