Project overview

Nine Start Pride 1 Building No. 02 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000020407. Nine Start Pride 1 Building No. 02 is located at Gut No 224, Gut No2262, Gut No 2263. This is a New being developed by Nine Home Developers.

Nine Start Pride 1 Building No. 02 has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 172 to 409 Sq.ft. Carpet. The Project has total 60 of which 38 are currently available for sale.

Nine Start Pride 1 Building No. 02 is being developed on a total land area of 22689 Sq.ft. Nine Start Pride 1 Building No. 02 has 2 Wings / Towers Building N0 02 Wing A,Building No 02 Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nine Start Pride 1 Building No. 02
  • Location:
  • Gut No 224, Gut No2262, Gut No 2263
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Nine Home Developers
  • Phone:
  • Address:
  • Nine Star Pride 1, Central Park
Project RERA Details
MAHA REARA No: P99000020407
Project Type Residential / Group Housing
RERA Project Status New
Architect Ar Roshan Patil
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Apr 2019
Last Retrived 28 Jul 2025
Nine Start Pride 1 Building No. 02 QR Code
Nine Start Pride 1 Building No. 02
MahaRERA - P99000020407
Apartment Details & Configuration
TypeArea
1 BHK24.54 Sq.mts. ( 264 Sq.ft. )
1 BHK27.73 Sq.mts. ( 298 Sq.ft. )
2 BHK39.57 Sq.mts. ( 426 Sq.ft. )
1RK16.01 Sq.mts. ( 172 Sq.ft. )
2 BHK38.03 Sq.mts. ( 409 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nine Start Pride 1 Building No. 02last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric As Per Msedcl
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
.
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
.
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Water Supply
Borwell
Buildings / Wings in Nine Start Pride 1 Building No. 02
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nine Start Pride 1 Building No. 02 by Nine Home Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

22689 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

60 apartments in total
Total
60
Booked
22
Available
38

Saleable Area Statistics (Sq. ft.)

17635 Total
Total
17635
Booked
6938
Available
10697
Total 60 apartments in project. 22 apartments booked. 36% apartments booked.
Total 17635 Sq.ft. saleable area. 6938 saleable area booked.
39% area booked.

Building N0 02 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building N0 02 Wing ADec 20235100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.54 Sq.mts. ( 264 Sq.ft. )20
5 Booked25% Booked
25% Booked
1 BHK27.73 Sq.mts. ( 298 Sq.ft. )5
2 Booked40% Booked
40% Booked
2 BHK39.57 Sq.mts. ( 426 Sq.ft. )5
3 Booked60% Booked
60% Booked
30 total apartments / 10 apartments booked. 33% apartments booked.
Work Description in Building Building N0 02 Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 02 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 02 Wing BDec 20235100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.54 Sq.mts. ( 264 Sq.ft. )19
5 Booked26% Booked
26% Booked
1 BHK27.73 Sq.mts. ( 298 Sq.ft. )5
4 Booked80% Booked
80% Booked
1RK16.01 Sq.mts. ( 172 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK38.03 Sq.mts. ( 409 Sq.ft. )5
3 Booked60% Booked
60% Booked
30 total apartments / 12 apartments booked. 40% apartments booked.
Work Description in Building Building No 02 Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Nine Home Developers
for Project
Nine Start Pride 1 Building No. 02
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation