Project overview

Nine Star Landmark Ph Iii Bldg 6 Lotus is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000013155. Nine Star Landmark Ph Iii Bldg 6 Lotus is located at 198/1A. This is a New being developed by Nine Homemakers.

Nine Star Landmark Ph Iii Bldg 6 Lotus has RESIDENTIAL Apartments with carpet areas ranging from 7297 to 7297 Sq.ft. Carpet. The Project has total 114 of which 114 are currently available for sale.

Nine Star Landmark Ph Iii Bldg 6 Lotus is being developed on a total land area of 38040 Sq.ft. Nine Star Landmark Ph Iii Bldg 6 Lotus has 4 Wings / Towers Lotus Wing-A,Lotus Wing-B,Lotus Wing-C,Lotus Wing-D

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nine Star Landmark Ph Iii Bldg 6 Lotus
  • Location:
  • 198/1A
  • Const. Stage:
    New
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Nine Homemakers
  • Phone:
  • Address:
  • .
Project RERA Details
MAHA REARA No: P99000013155
Project Type Residential / Group Housing
RERA Project Status New
Architect Ar Roshan Patil
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Sep 2017
Last Retrived 28 Jul 2025
Nine Star Landmark Ph Iii Bldg 6 Lotus QR Code
Nine Star Landmark Ph Iii Bldg 6 Lotus
MahaRERA - P99000013155
Apartment Details & Configuration
TypeArea
RESIDENTIAL677.89 Sq.mts. ( 7297 Sq.ft. )
RESIDENTIAL701.69 Sq.mts. ( 7553 Sq.ft. )
RESIDENTIAL753.25 Sq.mts. ( 8108 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nine Star Landmark Ph Iii Bldg 6 Lotuslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Borewell / Grampanchayat
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
.
Storm Water Drains
.
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Open Parking
Na
Landscaping & Tree Planting
.
Fire Protection And Fire Safety Requirements
Na
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Work As Per Msedcl
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Nine Star Landmark Ph Iii Bldg 6 Lotus
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nine Star Landmark Ph Iii Bldg 6 Lotus by Nine Homemakerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

38040 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

114 apartments in total
Total
114
Booked
0
Available
114

Saleable Area Statistics (Sq. ft.)

863344 Total
Total
863344
Booked
0
Available
863344
Total 114 apartments in project. 0 apartments booked. 0% apartments booked.
Total 863344 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Lotus Wing-A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lotus Wing-AJan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL677.89 Sq.mts. ( 7297 Sq.ft. )28
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lotus Wing-ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Lotus Wing-B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lotus Wing-BJan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL701.69 Sq.mts. ( 7553 Sq.ft. )28
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lotus Wing-BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Lotus Wing-C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lotus Wing-CJan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL753.25 Sq.mts. ( 8108 Sq.ft. )30
None Booked0% Booked
0% Booked
30 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lotus Wing-CCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Lotus Wing-D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lotus Wing-DJan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL677.89 Sq.mts. ( 7297 Sq.ft. )28
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lotus Wing-DCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Nine Homemakers
for Project
Nine Star Landmark Ph Iii Bldg 6 Lotus
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation