Optima is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007736. Optima is located at 400059. This is a On-Going Project being developed by Unirock Developers.
Optima has 1 BHK, 1.5 BHK & 2 BHK Apartments with carpet areas ranging from 435 to 682 Sq.ft. Carpet. The Project has total 146 of which 29 are currently available for sale.
Optima is being developed on a total land area of 23287 Sq.ft. out of which 1444 Sq.ft. i.e 6% is reserved for recreational purposes. Optima has 2 Wings / Towers Optima Rehab,Optima Sale
| Project | Developer | Location | Possession |
-
Project:
Optima
-
Location:
-
400059
-
Const. Stage:
On-Going Project
-
Possession:
31 Dec 2022
-
Developer:
Unirock Developers
-
Phone:
-
Address:
-
B Wing 1St Floor, Dudhwala Complex, 292, Bellasis Road, Near St Depot, Mumbai Central, 400008
| MAHA REARA No: |
P51800007736 |
| Project Type |
Residential |
| RERA Project Status |
On-Going Project |
| Architect |
D H Patel |
| Funding Bank |
ICICI BANK |
| Proposed Possession |
31 Dec 2022 |
| Revised Possession |
30 Dec 2023 |
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
12 Aug 2021 |
| Last Retrived |
28 Jul 2025 |
Optima QR Code
Optima
MahaRERA - P51800007736
| Type | Area |
| 1 BHK | 26.16 Sq.mts. ( 282 Sq.ft. ) |
| 1 BHK | 26.64 Sq.mts. ( 287 Sq.ft. ) |
| 1 BHK | 26.65 Sq.mts. ( 287 Sq.ft. ) |
| 1 BHK | 40.41 Sq.mts. ( 435 Sq.ft. ) |
| 1.5 BHK | 49.94 Sq.mts. ( 538 Sq.ft. ) |
| 1.5 BHK | 57.32 Sq.mts. ( 617 Sq.ft. ) |
| 2 BHK | 62.62 Sq.mts. ( 674 Sq.ft. ) |
| 2 BHK | 63.32 Sq.mts. ( 682 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Optimalast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Not Yet Commenced |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Not Yet Commenced |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Not Yet Commenced |
Landscaping & Tree Planting
|
|
Not Yet Commenced |
|
|
|
Not Yet Commenced |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Not Yet Commenced |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Not Yet Commenced |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Not Yet Commenced |
|
|
|
Not Yet Commenced |
Buildings / Wings in Optima
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Optima by Unirock Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
146
apartments in total
Saleable Area Statistics (Sq. ft.)
62505
Total
Total 146 apartments in project. 117 apartments booked. 80% apartments booked.
Total 62505 Sq.ft. saleable area. 44935 saleable area booked.
72% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Optima Rehab | Jan 1900 | 13 | 1 | 0 | 1 | 0 | 3 | 5 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 26.16 Sq.mts. ( 282 Sq.ft. ) | 26 | |
| 1 BHK | 26.64 Sq.mts. ( 287 Sq.ft. ) | 40 | |
| 1 BHK | 26.65 Sq.mts. ( 287 Sq.ft. ) | 11 | |
77 total apartments / 77 apartments booked. 100% apartments booked. |
| Work Description in Building Optima Rehab | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Optima Sale | Jan 1900 | 14 | 1 | 0 | 1 | 0 | 0 | 90 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 40.41 Sq.mts. ( 435 Sq.ft. ) | 14 | |
| 1.5 BHK | 49.94 Sq.mts. ( 538 Sq.ft. ) | 14 | |
| 1.5 BHK | 57.32 Sq.mts. ( 617 Sq.ft. ) | 14 | |
| 2 BHK | 62.62 Sq.mts. ( 674 Sq.ft. ) | 13 | |
| 2 BHK | 63.32 Sq.mts. ( 682 Sq.ft. ) | 14 | |
69 total apartments / 40 apartments booked. 57% apartments booked. |
| Work Description in Building Optima Sale | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Unirock Developers
for Project
Optima
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |