Project overview
Nine Star Landmark Ph-I Bldg-1 Aster is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000009255. Nine Star Landmark Ph-I Bldg-1 Aster is located at 198/1A. This is a Ongoing being developed by Nine Homemakers.
Nine Star Landmark Ph-I Bldg-1 Aster has COMMERCIAL & RESIDENTIAL Apartments with carpet areas ranging from 1459 to 6098 Sq.ft. Carpet. The Project has total 124 of which 124 are currently available for sale.
Nine Star Landmark Ph-I Bldg-1 Aster is being developed on a total land area of 36800 Sq.ft. Nine Star Landmark Ph-I Bldg-1 Aster has 4 Wings / Towers Aster Wing-A,Aster Wing-B,Aster Wing-C,Aster Wing-D
| Project | Developer | Location | Possession |
-
Developer:
Nine Homemakers
-
Phone:
-
Address:
-
.
| MAHA REARA No: |
P99000009255 |
| Project Type |
Others |
| RERA Project Status |
Ongoing |
| Architect |
Ar Roshan Patil |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
31 Dec 2019 |
| Revised Possession |
31 Dec 2019 |
| Extended Possession |
30 Dec 2021 |
| Litigations |
No Litigations |
| Last Modified |
09 Sep 2021 |
| Last Retrived |
28 Jul 2025 |
Nine Star Landmark Ph-I Bldg-1 Aster QR Code
Nine Star Landmark Ph-I Bldg-1 Aster
MahaRERA - P99000009255
| Type | Area |
| COMMERCIAL | 77.09 Sq.mts. ( 830 Sq.ft. ) |
| RESIDENTIAL | 616.35 Sq.mts. ( 6634 Sq.ft. ) |
| RESIDENTIAL | 701.69 Sq.mts. ( 7553 Sq.ft. ) |
| COMMERCIAL | 56 Sq.mts. ( 603 Sq.ft. ) |
| RESIDENTIAL | 548.4 Sq.mts. ( 5903 Sq.ft. ) |
| COMMERCIAL | 135.56 Sq.mts. ( 1459 Sq.ft. ) |
| RESIDENTIAL | 566.5 Sq.mts. ( 6098 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Nine Star Landmark Ph-I Bldg-1 Asterlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Electric As Per Msedcl |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
. |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Septic Tank |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
. |
|
|
|
. |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Rain Water Harvesting |
|
|
|
Borewell Water / Grampanchayat |
Buildings / Wings in Nine Star Landmark Ph-I Bldg-1 Aster
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nine Star Landmark Ph-I Bldg-1 Aster by Nine Homemakerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
124
apartments in total
Saleable Area Statistics (Sq. ft.)
696040
Total
Total 124 apartments in project. 0 apartments booked. 0% apartments booked.
Total 696040 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Aster Wing-A | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| COMMERCIAL | 77.09 Sq.mts. ( 830 Sq.ft. ) | 6 | |
| RESIDENTIAL | 616.35 Sq.mts. ( 6634 Sq.ft. ) | 26 | |
32 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Aster Wing-A | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Aster Wing-B | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENTIAL | 701.69 Sq.mts. ( 7553 Sq.ft. ) | 28 | |
28 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Aster Wing-B | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Aster Wing-C | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| COMMERCIAL | 56 Sq.mts. ( 603 Sq.ft. ) | 5 | |
| RESIDENTIAL | 548.4 Sq.mts. ( 5903 Sq.ft. ) | 24 | |
29 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Aster Wing-C | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Aster Wing-D | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| COMMERCIAL | 135.56 Sq.mts. ( 1459 Sq.ft. ) | 11 | |
| RESIDENTIAL | 566.5 Sq.mts. ( 6098 Sq.ft. ) | 24 | |
35 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Aster Wing-D | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Nine Homemakers
for Project
Nine Star Landmark Ph-I Bldg-1 Aster
last updated on
28 Jul 2025 as per information obtained from MARA RERA.