Project overview

Ninestar Crown Bldg No2 Ruby is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000046388. Ninestar Crown Bldg No2 Ruby is located at Gut No 203/2, Gut No 268/1, Gut No 271. This is a New being developed by Nine Homemakers.

Ninestar Crown Bldg No2 Ruby has 1 BHK & 2 BHK Apartments with carpet areas ranging from 390 to 469 Sq.ft. Carpet. The Project has total 62 of which 62 are currently available for sale.

Ninestar Crown Bldg No2 Ruby is being developed on a total land area of 34171 Sq.ft. Ninestar Crown Bldg No2 Ruby has 2 Wings / Towers Bldg No 2 Ruby Wing A,Bldg No 2 Ruby Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ninestar Crown Bldg No2 Ruby
  • Location:
  • Gut No 203/2, Gut No 268/1, Gut No 271
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Nine Homemakers
  • Phone:
  • Address:
  • Ninestar Landmark
Project RERA Details
MAHA REARA No: P99000046388
Project Type Residential / Group Housing
RERA Project Status New
Architect Roshan Patil
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 18 Jul 2025
Last Retrived 28 Jul 2025
Ninestar Crown Bldg No2 Ruby QR Code
Ninestar Crown Bldg No2 Ruby
MahaRERA - P99000046388
Apartment Details & Configuration
TypeArea
1 BHK33.75 Sq.mts. ( 363 Sq.ft. )
1 BHK36.2 Sq.mts. ( 390 Sq.ft. )
2 BHK43.6 Sq.mts. ( 469 Sq.ft. )
2 BHK48.99 Sq.mts. ( 527 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ninestar Crown Bldg No2 Rubylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Stp
Water Conservation, Rain water Harvesting
0
Water Supply
Boring
Buildings / Wings in Ninestar Crown Bldg No2 Ruby
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ninestar Crown Bldg No2 Ruby by Nine Homemakerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

34171 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

62 apartments in total
Total
62
Booked
0
Available
62

Saleable Area Statistics (Sq. ft.)

27392 Total
Total
27392
Booked
0
Available
27392
Total 62 apartments in project. 0 apartments booked. 0% apartments booked.
Total 27392 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Bldg No 2 Ruby Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 2 Ruby Wing ADec 20268000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.75 Sq.mts. ( 363 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK36.2 Sq.mts. ( 390 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK43.6 Sq.mts. ( 469 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK48.99 Sq.mts. ( 527 Sq.ft. )15
None Booked0% Booked
0% Booked
31 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 2 Ruby Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Bldg No 2 Ruby Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 2 Ruby Wing BDec 20268000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.2 Sq.mts. ( 390 Sq.ft. )23
None Booked0% Booked
0% Booked
2 BHK43.6 Sq.mts. ( 469 Sq.ft. )8
None Booked0% Booked
0% Booked
31 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 2 Ruby Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Nine Homemakers
for Project
Ninestar Crown Bldg No2 Ruby
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation