Project overview

Om Siddhivinayak Chs Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800045417. Om Siddhivinayak Chs Ltd is located at 5Pt 5/3 5/4 5/5 5/6Pt 5/7Pt 6Pt 6/1 To 9 Of Village Kanjur 11Pt And 12Pt Of Village Bhandup. This is a New being developed by Shree Shiv Samarth Reality.

Om Siddhivinayak Chs Ltd has 1 BHK, 2 BHK, 3 BHK & Shop Apartments with carpet areas ranging from 119 to 634 Sq.ft. Carpet. The Project has total 217 of which 211 are currently available for sale.

Om Siddhivinayak Chs Ltd is being developed on a total land area of 50942 Sq.ft. out of which 5106 Sq.ft. i.e 10% is reserved for recreational purposes. Om Siddhivinayak Chs Ltd has 3 Wings / Towers Rehab Wing B,Rehab Wing C,Sale Wing A

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Om Siddhivinayak Chs Ltd
  • Location:
  • 5Pt 5/3 5/4 5/5 5/6Pt 5/7Pt 6Pt 6/1 To 9 Of Village Kanjur 11Pt And 12Pt Of Village Bhandup
  • Const. Stage:
    New
  • Possession:
    31 Dec 2028
Developer Details

  • Developer:
    Shree Shiv Samarth Reality
  • Phone:
  • Address:
  • Shh Residency
Project RERA Details
MAHA REARA No: P51800045417
Project Type Others
RERA Project Status New
Funding Bank DOMBIVLI NAGARI SAHAKARI BANK LIMITED
Proposed Possession 31 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 16 Sep 2024
Last Retrived 26 Jul 2025
Om Siddhivinayak Chs Ltd QR Code
Om Siddhivinayak Chs Ltd
MahaRERA - P51800045417
Apartment Details & Configuration
TypeArea
1RK19.97 Sq.mts. ( 215 Sq.ft. )
1RK20.62 Sq.mts. ( 222 Sq.ft. )
1RK22.3 Sq.mts. ( 240 Sq.ft. )
1RK0 Sq.mts. ( 0 Sq.ft. )
1 BHK34.39 Sq.mts. ( 370 Sq.ft. )
1 BHK34.85 Sq.mts. ( 375 Sq.ft. )
2 BHK45.26 Sq.mts. ( 487 Sq.ft. )
2 BHK47.3 Sq.mts. ( 509 Sq.ft. )
3 BHK58.92 Sq.mts. ( 634 Sq.ft. )
Shop11.06 Sq.mts. ( 119 Sq.ft. )
Shop11.15 Sq.mts. ( 120 Sq.ft. )
Shop11.52 Sq.mts. ( 124 Sq.ft. )
Shop13.01 Sq.mts. ( 140 Sq.ft. )
Shop14.31 Sq.mts. ( 154 Sq.ft. )
Shop15.98 Sq.mts. ( 172 Sq.ft. )
Shop16.45 Sq.mts. ( 177 Sq.ft. )
Shop26.85 Sq.mts. ( 289 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Om Siddhivinayak Chs Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Done As Per Approved Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Done As Per Msedcl Norms
Energy management
Will Be Completed As Per Moef Remarks
Fire Protection And Fire Safety Requirements
Will Be Completed As Per Cfo Remarks
Landscaping & Tree Planting
Will Be Completed Before Occ To Sale Wing A And B
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Completed As Per Spp&Amp; D Remarks Of Mcgm
Solid Waste Management And Disposal
Will Be Completed As Per Moef Remarks
Storm Water Drains
Will Be Completed As Per Swd Remarks Of Mcgm
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Will Be Completed As Per Moef Remarks
Water Conservation, Rain water Harvesting
Will Be Completed As Per Rwh Remarks
Water Supply
Will Be Obtained Before Occ
Buildings / Wings in Om Siddhivinayak Chs Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Om Siddhivinayak Chs Ltd by Shree Shiv Samarth Realitylast updated on 26 Jul 2025 as per information obtained from MARA RERA.

50942 Sq. ft.

Project Area

5106 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

217 apartments in total
Total
217
Booked
6
Available
211

Saleable Area Statistics (Sq. ft.)

69656 Total
Total
69656
Booked
1397
Available
68259
Total 217 apartments in project. 6 apartments booked. 2% apartments booked.
Total 69656 Sq.ft. saleable area. 1397 saleable area booked.
2% area booked.

Rehab Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Wing BDec 202821101300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK19.97 Sq.mts. ( 215 Sq.ft. )41
1RK20.62 Sq.mts. ( 222 Sq.ft. )31
1RK22.3 Sq.mts. ( 240 Sq.ft. )14
4 Booked28% Booked
28% Booked
86 total apartments / 6 apartments booked. 6% apartments booked.
Work Description in Building Rehab Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress49% done
49% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked

Rehab Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Wing CDec 20280000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Rehab Wing CCompletion
Basement (if any)
work-in-progress75% done
75% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress75% done
75% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress75% done
75% Booked
X number of Podiums
X number of Slabs of Super Structure

Sale Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Wing ADec 202816101300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.39 Sq.mts. ( 370 Sq.ft. )23
None Booked0% Booked
0% Booked
1 BHK34.85 Sq.mts. ( 375 Sq.ft. )74
None Booked0% Booked
0% Booked
2 BHK45.26 Sq.mts. ( 487 Sq.ft. )15
None Booked0% Booked
0% Booked
2 BHK47.3 Sq.mts. ( 509 Sq.ft. )10
None Booked0% Booked
0% Booked
3 BHK58.92 Sq.mts. ( 634 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.06 Sq.mts. ( 119 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.15 Sq.mts. ( 120 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.52 Sq.mts. ( 124 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.01 Sq.mts. ( 140 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.31 Sq.mts. ( 154 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.98 Sq.mts. ( 172 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.45 Sq.mts. ( 177 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.85 Sq.mts. ( 289 Sq.ft. )1
None Booked0% Booked
0% Booked
131 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sale Wing ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shree Shiv Samarth Reality
for Project
Om Siddhivinayak Chs Ltd
last updated on 26 Jul 2025 as per information obtained from MARA RERA.