Project overview

New Model Town Complex is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700015557. New Model Town Complex is located at 464 2 467 A Pt 105 A 1 Pt 105 A 2. This is a New being developed by Qavi Construction Pvt. Ltd..

New Model Town Complex has 1 BHK Apartments with carpet areas ranging from 432 to 455 Sq.ft. Carpet. The Project has total 152 of which 67 are currently available for sale.

New Model Town Complex is being developed on a total land area of 67929 Sq.ft. out of which 8246 Sq.ft. i.e 12% is reserved for recreational purposes. New Model Town Complex has 5 Wings / Towers A Type Unit 01,A Type Unit 02,B Type,C Type,D Type

ProjectDeveloperLocationPossession
Shantaram Park ResidencyShubha Developers51/301-08-2021 00:00:00
Jollly Apartment Wing A And BRiel Infrastructure Pvt Ltd92/131-12-2019 00:00:00
Parisparsh SwapnotsavParisparsh284,285,28601-09-2019 00:00:00
La LuxuriaRj Enterprises45/1 45/231-12-2025 00:00:00
SarojiniJay Service And ConsultantCts No 3231-12-2025 00:00:00
Sai PalaceVardhaman Developers72/A31-10-2026 00:00:00
Parul ApartmentsMotichand Nathu GosraniGut No 126, Plot No 32 & 3331-12-2024 00:00:00
Silver ParkMahalaxmi DevelopersCts No 472/4 Plot No 431-12-2025 00:00:00
Silver Oak ApartmentAshokkumar Topanlal DewaniGut No.35/B, Plot No. 4531-03-2025 00:00:00
Laxmi ResidencySanjay WadileThane11-09-2019 00:00:00
New Model Town ComplexQavi Construction Pvt. Ltd.464 2 467 A Pt 105 A 1 Pt 105 A 216-01-2023 00:00:00
Ramanath ApartmentSarvesh ConstructionCts No 89,66031-12-2025 00:00:00
Vighnahar ApartmentRohil EnterprisesGut No 106 Plot No 18(106/18)30-11-2024 00:00:00
Shri Hari Vitthal ViharAj HomesSurvey No 83/A/2/A Plot N0 131-08-2027 00:00:00
Project Details
  • Project:
    New Model Town Complex
  • Location:
  • 464 2 467 A Pt 105 A 1 Pt 105 A 2
  • Const. Stage:
    New
  • Possession:
    16 Jan 2023
Developer Details

  • Developer:
    Qavi Construction Pvt. Ltd.
  • Phone:
  • Address:
  • Shakuntala Apartment Co. Op. Hsg.Soc.
Project RERA Details
MAHA REARA No: P51700015557
Project Type Residential / Group Housing
RERA Project Status New
Architect Archilogic Consultants
Funding Bank HDFC BANK
Proposed Possession 16 Jan 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Mar 2018
Last Retrived 26 Jul 2025
New Model Town Complex QR Code
New Model Town Complex
MahaRERA - P51700015557
Apartment Details & Configuration
TypeArea
1 BHK40.11 Sq.mts. ( 432 Sq.ft. )
1 BHK40.25 Sq.mts. ( 433 Sq.ft. )
1 BHK41.4 Sq.mts. ( 446 Sq.ft. )
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )
1 BHK43.93 Sq.mts. ( 473 Sq.ft. )
1 BHK45.66 Sq.mts. ( 491 Sq.ft. )
1 BHK42.9 Sq.mts. ( 462 Sq.ft. )
1 BHK43.15 Sq.mts. ( 464 Sq.ft. )
1 BHK43.53 Sq.mts. ( 469 Sq.ft. )
1 BHK43.75 Sq.mts. ( 471 Sq.ft. )
1 BHK42.27 Sq.mts. ( 455 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of New Model Town Complexlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in New Model Town Complex
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of New Model Town Complex by Qavi Construction Pvt. Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

67929 Sq. ft.

Project Area

8246 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

152 apartments in total
Total
152
Booked
85
Available
67

Saleable Area Statistics (Sq. ft.)

68257 Total
Total
68257
Booked
38642
Available
29615
Total 152 apartments in project. 85 apartments booked. 55% apartments booked.
Total 68257 Sq.ft. saleable area. 38642 saleable area booked.
57% area booked.

A Type Unit 01

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A Type Unit 01Jan 20225101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.11 Sq.mts. ( 432 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK40.25 Sq.mts. ( 433 Sq.ft. )16
15 Booked93% Booked
93% Booked
1 BHK41.4 Sq.mts. ( 446 Sq.ft. )16
14 Booked87% Booked
87% Booked
36 total apartments / 33 apartments booked. 91% apartments booked.
Work Description in Building A Type Unit 01Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

A Type Unit 02

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A Type Unit 02Jan 20225101007
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.11 Sq.mts. ( 432 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK40.25 Sq.mts. ( 433 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )16
None Booked0% Booked
0% Booked
36 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A Type Unit 02Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Type

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B TypeJan 20225101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.11 Sq.mts. ( 432 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK41.4 Sq.mts. ( 446 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK43.93 Sq.mts. ( 473 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK45.66 Sq.mts. ( 491 Sq.ft. )8
8 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building B TypeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Type

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C TypeJan 20225101008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.9 Sq.mts. ( 462 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK43.15 Sq.mts. ( 464 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK43.53 Sq.mts. ( 469 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK43.75 Sq.mts. ( 471 Sq.ft. )12
8 Booked66% Booked
66% Booked
32 total apartments / 28 apartments booked. 87% apartments booked.
Work Description in Building C TypeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Type

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D TypeJan 20224101004
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.11 Sq.mts. ( 432 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK41.4 Sq.mts. ( 446 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK42.27 Sq.mts. ( 455 Sq.ft. )8
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D TypeCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Qavi Construction Pvt. Ltd.
for Project
New Model Town Complex
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation