Project overview

Nine Star Pride Ii Building No. 06 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000026178. Nine Star Pride Ii Building No. 06 is located at Gut No. 224, 2262, 2263. This is a New being developed by Nine Home Realtors.

Nine Star Pride Ii Building No. 06 has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 170 to 409 Sq.ft. Carpet. The Project has total 60 of which 42 are currently available for sale.

Nine Star Pride Ii Building No. 06 is being developed on a total land area of 20644 Sq.ft. Nine Star Pride Ii Building No. 06 has 2 Wings / Towers Pride Ii Building No 06 Wing A,Pride Ii Building No 06 Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nine Star Pride Ii Building No. 06
  • Location:
  • Gut No. 224, 2262, 2263
  • Const. Stage:
    New
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Nine Home Realtors
  • Phone:
  • Address:
  • Nine Star Pride 2 Central Park
Project RERA Details
MAHA REARA No: P99000026178
Project Type Residential / Group Housing
RERA Project Status New
Architect Ar Roshan Patil
Funding Bank VASAI VIKAS SAHAKARI BANK LIMITED
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 25 Aug 2020
Last Retrived 28 Jul 2025
Nine Star Pride Ii Building No. 06 QR Code
Nine Star Pride Ii Building No. 06
MahaRERA - P99000026178
Apartment Details & Configuration
TypeArea
1 BHK24.54 Sq.mts. ( 264 Sq.ft. )
1 BHK27.73 Sq.mts. ( 298 Sq.ft. )
1RK15.81 Sq.mts. ( 170 Sq.ft. )
2 BHK38.03 Sq.mts. ( 409 Sq.ft. )
1RK16.01 Sq.mts. ( 172 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nine Star Pride Ii Building No. 06last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space 100% completed
95% Complete
.
Community Buildings
.
Electrical Meter Room, Sub-Station, Receiving Station
Electric As Per Mesb
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting50% completed
50% Complete
.
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
.
Solid Waste Management And Disposal
Na
Storm Water Drains
.
Street Lighting100% completed
95% Complete
.
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
.
Water Supply
Borewell
Buildings / Wings in Nine Star Pride Ii Building No. 06
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nine Star Pride Ii Building No. 06 by Nine Home Realtorslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

20644 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

60 apartments in total
Total
60
Booked
18
Available
42

Saleable Area Statistics (Sq. ft.)

15673 Total
Total
15673
Booked
4003
Available
11670
Total 60 apartments in project. 18 apartments booked. 30% apartments booked.
Total 15673 Sq.ft. saleable area. 4003 saleable area booked.
26% area booked.

Pride Ii Building No 06 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pride Ii Building No 06 Wing ADec 20235100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.54 Sq.mts. ( 264 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.73 Sq.mts. ( 298 Sq.ft. )5
None Booked0% Booked
0% Booked
1RK15.81 Sq.mts. ( 170 Sq.ft. )10
7 Booked70% Booked
70% Booked
2 BHK38.03 Sq.mts. ( 409 Sq.ft. )5
3 Booked60% Booked
60% Booked
30 total apartments / 10 apartments booked. 33% apartments booked.
Work Description in Building Pride Ii Building No 06 Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Pride Ii Building No 06 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pride Ii Building No 06 Wing BDec 20235100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.54 Sq.mts. ( 264 Sq.ft. )9
1 BHK27.73 Sq.mts. ( 298 Sq.ft. )5
1 Booked20% Booked
20% Booked
1RK15.81 Sq.mts. ( 170 Sq.ft. )10
6 Booked60% Booked
60% Booked
1RK16.01 Sq.mts. ( 172 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK38.03 Sq.mts. ( 409 Sq.ft. )5
None Booked0% Booked
0% Booked
30 total apartments / 8 apartments booked. 26% apartments booked.
Work Description in Building Pride Ii Building No 06 Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Nine Home Realtors
for Project
Nine Star Pride Ii Building No. 06
last updated on 28 Jul 2025 as per information obtained from MARA RERA.