Project overview

One Kiyo Phase-I is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000002212. One Kiyo Phase-I is located at 94/1B. This is a Ongoing being developed by Onearth Creators Llp.

One Kiyo Phase-I has 1 RHK, 1RHK, 2RHK, Shop & Shops Apartments with carpet areas ranging from 126 to 465 Sq.ft. Carpet. The Project has total 66 of which 18 are currently available for sale.

One Kiyo Phase-I is being developed on a total land area of 87727 Sq.ft. out of which 6869 Sq.ft. i.e 8% is reserved for recreational purposes. One Kiyo Phase-I has 2 Wings / Towers Building No-1,Building No-2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    One Kiyo Phase-I
  • Location:
  • 94/1B
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2020
Developer Details

  • Developer:
    Onearth Creators Llp
  • Phone:
  • Address:
  • Anmol Mansion
Project RERA Details
MAHA REARA No: P52000002212
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2020
Revised Possession 30 Dec 2020
Extended Possession 31 Dec 2022
Litigations No Litigations
Last Modified 05 Aug 2022
Last Retrived 28 Jul 2025
One Kiyo Phase-I QR Code
One Kiyo Phase-I
MahaRERA - P52000002212
Apartment Details & Configuration
TypeArea
1 RHK29.76 Sq.mts. ( 320 Sq.ft. )
1RHK29.3 Sq.mts. ( 315 Sq.ft. )
2RHK40 Sq.mts. ( 431 Sq.ft. )
2RHK40.48 Sq.mts. ( 436 Sq.ft. )
2RHK41.78 Sq.mts. ( 450 Sq.ft. )
2RHK42 Sq.mts. ( 452 Sq.ft. )
2RHK42.21 Sq.mts. ( 454 Sq.ft. )
2RHK42.7 Sq.mts. ( 460 Sq.ft. )
2RHK43.17 Sq.mts. ( 465 Sq.ft. )
Shop11.67 Sq.mts. ( 126 Sq.ft. )
Shop14 Sq.mts. ( 151 Sq.ft. )
Shop14.5 Sq.mts. ( 156 Sq.ft. )
Shops15 Sq.mts. ( 161 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of One Kiyo Phase-Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Tp Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Msedcl Norms
Energy management
Solar Water Heater System
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Shall Be Done Along With Subsequent Phase
Open Parking
Two Wheeler Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Surface Drain System
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Water Supply
Borewell Water
Buildings / Wings in One Kiyo Phase-I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of One Kiyo Phase-I by Onearth Creators Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

87727 Sq. ft.

Project Area

6869 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

66 apartments in total
Total
66
Booked
48
Available
18

Saleable Area Statistics (Sq. ft.)

24733 Total
Total
24733
Booked
18549
Available
6184
Total 66 apartments in project. 48 apartments booked. 72% apartments booked.
Total 24733 Sq.ft. saleable area. 18549 saleable area booked.
75% area booked.

Building No-1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No-1Dec 20208101004
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RHK29.76 Sq.mts. ( 320 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RHK29.3 Sq.mts. ( 315 Sq.ft. )3
3 Booked100% Booked
100% Booked
2RHK40 Sq.mts. ( 431 Sq.ft. )3
3 Booked100% Booked
100% Booked
2RHK40.48 Sq.mts. ( 436 Sq.ft. )4
4 Booked100% Booked
100% Booked
2RHK41.78 Sq.mts. ( 450 Sq.ft. )3
3 Booked100% Booked
100% Booked
2RHK42 Sq.mts. ( 452 Sq.ft. )6
4 Booked66% Booked
66% Booked
2RHK42.21 Sq.mts. ( 454 Sq.ft. )3
3 Booked100% Booked
100% Booked
2RHK42.7 Sq.mts. ( 460 Sq.ft. )1
None Booked0% Booked
0% Booked
2RHK43.17 Sq.mts. ( 465 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.67 Sq.mts. ( 126 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14 Sq.mts. ( 151 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.5 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
31 total apartments / 25 apartments booked. 80% apartments booked.
Work Description in Building Building No-1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress65% done
65% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress30% done
30% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No-2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No-2Dec 20208101004
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RHK29.76 Sq.mts. ( 320 Sq.ft. )4
3 Booked75% Booked
75% Booked
1RHK29.3 Sq.mts. ( 315 Sq.ft. )3
3 Booked100% Booked
100% Booked
2RHK40 Sq.mts. ( 431 Sq.ft. )3
2 Booked66% Booked
66% Booked
2RHK40.48 Sq.mts. ( 436 Sq.ft. )4
3 Booked75% Booked
75% Booked
2RHK41.78 Sq.mts. ( 450 Sq.ft. )3
2 Booked66% Booked
66% Booked
2RHK42 Sq.mts. ( 452 Sq.ft. )6
4 Booked66% Booked
66% Booked
2RHK42.21 Sq.mts. ( 454 Sq.ft. )3
2 Booked66% Booked
66% Booked
2RHK42.7 Sq.mts. ( 460 Sq.ft. )1
None Booked0% Booked
0% Booked
2RHK43.17 Sq.mts. ( 465 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.67 Sq.mts. ( 126 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14 Sq.mts. ( 151 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.5 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
Shops15 Sq.mts. ( 161 Sq.ft. )4
3 Booked75% Booked
75% Booked
35 total apartments / 23 apartments booked. 65% apartments booked.
Work Description in Building Building No-2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress55% done
55% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Onearth Creators Llp
for Project
One Kiyo Phase-I
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation