Project overview

Nice World 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700030809. Nice World 1 is located at Survey No 55 Part, 56 Part And 58 Part. This is a New being developed by Nice Builders.

Nice World 1 has 2 BHK, 3 BHK, Office space & Shop Apartments with carpet areas ranging from 1192 to 1025 Sq.ft. Carpet. The Project has total 708 of which 323 are currently available for sale.

Nice World 1 is being developed on a total land area of 186082 Sq.ft. Nice World 1 has 4 Wings / Towers B1,B2,B3,B4

ProjectDeveloperLocationPossession
M M Valley C1Alfa Enterprises55,56,57 P31-12-2018 00:00:00
Prime NestMagnus EnterprisesThane, 40061231-03-2020 00:00:00
S K ResidencyIttehad Builders And Developers121/1 And 122/230-04-2021 00:00:00
Sd EmpireEmpire Developers78/1/330-06-2025 00:00:00
Nice World 1Nice BuildersSurvey No 55 Part, 56 Part And 58 Part31-12-2031 00:00:00
BellavistaNoori Builders And DevelopersS. No. 120/1A, 120/1B, 120/1C31-12-2025 00:00:00
BellamonteAbubakar Ali Mohammed Zariwala105/2, 108/1B, 109/1B28-05-2021 00:00:00
Ewar ComplexEwar Constructions Private Limited110 1A/1B30-06-2019 00:00:00
Huda ParkHuda Construction90,93/3/1/P30-12-2024 00:00:00
M M Valey A2Alfa Enterprises55,56,57 P30-12-2022 00:00:00
Peace ParkPeace Enterprises400612, Thane31-03-2019 00:00:00
Silver EnclaveSilverline Building & Constructions LlpS N 154 H N 531-03-2020 00:00:00
Yes Central Galleria 1Yes EnterprisesSurvey No 69/131-10-2026 00:00:00
Sky Heights Tower No. 3Virani Construction Company38/1, 39/1 & 40/131-12-2030 00:00:00
AvenueBuildbrick Builders And Developers65/331-12-2028 00:00:00
Noble HeightNoble ConstructionsSurvey No108, Hissa No 2A And Survey No 120 Hissa No 3D30-03-2023 00:00:00
K K ResidencyItnoa Construction Private LimitedThane, 42120431-12-2020 00:00:00
Grace Square Type D5Shree Sumatinath Enterprises LlpSurvey No. 4301-12-2022 00:00:00
Project Details
  • Project:
    Nice World 1
  • Location:
  • Survey No 55 Part, 56 Part And 58 Part
  • Const. Stage:
    New
  • Possession:
    31 Dec 2031
Developer Details

  • Developer:
    Nice Builders
  • Phone:
  • Address:
  • Hissa No 2
Project RERA Details
MAHA REARA No: P51700030809
Project Type Residential / Group Housing
RERA Project Status New
Architect Right Angle
Funding Bank INDIAN BANK
Proposed Possession 31 Dec 2031
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 Sep 2021
Last Retrived 26 Jul 2025
Nice World 1 QR Code
Nice World 1
MahaRERA - P51700030809
Apartment Details & Configuration
TypeArea
2 BHK56.58 Sq.mts. ( 609 Sq.ft. )
3 BHK74.96 Sq.mts. ( 807 Sq.ft. )
Office space76.6 Sq.mts. ( 825 Sq.ft. )
Office space37.6 Sq.mts. ( 405 Sq.ft. )
Shop54.22 Sq.mts. ( 584 Sq.ft. )
Shop62.64 Sq.mts. ( 674 Sq.ft. )
Shop62.82 Sq.mts. ( 676 Sq.ft. )
Shop65.65 Sq.mts. ( 707 Sq.ft. )
Shop72.36 Sq.mts. ( 779 Sq.ft. )
Shop80.53 Sq.mts. ( 867 Sq.ft. )
Shop95.22 Sq.mts. ( 1025 Sq.ft. )
Shop110.77 Sq.mts. ( 1192 Sq.ft. )
Shop115.31 Sq.mts. ( 1241 Sq.ft. )
Shop129.18 Sq.mts. ( 1390 Sq.ft. )
Shop141.45 Sq.mts. ( 1523 Sq.ft. )
1 BHK40.44 Sq.mts. ( 435 Sq.ft. )
Office space45.9 Sq.mts. ( 494 Sq.ft. )
Office space61.48 Sq.mts. ( 662 Sq.ft. )
Shop66.07 Sq.mts. ( 711 Sq.ft. )
Shop88.73 Sq.mts. ( 955 Sq.ft. )
Shop114.97 Sq.mts. ( 1238 Sq.ft. )
Shop154.97 Sq.mts. ( 1668 Sq.ft. )
Shop48.12 Sq.mts. ( 518 Sq.ft. )
Shop23.78 Sq.mts. ( 256 Sq.ft. )
Shop41.49 Sq.mts. ( 447 Sq.ft. )
Shop49.54 Sq.mts. ( 533 Sq.ft. )
Shop47.6 Sq.mts. ( 512 Sq.ft. )
Shop54.63 Sq.mts. ( 588 Sq.ft. )
Shop56.5 Sq.mts. ( 608 Sq.ft. )
Shop57.64 Sq.mts. ( 620 Sq.ft. )
Shop62.54 Sq.mts. ( 673 Sq.ft. )
Shop70.71 Sq.mts. ( 761 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nice World 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
To Be Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
To Be Completed
Energy management
Only Solar Water Heater To Be Completed
Fire Protection And Fire Safety Requirements
To Be Completed
Landscaping & Tree Planting
Required No. Of Plants To Be Planted
Open Parking
To Be Completed
Sewerage (Chamber, Lines, Septic Tank , STP)
To Be Completed
Solid Waste Management And Disposal
To Be Completed
Storm Water Drains
To Be Completed
Street Lighting
To Be Completed
Treatment And Disposal Of Sewage And Sullage Water
To Be Completed
Water Conservation, Rain water Harvesting
To Be Completed
Water Supply
To Be Completed
Buildings / Wings in Nice World 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nice World 1 by Nice Builderslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

186082 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

708 apartments in total
Total
708
Booked
385
Available
323

Saleable Area Statistics (Sq. ft.)

472063 Total
Total
472063
Booked
243781
Available
228282
Total 708 apartments in project. 385 apartments booked. 54% apartments booked.
Total 472063 Sq.ft. saleable area. 243781 saleable area booked.
52% area booked.

B1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B1Dec 2031221010011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK56.58 Sq.mts. ( 609 Sq.ft. )80
55 Booked68% Booked
68% Booked
3 BHK74.96 Sq.mts. ( 807 Sq.ft. )80
35 Booked43% Booked
43% Booked
Office space76.6 Sq.mts. ( 825 Sq.ft. )6
None Booked0% Booked
0% Booked
Office space37.6 Sq.mts. ( 405 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop54.22 Sq.mts. ( 584 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop62.64 Sq.mts. ( 674 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop62.82 Sq.mts. ( 676 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop65.65 Sq.mts. ( 707 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop72.36 Sq.mts. ( 779 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop80.53 Sq.mts. ( 867 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop95.22 Sq.mts. ( 1025 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop110.77 Sq.mts. ( 1192 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop115.31 Sq.mts. ( 1241 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop129.18 Sq.mts. ( 1390 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop141.45 Sq.mts. ( 1523 Sq.ft. )1
1 Booked100% Booked
100% Booked
190 total apartments / 101 apartments booked. 53% apartments booked.
Work Description in Building B1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress44% done
44% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress65% done
65% Booked

B2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B2Dec 203122101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.44 Sq.mts. ( 435 Sq.ft. )120
91 Booked75% Booked
75% Booked
Office space45.9 Sq.mts. ( 494 Sq.ft. )3
None Booked0% Booked
0% Booked
Office space61.48 Sq.mts. ( 662 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop66.07 Sq.mts. ( 711 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop88.73 Sq.mts. ( 955 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop114.97 Sq.mts. ( 1238 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop154.97 Sq.mts. ( 1668 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop48.12 Sq.mts. ( 518 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop23.78 Sq.mts. ( 256 Sq.ft. )4
2 Booked50% Booked
50% Booked
138 total apartments / 95 apartments booked. 68% apartments booked.
Work Description in Building B2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress44% done
44% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress65% done
65% Booked

B3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B3Dec 203122101009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK56.58 Sq.mts. ( 609 Sq.ft. )80
68 Booked85% Booked
85% Booked
3 BHK74.96 Sq.mts. ( 807 Sq.ft. )80
28 Booked35% Booked
35% Booked
Office space76.6 Sq.mts. ( 825 Sq.ft. )6
2 Booked33% Booked
33% Booked
Office space37.6 Sq.mts. ( 405 Sq.ft. )6
2 Booked33% Booked
33% Booked
Shop41.49 Sq.mts. ( 447 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop49.54 Sq.mts. ( 533 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop54.22 Sq.mts. ( 584 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop80.53 Sq.mts. ( 867 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop95.22 Sq.mts. ( 1025 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop110.77 Sq.mts. ( 1192 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop115.31 Sq.mts. ( 1241 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop129.18 Sq.mts. ( 1390 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop141.45 Sq.mts. ( 1523 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop65.65 Sq.mts. ( 707 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop72.36 Sq.mts. ( 779 Sq.ft. )2
None Booked0% Booked
0% Booked
190 total apartments / 106 apartments booked. 55% apartments booked.
Work Description in Building B3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress45% done
45% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress45% done
45% Booked
Sanitary Fittings within the flats / premises
work-in-progress45% done
45% Booked
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress45% done
45% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked

B4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B4Dec 2031221010013
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK56.58 Sq.mts. ( 609 Sq.ft. )80
58 Booked72% Booked
72% Booked
3 BHK74.96 Sq.mts. ( 807 Sq.ft. )80
16 Booked20% Booked
20% Booked
Office space76.6 Sq.mts. ( 825 Sq.ft. )6
None Booked0% Booked
0% Booked
Office space37.6 Sq.mts. ( 405 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop47.6 Sq.mts. ( 512 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop54.63 Sq.mts. ( 588 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop56.5 Sq.mts. ( 608 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop57.64 Sq.mts. ( 620 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop62.54 Sq.mts. ( 673 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop70.71 Sq.mts. ( 761 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop95.22 Sq.mts. ( 1025 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop110.77 Sq.mts. ( 1192 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop115.31 Sq.mts. ( 1241 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop129.18 Sq.mts. ( 1390 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop141.45 Sq.mts. ( 1523 Sq.ft. )1
1 Booked100% Booked
100% Booked
190 total apartments / 83 apartments booked. 43% apartments booked.
Work Description in Building B4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress30% done
30% Booked
Sanitary Fittings within the flats / premises
work-in-progress30% done
30% Booked
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked
Channel Partners
Channel Partners Registered by Developer
Nice Builders
for Project
Nice World 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation