Project overview

Olympus Towers is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000053989. Olympus Towers is located at 275/1 And 275/2. This is a New being developed by Majesty Developers.

Olympus Towers has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 1090 to 892 Sq.ft. Carpet. The Project has total 328 of which 324 are currently available for sale.

Olympus Towers is being developed on a total land area of 17667 Sq.ft. Olympus Towers has 2 Wings / Towers Wing B,Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Olympus Towers
  • Location:
  • 275/1 And 275/2
  • Const. Stage:
    New
  • Possession:
    30 Jun 2028
Developer Details

  • Developer:
    Majesty Developers
  • Phone:
  • Address:
  • Shubh Chsl
Project RERA Details
MAHA REARA No: P99000053989
Project Type Others
RERA Project Status New
Architect Sanat Mehta And Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Jun 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 18 Dec 2023
Last Retrived 28 Jul 2025
Olympus Towers QR Code
Olympus Towers
MahaRERA - P99000053989
Apartment Details & Configuration
TypeArea
1 BHK29.77 Sq.mts. ( 320 Sq.ft. )
1 BHK29.78 Sq.mts. ( 321 Sq.ft. )
1 BHK29.84 Sq.mts. ( 321 Sq.ft. )
1 BHK35.99 Sq.mts. ( 387 Sq.ft. )
1 BHK37.3 Sq.mts. ( 401 Sq.ft. )
2 BHK46.24 Sq.mts. ( 498 Sq.ft. )
2 BHK47.05 Sq.mts. ( 506 Sq.ft. )
2 BHK49.91 Sq.mts. ( 537 Sq.ft. )
1 BHK29.08 Sq.mts. ( 313 Sq.ft. )
1 BHK35.35 Sq.mts. ( 381 Sq.ft. )
1 BHK35.41 Sq.mts. ( 381 Sq.ft. )
1 BHK37.4 Sq.mts. ( 403 Sq.ft. )
1 BHK49.73 Sq.mts. ( 535 Sq.ft. )
2 BHK46.55 Sq.mts. ( 501 Sq.ft. )
2 BHK47.39 Sq.mts. ( 510 Sq.ft. )
Shop56.68 Sq.mts. ( 610 Sq.ft. )
Shop82.83 Sq.mts. ( 892 Sq.ft. )
Shop101.23 Sq.mts. ( 1090 Sq.ft. )
Shop145.98 Sq.mts. ( 1571 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Olympus Towerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Provided
Energy management
Will Be Provided
Fire Protection And Fire Safety Requirements
Will Be Provided
Landscaping & Tree Planting
Will Be Done
Open Parking
Will Be Provided
Sewerage (Chamber, Lines, Septic Tank , STP)
Chamber Lines And Stp Will Be Provided
Solid Waste Management And Disposal
Will Be Done
Storm Water Drains
Will Be Provided
Street Lighting
Will Be Done
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Will Be Provided
Water Supply
Wil Be Provided
Buildings / Wings in Olympus Towers
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Olympus Towers by Majesty Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

17667 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

328 apartments in total
Total
328
Booked
4
Available
324

Saleable Area Statistics (Sq. ft.)

139505 Total
Total
139505
Booked
2010
Available
137495
Total 328 apartments in project. 4 apartments booked. 1% apartments booked.
Total 139505 Sq.ft. saleable area. 2010 saleable area booked.
1% area booked.

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 202828101110676
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.77 Sq.mts. ( 320 Sq.ft. )27
None Booked0% Booked
0% Booked
1 BHK29.78 Sq.mts. ( 321 Sq.ft. )27
None Booked0% Booked
0% Booked
1 BHK29.84 Sq.mts. ( 321 Sq.ft. )27
None Booked0% Booked
0% Booked
1 BHK35.99 Sq.mts. ( 387 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK37.3 Sq.mts. ( 401 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK46.24 Sq.mts. ( 498 Sq.ft. )23
None Booked0% Booked
0% Booked
2 BHK47.05 Sq.mts. ( 506 Sq.ft. )27
None Booked0% Booked
0% Booked
2 BHK49.91 Sq.mts. ( 537 Sq.ft. )23
162 total apartments / 1 apartments booked. 0% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress38% done
38% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress27% done
27% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 202828101110532
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.08 Sq.mts. ( 313 Sq.ft. )27
None Booked0% Booked
0% Booked
1 BHK29.77 Sq.mts. ( 320 Sq.ft. )27
None Booked0% Booked
0% Booked
1 BHK35.35 Sq.mts. ( 381 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.41 Sq.mts. ( 381 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK37.4 Sq.mts. ( 403 Sq.ft. )27
1 BHK49.73 Sq.mts. ( 535 Sq.ft. )27
2 BHK46.55 Sq.mts. ( 501 Sq.ft. )23
None Booked0% Booked
0% Booked
2 BHK47.39 Sq.mts. ( 510 Sq.ft. )23
None Booked0% Booked
0% Booked
Shop56.68 Sq.mts. ( 610 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop82.83 Sq.mts. ( 892 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop101.23 Sq.mts. ( 1090 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop145.98 Sq.mts. ( 1571 Sq.ft. )1
None Booked0% Booked
0% Booked
166 total apartments / 3 apartments booked. 1% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress38% done
38% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress27% done
27% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Majesty Developers
for Project
Olympus Towers
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation