Project overview

Nicon Vista- Building No. 8, Wing G And H is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000052550. Nicon Vista- Building No. 8, Wing G And H is located at 277 Hissa No 2 And 3. This is a New being developed by Veer Highlands Llp.

Nicon Vista- Building No. 8, Wing G And H has 1 BHK & 2 BHK Apartments with carpet areas ranging from 296 to 454 Sq.ft. Carpet. The Project has total 173 of which 101 are currently available for sale.

Nicon Vista- Building No. 8, Wing G And H is being developed on a total land area of 80532 Sq.ft. Nicon Vista- Building No. 8, Wing G And H has 2 Wings / Towers Nicon Vista Building No 8 Wing G,Nicon Vista Building No 8 Wing H

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nicon Vista- Building No. 8, Wing G And H
  • Location:
  • 277 Hissa No 2 And 3
  • Const. Stage:
    New
  • Possession:
    31 Dec 2027
Developer Details

  • Developer:
    Veer Highlands Llp
  • Phone:
  • Address:
  • Real Homes Building No 13
Project RERA Details
MAHA REARA No: P99000052550
Project Type Residential / Group Housing
RERA Project Status New
Architect Sanat Mehta & Associates
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 01 Feb 2024
Last Retrived 28 Jul 2025
Nicon Vista- Building No. 8, Wing G And H QR Code
Nicon Vista- Building No. 8, Wing G And H
MahaRERA - P99000052550
Apartment Details & Configuration
TypeArea
2 BHK38.59 Sq.mts. ( 415 Sq.ft. )
2 BHK41.69 Sq.mts. ( 449 Sq.ft. )
2 BHK44.53 Sq.mts. ( 479 Sq.ft. )
3 BHK49.31 Sq.mts. ( 531 Sq.ft. )
3 BHK49.65 Sq.mts. ( 534 Sq.ft. )
Office space95.34 Sq.mts. ( 1026 Sq.ft. )
Shop10.27 Sq.mts. ( 111 Sq.ft. )
Shop14.1 Sq.mts. ( 152 Sq.ft. )
Shop14.7 Sq.mts. ( 158 Sq.ft. )
Shop15.26 Sq.mts. ( 164 Sq.ft. )
Shop16.01 Sq.mts. ( 172 Sq.ft. )
Shop16.4 Sq.mts. ( 177 Sq.ft. )
1 BHK27.53 Sq.mts. ( 296 Sq.ft. )
1 BHK27.57 Sq.mts. ( 297 Sq.ft. )
1 BHK28.57 Sq.mts. ( 308 Sq.ft. )
2 BHK35.24 Sq.mts. ( 379 Sq.ft. )
2 BHK39.15 Sq.mts. ( 421 Sq.ft. )
2 BHK39.68 Sq.mts. ( 427 Sq.ft. )
2 BHK42.19 Sq.mts. ( 454 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nicon Vista- Building No. 8, Wing G And Hlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
0
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
Na
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)93% completed
93% Complete
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
0
Water Conservation, Rain water Harvesting
0
Water Supply35% completed
35% Complete
0
Buildings / Wings in Nicon Vista- Building No. 8, Wing G And H
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nicon Vista- Building No. 8, Wing G And H by Veer Highlands Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

80532 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

173 apartments in total
Total
173
Booked
72
Available
101

Saleable Area Statistics (Sq. ft.)

68158 Total
Total
68158
Booked
28303
Available
39854
Total 173 apartments in project. 72 apartments booked. 41% apartments booked.
Total 68158 Sq.ft. saleable area. 28303 saleable area booked.
42% area booked.

Nicon Vista Building No 8 Wing G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Nicon Vista Building No 8 Wing GDec 202719101008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK38.59 Sq.mts. ( 415 Sq.ft. )19
7 Booked36% Booked
36% Booked
2 BHK41.69 Sq.mts. ( 449 Sq.ft. )15
9 Booked60% Booked
60% Booked
2 BHK44.53 Sq.mts. ( 479 Sq.ft. )15
8 Booked53% Booked
53% Booked
3 BHK49.31 Sq.mts. ( 531 Sq.ft. )3
2 Booked66% Booked
66% Booked
3 BHK49.65 Sq.mts. ( 534 Sq.ft. )3
2 Booked66% Booked
66% Booked
Office space95.34 Sq.mts. ( 1026 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.27 Sq.mts. ( 111 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.1 Sq.mts. ( 152 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.7 Sq.mts. ( 158 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.26 Sq.mts. ( 164 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.01 Sq.mts. ( 172 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.4 Sq.mts. ( 177 Sq.ft. )1
None Booked0% Booked
0% Booked
62 total apartments / 28 apartments booked. 45% apartments booked.
Work Description in Building Nicon Vista Building No 8 Wing GCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress33% done
33% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress73% done
73% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress75% done
75% Booked

Nicon Vista Building No 8 Wing H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Nicon Vista Building No 8 Wing HDec 2027191010034
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.53 Sq.mts. ( 296 Sq.ft. )16
8 Booked50% Booked
50% Booked
1 BHK27.57 Sq.mts. ( 297 Sq.ft. )19
13 Booked68% Booked
68% Booked
1 BHK28.57 Sq.mts. ( 308 Sq.ft. )16
6 Booked37% Booked
37% Booked
2 BHK35.24 Sq.mts. ( 379 Sq.ft. )3
1 Booked33% Booked
33% Booked
2 BHK39.15 Sq.mts. ( 421 Sq.ft. )19
10 Booked52% Booked
52% Booked
2 BHK39.68 Sq.mts. ( 427 Sq.ft. )19
None Booked0% Booked
0% Booked
2 BHK42.19 Sq.mts. ( 454 Sq.ft. )19
6 Booked31% Booked
31% Booked
111 total apartments / 44 apartments booked. 39% apartments booked.
Work Description in Building Nicon Vista Building No 8 Wing HCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress33% done
33% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress73% done
73% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress75% done
75% Booked
Channel Partners
Channel Partners Registered by Developer
Veer Highlands Llp
for Project
Nicon Vista- Building No. 8, Wing G And H
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation