Project overview

Orion -3 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700006838. Orion -3 is located at F7b5n+Vdhiewhgy8xkqshy7c08xoixolqesbjw3jzhdsoneadu82tpsiklfcpm5s2s+58Svab97/R1kjxwfeka==. This is a Ongoing being developed by Vijay Suraksha Realty Llp.

Orion -3 has 1 BHK, 2 BHK, 3 BHK & 4 BHK Apartments with carpet areas ranging from 1214 to 975 Sq.ft. Carpet. The Project has total 73 of which 60 are currently available for sale.

Orion -3 is being developed on a total land area of 5877 Sq.ft. Orion -3 has 1 Wings / Towers Orion-3

ProjectDeveloperLocationPossession
Paramount AKalpataru Homes Private Limited+Migjh282kknnvdlukxvzwiopiwqfwzwrlgepopohodmiznopgtakjmeohd1mf8bxstvxbwyyebigg7dpbupqhnfk9ae54qdvxz32fucowrh3qckjpneptpakrdhdsot30-06-2025 00:00:00
Gnp ArcadiaPriva Infracon2Zcq3bt2v+Pjfsjk1/75Yq==30-01-2022 00:00:00
Dream SolitaireSatyam Concast Private LimitedSikdefkk1dwrj1r+Kmuzp2plku9yk4bjtwz/72O9ouu=05-12-2018 00:00:00
Raj Tattva Phase Ii Wing C And DKothari Autoparts Manufacturers Pvt LtdK5suda/Vysc8luhzr0wdonepezld3xy8/9Vyg0in6qk9l8qqqfa9yw+Vbwbc4qs2rls4ljgrj7jmvenlnukhgboxax3lhisjvcxlhl/Jn7zfn+Snqd/Ok0vxkiojhurc31-12-2019 00:00:00
Vardhman Garden Phase IiDiwali Construction CompanyThane31-12-2022 00:00:00
VARDHMAN VATIKADIWALI DEVELOPERSSurvey No 21 Part And 22 Part31-12-2019 00:00:00
HYDE PARK RESIDENCY F5 BUILDING PHASENEXUS BUILDERS AND DEVELOPERS PVT LTDGut No 47/1/2, 47/1/3, 47/1/5, 47/1/7, 47/1/8, 47/1/9, 47/1/1030-09-2023 00:00:00
SHALIMAR CO.OP HSG SOC LTDNEENA SHAILESH PARANJAPE1548, 1549 , 155030-04-2024 00:00:00
ARIHANT CITY PHASE-II - N BUILDINGARIHANT ENTERPRISES49/1P,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55P,55P,55P,56P30-06-2026 00:00:00
HCS HORIZONHCS REALTORS LLPOld Survey No 271 New Survey No 82 Hissa No 1131-12-2026 00:00:00
MAPLEWOODS PHASE 1M/S BKS Galaxy Realtors LLP51(2) 56 And 57(2)31-12-2028 00:00:00
NEWA BHAKTI PARK B WINGNEWA TECHNOCITY (I) PRIVATE LIMITEDIt 631-12-2027 00:00:00
SHIVANJALI HEIGHTSSHIVANJALI CONSTRUCTIONSurvey No 73, 74, 75, 7630-06-2022 00:00:00
Shree Moreshwar CHS LtdAjay Sanjay MohorikarS No 33 H No. 6/15 Cts No 897331-12-2024 00:00:00
SWAMI NARENDRA RESIDENCYRAJ RATNESHWARI DEVELOPERS274/1-B31-12-2026 00:00:00
Paramount BKalpataru Homes Private LimitedKfkcblgyygtcbzhmqyvhcuiqiiiu/Wbzjfislziyzs7o5uoxpdophykgqxecmon/Crwmiyy/Idiinctg39ussunohwtjevpuzor8n3jw8pt9hiym+M8bhfrwu6hlvqwb30-06-2025 00:00:00
Rental Building A-1 R2Sonam Spark Infra Limited/Csrf9rgkoshlr01jailfzk03hwpbwfxzkil0dkr5zekibayd5ipbp18jton/Revhscxqyrktgt0syfukd0axa==30-09-2020 00:00:00
Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing ERajesh Estates And Nirman Pvt Ltd9Vnrq8g+Qlckxy/Ua5bsoaycduycyllulmklbi2tubeq9c3hyy+Px3hk1gvegvnk30-03-2022 00:00:00
Raj Torres Phase 1Rajesh Estates And Nirman Pvt LtdTf3vmh1kw6lbyt1qbsdmlx+Ik2jssizim/+Dkytztwof+Fd1f7gx3/Pox5xsnooj31-03-2019 00:00:00
Hyde Park Residency F1 Building PhaseNexus Builders And Developers Pvt LtdB15ssshzlkqayvfoby10vq==30-12-2023 00:00:00
Laabh Enclave- Phase 2Vaishnavi Housing Realty Llp5H1q8rfltb0u6zbjltwvcfbtp6aaktm2h2ayezxzi9i1vebcrg5bcta4znjs4ha030-09-2020 00:00:00
Raj Tattva Phase 1 CommercialKothari Autoparts Manufacturers Pvt LtdSdhmz3mxcw03dhiju4bavpan6tt92txp/Tp6of2dbcmxggoatcbmwdvq6mly2uueptr/P7mzfkwlseqgrrsf/0G0v2alxl6wicifwl+I+Dy=30-06-2018 00:00:00
Grand ArenaS H ConstructionsNogbs845os59iqffgm0jzw==24-11-2018 00:00:00
Cosmos Habitate A WingConcorde AssociatesX7y9acqurwa/S/I0mqviwl01aqkawqcmokcmgnf52mo=30-09-2021 00:00:00
Ashar Edge Wing A Phase IiMs Ashar VenturesRbmqlakbq0sna1zt2y45pufs9qx37fsyfgwv9vxtgu1j5lgjaykr5ky94pry8jizfllzgvkuswbouohjavozeg==30-10-2023 00:00:00
Ashar Edge Wing B Phase IiiMs Ashar VenturesAhv+Q83okcqktvvxsiial08cbwjjsmy2amh9y4gfzynzuhzcjvbqw07g6/Kpr6giwchuj2q3blztjcht0ah6ha==30-10-2023 00:00:00
Ashar Edge Galleria- Phase IMs Ashar VenturesRbmqlakbq0sna1zt2y45plwqnczrd6y0qjkskkncnfnd47acflmum6okq7lqekvkqpmobbmjxodo8kzixdq3bg==30-10-2023 00:00:00
SKYRISE RESIDENCYNISHITH SUBANDHU LUHARPlot No 6/Cts No 7469/S No 38/B/630-07-2025 00:00:00
PRIYANKA PARADISEPRIYANKA REGENCY LLPPlot 16A Sector 24 Sanpada Navi Mumbai31-12-2024 00:00:00
Thanekar Palacio Phase IIThanekar Construction LLPSurvey No. 82/2/1 Survey No 83/3/6 Survey No 83/3/7 Survey No 83/4A Plot No 3 5 6 & 731-12-2026 00:00:00
RUKMANI RESIDENCYCLAY NEST DEVELOPERS42130831-12-2027 00:00:00
Shree Chintamani Co Op Hsg Soc LtdShree Ganesh Construction400602, Thane, Kumbharwada Shivaji Path31-03-2024 00:00:00
LAXMI ARCADESATISH KASHINATH GUJARATHI36231-12-2024 00:00:00
ARIHANT CITY PHASE-II - M BUILDINGARIHANT ENTERPRISES49/1P,49/2,49/3,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55P,55P,55P,56P30-06-2026 00:00:00
ARIHANT CITY PHASE-II - L BUILDINGARIHANT ENTERPRISES49/1P,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55P,55P,55P,56P30-06-2026 00:00:00
Panvelkar Estate - Oxford - Phase 1Panvelkar Infrastructures Private LimitedGut No.45/2,46/2,47,49/4,49/9,49/11,49/1230-12-2023 00:00:00
HIGHLAND SPRINGS B4- E WINGSIDDHI REAL ESTATE DEVELOPERS46/18Pt, 47/13Pt31-10-2019 00:00:00
Iris ShoppingHIRANANDANI PROPERTIES PRIVATE LIMITED47/1 Pt, 52/8 And 52/1430-03-2023 00:00:00
Veer GalaxyYash InfraSector 2 , 108/4C , 108/4D31-07-2025 00:00:00
PRIYANKA AVENUEPRIYANKA REGENCY LLPPlot No 29 Sector 1531-03-2028 00:00:00
SAURABH HEIGHTSS K DEVELOPERSS. No. 81 H No.14 P .No 1/B31-03-2026 00:00:00
KRISHNAPINGAKSHAPRASHANT TUKARAM BAEETS No 51 , H No 2/A/26 , Plot No 2631-12-2026 00:00:00
Navsundaram Co Op Hsg SocietySHREEKANTH DEVELOPERSS No 4 ,H No 18 , Plot No 2 & Plot No 331-03-2026 00:00:00
OM ASHISH CHSGREEN HEIGHTS INFRA42150331-12-2025 00:00:00
Shapoorji Pallonji Skyraa at Northern LightsJaykali Developers Private Limited509 And 510/A31-12-2027 00:00:00
Dosti West County - Dosti Nest - Phase 2DOSTI ENTERPRISES25/7(Pt) 25/9(Pt) 25/10A(Pt) 44/1(Pt) 43/1(Pt)30-06-2027 00:00:00
UMIYA NAKSHATRA HEIGHTSM/S. JIGAR ENTERPRISES No/H No 64/2 And 64/1/431-12-2027 00:00:00
Shiv ganga ApartmentSHREE SWAMI SAMARTH CONSTRUCTION21534, 21552 Plot No. 253 Section - 3 A31-12-2024 00:00:00
Thanekar Civic Phase IIThanekar Construction LLPSurvey No. 133 Hissa No. 230-12-2024 00:00:00
OM DATTATRAY CHS LTDSHIV SHAKTI DEVELOPERSPlot No 13/Cts No 747431-12-2024 00:00:00
Krishna Vihar Co-operative Housing Society LimitedBAL GANAPATI LAABH DEVELOPERSCts Nos 20/7 And 33A T No 1630-12-2021 00:00:00
YASHANAND CHSL OJASS CONSTRUCTIONSOJASS CONSTRUCTIONSCts No. 4030-03-2022 00:00:00
Orion - Northern LightsJaykali Developers Private LimitedS No 509 And 510 P30-03-2025 00:00:00
SanyogAditya AssociatesCts No. 84, Tika No. 1530-06-2023 00:00:00
SACHINAM CO OP HSG SOCIETYSHREEKANTH DEVELOPERSS No 4 , H No 18 , Plot No 431-03-2024 00:00:00
Krishna KunjShashank C Mishra HufB K No A-513, Ulhasnagar, 421004, Thane31-12-2023 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private LimitedSdhmz3mxcw03dhiju4bavl/Et8gjynir/Dainywsuuqkgzgq/3Vum3wgdvgfwirivoqyznzrzpmlqj8y2+C3ksmhpbxdjcdozdtwuhtj6j0=30-12-2023 00:00:00
Highland Springs B4- A WingSiddhi Real Estate DevelopersItnnlir/5Ndohql7byawuw==30-06-2023 00:00:00
Omega - Northern LightsJaykali Developers Private LimitedS No 509 And 510 P30-03-2025 00:00:00
Royal EmpireSAI POOJA CONSTRUCTIONSS No 184 H No 2A30-12-2024 00:00:00
Guru SakshatSADGURU ENTERPRISESPlot No 3 Gut No 46/3 H No 4 And 530-12-2025 00:00:00
Poddar Wondercity Phase - ViPoddar Housing And Development Limited42150330-06-2024 00:00:00
Poddar Wondercity Phase - IiPoddar Housing And Development Limited42150330-06-2022 00:00:00
PODDAR WONDERCITY PHASE - IPoddar Housing and Development LimitedS No 29 H No 230-09-2023 00:00:00
Poddar Wondercity Phase - IiiPoddar Housing And Development Limited42150330-09-2024 00:00:00
Poddar Wondercity Phase - IvPoddar Housing And Development LimitedJoveli Village31-07-2023 00:00:00
Poddar Wondercity Phase - VPoddar Housing And Development Limited42150330-06-2024 00:00:00
Lodha Amara - Wing 40 and 41LODHA DEVELOPERS LIMITED64 By 2 And 64 By 329-11-2024 00:00:00
PALAVA SERENITY ALodha Developers Limited64 By 1 Pt28-11-2025 00:00:00
25HOURLIFE - Tower B1RUNWAL DEVELOPERS PRIVATE LIMITED2/2 (Part) & 2/5 (Part)31-12-2029 00:00:00
25HOURLIFE - Tower C1RUNWAL DEVELOPERS PRIVATE LIMITED2/2 (Part) & 2/5 (Part)31-12-2029 00:00:00
Siddhivinayak Prasad CO-OP.Housing Soc.LtdShaurya DevelopersS.No.49 ,H .No.18/8 , Old Plot No.331-12-2026 00:00:00
Shanti ParkV R Realties3Mjpm7cijthzh8hzispjla==01-12-2021 00:00:00
M K Thakur Complex Phase 1Vraj Ratan Buildcon Pvt LtdSurvey No 77 1A 2 4 501-12-2021 00:00:00
ORION BUSINESS PARKNEMINATH ENTERPRISESGut No 33 Pt31-03-2019 00:00:00
AUDUMBER CROWNAUDUMBER BUILDERS & DEVELOPERSS No 25, H No3/3, Plot No 131-12-2026 00:00:00
SRINATHJI VISHWASHREESrinathji ConstructionsTika No 8, Cts No 13/A/131-12-2025 00:00:00
PUSHPA ENCLAVETIRUPATI DEVELOPERSMira Road East31-12-2025 00:00:00
UPPER THANE -SERENO A1LODHA DEVELOPERS LIMITED35/1P31-07-2024 00:00:00
ASMEETA TEXPA - IIMAGUS INFRATECH PRIVATE LIMITED130-12-2030 00:00:00
JANKI LEGACYMihir Nandkumar papaiya250 4,250 3,249 7,249 622-04-2026 00:00:00
The Icon Phase 2Leading Frontier Private Limited61/2B30-06-2026 00:00:00
Om ShikharVaidik DevelopersDiva Vasai Railway Track Road01-05-2022 00:00:00
AVESAJAGDALE INFRASTRUCTURE PVT. LTD.50602-10-2026 00:00:00
RAJ HEIGHT A WINGBhavani Enterprises98/131-12-2019 00:00:00
Oyster - Shapoorji Pallonji Northern LightsJaykali Developers Private LimitedS. No. 509 And 510P30-09-2025 00:00:00
GAJANAN SAMRUDDHI PHASE II C WINGSHREE GAJANAN DEVELOPERS100 Feet Road30-12-2023 00:00:00
Ekatva CoralSynergy DevelopersCts 39A/1 Plot 394 / D / 3-431-12-2025 00:00:00
24 EASTMALHAR DEVELOPERSPlot 2430-06-2026 00:00:00
HARSHAL CO-OP HOUSING SOCIETY LTDVEENA DEVELOPERS3430-09-2024 00:00:00
Project Details
  • Project:
    Orion -3
  • Location:
  • F7b5n+Vdhiewhgy8xkqshy7c08xoixolqesbjw3jzhdsoneadu82tpsiklfcpm5s2s+58Svab97/R1kjxwfeka==
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2020
Developer Details

  • Developer:
    Vijay Suraksha Realty Llp
  • Phone:
  • Address:
  • Marine Chambers
Project RERA Details
MAHA REARA No: P51700006838
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect M/S. Scapes Architects
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Dec 2020
Revised Possession 30 Dec 2020
Extended Possession 30 Oct 2021
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 13 Feb 2026
Orion -3 QR Code
Orion -3
MahaRERA - P51700006838
Apartment Details & Configuration
TypeArea
1 BHK82.96 Sq.mts. ( 893 Sq.ft. )
2 BHK90.54 Sq.mts. ( 975 Sq.ft. )
3 BHK112.79 Sq.mts. ( 1214 Sq.ft. )
4 BHK174.63 Sq.mts. ( 1880 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Orion -3last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Common Amenities like Gym Common room containing mirror wooden flooring for yoga or meditation Room65% completed
65% Complete
At 3Rd Recreation Flr. &Amp; Common For All Orion Bldg
Community Buildings100% completed
95% Complete
Club House Completed &Amp; Shared By Entire Layout
Electrical Meter Room, Sub-Station, Receiving Station75% completed
75% Complete
Elec. Meterroom Prop &Amp; Substation Shared By Layout
Energy management50% completed
50% Complete
Energy Efficient Lights &Amp; Dg Backup In Commonarea
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc.
Games room with carrom chess and cards65% completed
65% Complete
At 3Rd Recreation Flr. &Amp; Common For All Orion Bldg
Guest rooms and Recreational Hall65% completed
65% Complete
At 3Rd Recreation Flr. &Amp; Common For All Orion Bldg
Landscaping & Tree Planting90% completed
90% Complete
Shared By Entire Layout
Open Parking
Na
Reading room and Senior Citizen area small area and childproof room with soft rubber flooring65% completed
65% Complete
At 3Rd Recreation Flr. &Amp; Common For All Orion Bldg
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Common Stp Is Given And Shared By Entire Layout
Society Office50% completed
50% Complete
As Approved By Tmc
Solid Waste Management And Disposal100% completed
95% Complete
Owc Is Provided &Amp; Shared By All Orion Buildings
Storm Water Drains100% completed
95% Complete
To Be Given As Approved By Tmc
Street Lighting90% completed
90% Complete
To Be Given As Approved By Tmc
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Water Shall Be Used For Flushing &Amp; Gardening
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rwh Pit To Be Given As Approved By Tmc
Water Supply100% completed
95% Complete
Water Connection To Be Given By Tmc After Oc.
Buildings / Wings in Orion -3
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Orion -3 by Vijay Suraksha Realty Llplast updated on 13 Feb 2026 as per information obtained from MARA RERA.

5877 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

73 apartments in total
Total
73
Booked
13
Available
60

Saleable Area Statistics (Sq. ft.)

94127 Total
Total
94127
Booked
19111
Available
75016
Total 73 apartments in project. 13 apartments booked. 17% apartments booked.
Total 94127 Sq.ft. saleable area. 19111 saleable area booked.
20% area booked.

Orion-3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Orion-3Jun 20202410130161
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK82.96 Sq.mts. ( 893 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK90.54 Sq.mts. ( 975 Sq.ft. )8
None Booked0% Booked
0% Booked
3 BHK112.79 Sq.mts. ( 1214 Sq.ft. )42
4 BHK174.63 Sq.mts. ( 1880 Sq.ft. )15
5 Booked33% Booked
33% Booked
73 total apartments / 13 apartments booked. 17% apartments booked.
Work Description in Building Orion-3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Vijay Suraksha Realty Llp
for Project
Orion -3
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation