Project overview

Nest Lotus is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000010260. Nest Lotus is located at 133. This is a Ongoing being developed by Nest Enterprises.

Nest Lotus has 1 BHK, 1RK & SHOP Apartments with carpet areas ranging from 112 to 374 Sq.ft. Carpet. The Project has total 89 of which 41 are currently available for sale.

Nest Lotus is being developed on a total land area of 24119 Sq.ft. Nest Lotus has 3 Wings / Towers Type C Wing A,Type D Wing B,Type E Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nest Lotus
  • Location:
  • 133
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Nest Enterprises
  • Phone:
  • Address:
  • Mrud Kishore Chs
Project RERA Details
MAHA REARA No: P99000010260
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Wade And Associates
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 24 Aug 2017
Last Retrived 28 Jul 2025
Nest Lotus QR Code
Nest Lotus
MahaRERA - P99000010260
Apartment Details & Configuration
TypeArea
1 BHK33.94 Sq.mts. ( 365 Sq.ft. )
1 BHK34.44 Sq.mts. ( 371 Sq.ft. )
1 RK22.88 Sq.mts. ( 246 Sq.ft. )
2 BHK42.6 Sq.mts. ( 459 Sq.ft. )
2 BHK43.11 Sq.mts. ( 464 Sq.ft. )
1 BHK34.29 Sq.mts. ( 369 Sq.ft. )
1 BHK33.92 Sq.mts. ( 365 Sq.ft. )
1 BHK34.49 Sq.mts. ( 371 Sq.ft. )
1 BHK34.5 Sq.mts. ( 371 Sq.ft. )
1 BHK34.73 Sq.mts. ( 374 Sq.ft. )
1 BHK34.78 Sq.mts. ( 374 Sq.ft. )
1RK21.62 Sq.mts. ( 233 Sq.ft. )
SHOP10.43 Sq.mts. ( 112 Sq.ft. )
SHOP12.58 Sq.mts. ( 135 Sq.ft. )
SHOP13.12 Sq.mts. ( 141 Sq.ft. )
SHOP13.29 Sq.mts. ( 143 Sq.ft. )
SHOP15.4 Sq.mts. ( 166 Sq.ft. )
SHOP15.58 Sq.mts. ( 168 Sq.ft. )
SHOP16.58 Sq.mts. ( 178 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nest Lotuslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Garden
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septic Tank Chamber Line
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Borewell
Buildings / Wings in Nest Lotus
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nest Lotus by Nest Enterpriseslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

24119 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

89 apartments in total
Total
89
Booked
48
Available
41

Saleable Area Statistics (Sq. ft.)

30499 Total
Total
30499
Booked
16432
Available
14067
Total 89 apartments in project. 48 apartments booked. 53% apartments booked.
Total 30499 Sq.ft. saleable area. 16432 saleable area booked.
54% area booked.

Type C Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type C Wing ADec 20185100050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.94 Sq.mts. ( 365 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK34.44 Sq.mts. ( 371 Sq.ft. )20
9 Booked45% Booked
45% Booked
1 RK22.88 Sq.mts. ( 246 Sq.ft. )10
6 Booked60% Booked
60% Booked
2 BHK42.6 Sq.mts. ( 459 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK43.11 Sq.mts. ( 464 Sq.ft. )4
2 Booked50% Booked
50% Booked
38 total apartments / 21 apartments booked. 55% apartments booked.
Work Description in Building Type C Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress54% done
54% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress66% done
66% Booked
Sanitary Fittings within the flats / premises
work-in-progress66% done
66% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress71% done
71% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress71% done
71% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Type D Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type D Wing BDec 20185100050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.94 Sq.mts. ( 365 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK34.29 Sq.mts. ( 369 Sq.ft. )8
4 Booked50% Booked
50% Booked
1 BHK34.44 Sq.mts. ( 371 Sq.ft. )8
4 Booked50% Booked
50% Booked
18 total apartments / 10 apartments booked. 55% apartments booked.
Work Description in Building Type D Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress54% done
54% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress66% done
66% Booked
Sanitary Fittings within the flats / premises
work-in-progress66% done
66% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress71% done
71% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress71% done
71% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Type E Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type E Wing CDec 20185100050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.92 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.44 Sq.mts. ( 371 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK34.49 Sq.mts. ( 371 Sq.ft. )12
4 Booked33% Booked
33% Booked
1 BHK34.5 Sq.mts. ( 371 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK34.73 Sq.mts. ( 374 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.78 Sq.mts. ( 374 Sq.ft. )3
1 Booked33% Booked
33% Booked
1RK21.62 Sq.mts. ( 233 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP10.43 Sq.mts. ( 112 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP12.58 Sq.mts. ( 135 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.12 Sq.mts. ( 141 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.29 Sq.mts. ( 143 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.4 Sq.mts. ( 166 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.58 Sq.mts. ( 168 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP16.58 Sq.mts. ( 178 Sq.ft. )1
None Booked0% Booked
0% Booked
33 total apartments / 17 apartments booked. 51% apartments booked.
Work Description in Building Type E Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress54% done
54% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress66% done
66% Booked
Sanitary Fittings within the flats / premises
work-in-progress66% done
66% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress71% done
71% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress71% done
71% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Nest Enterprises
for Project
Nest Lotus
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation