Project overview
Nine Star Landmark Ph Iii Bldg 6 Lotus is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000013155. Nine Star Landmark Ph Iii Bldg 6 Lotus is located at 198/1A. This is a New being developed by Nine Homemakers.
Nine Star Landmark Ph Iii Bldg 6 Lotus has RESIDENTIAL Apartments with carpet areas ranging from 7297 to 7297 Sq.ft. Carpet. The Project has total 114 of which 114 are currently available for sale.
Nine Star Landmark Ph Iii Bldg 6 Lotus is being developed on a total land area of 38040 Sq.ft. Nine Star Landmark Ph Iii Bldg 6 Lotus has 4 Wings / Towers Lotus Wing-A,Lotus Wing-B,Lotus Wing-C,Lotus Wing-D
| Project | Developer | Location | Possession |
-
Developer:
Nine Homemakers
-
Phone:
-
Address:
-
.
| MAHA REARA No: |
P99000013155 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
Ar Roshan Patil |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
30 Dec 2021 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
15 Sep 2017 |
| Last Retrived |
28 Jul 2025 |
Nine Star Landmark Ph Iii Bldg 6 Lotus QR Code
Nine Star Landmark Ph Iii Bldg 6 Lotus
MahaRERA - P99000013155
| Type | Area |
| RESIDENTIAL | 677.89 Sq.mts. ( 7297 Sq.ft. ) |
| RESIDENTIAL | 701.69 Sq.mts. ( 7553 Sq.ft. ) |
| RESIDENTIAL | 753.25 Sq.mts. ( 8108 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Nine Star Landmark Ph Iii Bldg 6 Lotuslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
|
|
|
Borewell / Grampanchayat |
Water Conservation, Rain water Harvesting
|
|
Rain Water Harvesting |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
|
|
|
. |
|
|
|
. |
Solid Waste Management And Disposal
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Septic Tank |
|
|
|
Na |
Landscaping & Tree Planting
|
|
. |
Fire Protection And Fire Safety
Requirements
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Electric Work As Per Msedcl |
|
|
|
Na |
Aggregate area of recreational Open Space
|
|
Na |
Buildings / Wings in Nine Star Landmark Ph Iii Bldg 6 Lotus
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nine Star Landmark Ph Iii Bldg 6 Lotus by Nine Homemakerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
114
apartments in total
Saleable Area Statistics (Sq. ft.)
863344
Total
Total 114 apartments in project. 0 apartments booked. 0% apartments booked.
Total 863344 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Lotus Wing-A | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 677.89 Sq.mts. ( 7297 Sq.ft. ) | 28 | |
28 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Lotus Wing-A | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Lotus Wing-B | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 701.69 Sq.mts. ( 7553 Sq.ft. ) | 28 | |
28 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Lotus Wing-B | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Lotus Wing-C | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 753.25 Sq.mts. ( 8108 Sq.ft. ) | 30 | |
30 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Lotus Wing-C | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Lotus Wing-D | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 677.89 Sq.mts. ( 7297 Sq.ft. ) | 28 | |
28 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Lotus Wing-D | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Nine Homemakers
for Project
Nine Star Landmark Ph Iii Bldg 6 Lotus
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |