Nirvan is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800031488. Nirvan is located at E 106 And E 110. This is a New being developed by M/S Aum Nirvan.

Nirvan has 3 BHK, 4 BHK & 5 BHK & more Apartments with carpet areas ranging from 1625 to 3880 Sq.ft. Carpet. The Project has total 13 of which 2 are currently available for sale.

Nirvan is being developed on a total land area of 20556 Sq.ft. out of which 4012 Sq.ft. i.e 20% is reserved for recreational purposes. Nirvan has 1 Wings / Towers Nirvan

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nirvan
  • Location:
  • E 106 And E 110
  • Const. Stage:
    New
  • Possession:
    31 Mar 2025
Developer Details

  • Developer:
    M/S Aum Nirvan
  • Phone:
  • Address:
  • Sidrah 5Th Floor
Project RERA Details
MAHA REARA No: P51800031488
Project Type Residential / Group Housing
RERA Project Status New
Architect Yms Consultants Limited
Funding Bank HDFC BANK
Proposed Possession 31 Mar 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 25 Oct 2021
Last Retrived 26 Jul 2025
Nirvan QR Code
Nirvan
MahaRERA - P51800031488
Apartment Details & Configuration
TypeArea
3 BHK150.96 Sq.mts. ( 1625 Sq.ft. )
4 BHK178.69 Sq.mts. ( 1923 Sq.ft. )
4 BHK360.45 Sq.mts. ( 3880 Sq.ft. )
5 BHK & more360.47 Sq.mts. ( 3880 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nirvanlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Mcgm
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approval
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Approval
Landscaping & Tree Planting
As Per Sg Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approval
Solid Waste Management And Disposal
As Per Approval
Storm Water Drains
As Per Approval
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Approval
Water Supply
As Per Approval
Buildings / Wings in Nirvan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nirvan by M/S Aum Nirvanlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

20556 Sq. ft.

Project Area

4012 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

13 apartments in total
Total
13
Booked
11
Available
2

Saleable Area Statistics (Sq. ft.)

30277 Total
Total
30277
Booked
22517
Available
7760
Total 13 apartments in project. 11 apartments booked. 84% apartments booked.
Total 30277 Sq.ft. saleable area. 22517 saleable area booked.
74% area booked.

Nirvan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
NirvanMar 202519121101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK150.96 Sq.mts. ( 1625 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK178.69 Sq.mts. ( 1923 Sq.ft. )8
8 Booked100% Booked
100% Booked
4 BHK360.45 Sq.mts. ( 3880 Sq.ft. )2
None Booked0% Booked
0% Booked
5 BHK & more360.47 Sq.mts. ( 3880 Sq.ft. )1
1 Booked100% Booked
100% Booked
13 total apartments / 11 apartments booked. 84% apartments booked.
Work Description in Building NirvanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress87% done
87% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M/S Aum Nirvan
for Project
Nirvan
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation