Project overview

Nine Star Landmark Ph-I Bldg-1 Aster is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000009255. Nine Star Landmark Ph-I Bldg-1 Aster is located at 198/1A. This is a Ongoing being developed by Nine Homemakers.

Nine Star Landmark Ph-I Bldg-1 Aster has COMMERCIAL & RESIDENTIAL Apartments with carpet areas ranging from 1459 to 6098 Sq.ft. Carpet. The Project has total 124 of which 124 are currently available for sale.

Nine Star Landmark Ph-I Bldg-1 Aster is being developed on a total land area of 36800 Sq.ft. Nine Star Landmark Ph-I Bldg-1 Aster has 4 Wings / Towers Aster Wing-A,Aster Wing-B,Aster Wing-C,Aster Wing-D

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nine Star Landmark Ph-I Bldg-1 Aster
  • Location:
  • 198/1A
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Nine Homemakers
  • Phone:
  • Address:
  • .
Project RERA Details
MAHA REARA No: P99000009255
Project Type Others
RERA Project Status Ongoing
Architect Ar Roshan Patil
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2021
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 28 Jul 2025
Nine Star Landmark Ph-I Bldg-1 Aster QR Code
Nine Star Landmark Ph-I Bldg-1 Aster
MahaRERA - P99000009255
Apartment Details & Configuration
TypeArea
COMMERCIAL77.09 Sq.mts. ( 830 Sq.ft. )
RESIDENTIAL616.35 Sq.mts. ( 6634 Sq.ft. )
RESIDENTIAL701.69 Sq.mts. ( 7553 Sq.ft. )
COMMERCIAL56 Sq.mts. ( 603 Sq.ft. )
RESIDENTIAL548.4 Sq.mts. ( 5903 Sq.ft. )
COMMERCIAL135.56 Sq.mts. ( 1459 Sq.ft. )
RESIDENTIAL566.5 Sq.mts. ( 6098 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nine Star Landmark Ph-I Bldg-1 Asterlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric As Per Msedcl
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
.
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
.
Street Lighting
.
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Water Supply
Borewell Water / Grampanchayat
Buildings / Wings in Nine Star Landmark Ph-I Bldg-1 Aster
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nine Star Landmark Ph-I Bldg-1 Aster by Nine Homemakerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

36800 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

124 apartments in total
Total
124
Booked
0
Available
124

Saleable Area Statistics (Sq. ft.)

696040 Total
Total
696040
Booked
0
Available
696040
Total 124 apartments in project. 0 apartments booked. 0% apartments booked.
Total 696040 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Aster Wing-A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Aster Wing-AJan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL77.09 Sq.mts. ( 830 Sq.ft. )6
None Booked0% Booked
0% Booked
RESIDENTIAL616.35 Sq.mts. ( 6634 Sq.ft. )26
None Booked0% Booked
0% Booked
32 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Aster Wing-ACompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Aster Wing-B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Aster Wing-BJan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL701.69 Sq.mts. ( 7553 Sq.ft. )28
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Aster Wing-BCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Aster Wing-C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Aster Wing-CJan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL56 Sq.mts. ( 603 Sq.ft. )5
None Booked0% Booked
0% Booked
RESIDENTIAL548.4 Sq.mts. ( 5903 Sq.ft. )24
None Booked0% Booked
0% Booked
29 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Aster Wing-CCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Aster Wing-D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Aster Wing-DJan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL135.56 Sq.mts. ( 1459 Sq.ft. )11
None Booked0% Booked
0% Booked
RESIDENTIAL566.5 Sq.mts. ( 6098 Sq.ft. )24
None Booked0% Booked
0% Booked
35 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Aster Wing-DCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Nine Homemakers
for Project
Nine Star Landmark Ph-I Bldg-1 Aster
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation