Project overview

Nine Star Residency - Imperia is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000015888. Nine Star Residency - Imperia is located at Gut No - 246/2/1. This is a New being developed by M/S A.K. Developers.

Nine Star Residency - Imperia has FLAT Apartments with carpet areas ranging from 354 to 492 Sq.ft. Carpet. The Project has total 24 of which 24 are currently available for sale.

Nine Star Residency - Imperia is being developed on a total land area of 11571 Sq.ft. Nine Star Residency - Imperia has 1 Wings / Towers Imperia

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nine Star Residency - Imperia
  • Location:
  • Gut No - 246/2/1
  • Const. Stage:
    New
  • Possession:
    30 Mar 2022
Developer Details

  • Developer:
    M/S A.K. Developers
  • Phone:
  • Address:
  • Mukadam Compound
Project RERA Details
MAHA REARA No: P99000015888
Project Type Residential / Group Housing
RERA Project Status New
Architect Vasturachna Consultants
Funding Bank THE SHAMRAO VITHAL COOPERATIVE BANK
Proposed Possession 30 Mar 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Mar 2018
Last Retrived 28 Jul 2025
Nine Star Residency - Imperia QR Code
Nine Star Residency - Imperia
MahaRERA - P99000015888
Apartment Details & Configuration
TypeArea
FLAT32.93 Sq.mts. ( 354 Sq.ft. )
FLAT33.37 Sq.mts. ( 359 Sq.ft. )
FLAT45.74 Sq.mts. ( 492 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nine Star Residency - Imperialast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Room Will Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Yet To Be Provided
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank And Chamber Will Be Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Be Provided
Street Lighting
As
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harwesting Provided
Water Supply
Yet To Be Provided
Buildings / Wings in Nine Star Residency - Imperia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nine Star Residency - Imperia by M/S A.K. Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

11571 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
0
Available
24

Saleable Area Statistics (Sq. ft.)

9077 Total
Total
9077
Booked
0
Available
9077
Total 24 apartments in project. 0 apartments booked. 0% apartments booked.
Total 9077 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Imperia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ImperiaMar 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT32.93 Sq.mts. ( 354 Sq.ft. )16
None Booked0% Booked
0% Booked
FLAT33.37 Sq.mts. ( 359 Sq.ft. )4
None Booked0% Booked
0% Booked
FLAT45.74 Sq.mts. ( 492 Sq.ft. )4
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building ImperiaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress43% done
43% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M/S A.K. Developers
for Project
Nine Star Residency - Imperia
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation